Work Breakdown Structure Essay

Satisfactory Essays

Introduction In this paper, I will cover work breakdown structure (WBS), cost estimates, price to win (PTW) cost approach, strategies to prevent unethical practices, and promote compliance with federal guidelines. Develop three rules and three assumptions that are conditional to the cost estimate.
A work breakdown structure is a way of organizing team’s work into smaller sections which make it easier to handle instead of one big project. This will increase productivity and easier to manage throughout the process.
Work Breakdown Structure
1.0 Renovate Bldg. 222
1.1 Homework
1.1.1 Paperwork
1.1.1.1 Bldg. 222 Blueprints
1.1.1.2 Permits
1.1.1.3 Engineers
1.1.1.4 Designers
1.1.1.5 Budget Analysis
1.1.2 Foundation
1.1.2.1 Research
1.1.2.2 Test and Gather Information
1.1.2.3 Do work
1.1.3 Plumbing
1.1.3.1 Research
1.1.3.2 Test and Gather Information
1.1.3.3 Do Work
1.1.4 Electrical
1.1.4.1 Research
1.1.4.2 Test and Gather Information
1.1.4.3 Do Work
1.1.5 Make Ready Crew
1.1.5.1 Research
1.1.5.2 Test and Gather Information
1.1.5.3 Do Work
1.1.6 Office Design
1.1.6.1 Research
1.1.6.2 Test and Gather Information
1.1.6.3 Do Work
1.2 Office Equipment
1.2.1.1 Install Office Equipment
1.2.1.2 Training Customers
1.2.1.3 Order Supplies
1.2.1.4 Schedule All Services

Cost Estimates
PROGRAM SUMMARY

Total Program
Cost Elements:

Direct Labor

2,000,000
Labor Overhead 100%

2,000,000
Total Labor

4,000,000

Direct Material

A) Purchased Parts

Get Access