1, Assume you are managing a manufacturing line consisting of two workstations: Decambering and Hemming. The mean effective process time of the first machine is 15 minutes and its coefficient of variation is 1 (i.e., exponential distribution). The second machine has the same cofficient of variation, but this machine takes 14 minutes to process a part. (a) If there is an infinite buffer between the machines, compute the expected WIP, CT, and TH. WIP: TH: CT (b) Now assume that there is enough space for only 3 parts between the machines (Hint: the buffer size, b, is 3.) Recompute the expected WIP, CT, and TH. Compare with Part a. WIP: TH: CT:

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Pls solve it quickly

1, Assume you are managing a manufacturing line consisting of two workstations: Decambering
and Hemming. The mean effective process time of the first machine is 15 minutes and its
coefficient of variation is 1 (i.e., exponential distribution). The second machine has the same
coefficient of variation, but this machine takes 14 minutes to process a part.
(a) If there is an infinite buffer between the machines, compute the expected WIP, CT, and TH.
WIP:
TH:
CT
(b) Now assume that there is enough space for only 3 parts between the machines (Hint: the
buffer size, b, is 3.) Recompute the expected WIP, CT, and TH. Compare with Part a.
WIP:
TH:
CT:
Transcribed Image Text:1, Assume you are managing a manufacturing line consisting of two workstations: Decambering and Hemming. The mean effective process time of the first machine is 15 minutes and its coefficient of variation is 1 (i.e., exponential distribution). The second machine has the same coefficient of variation, but this machine takes 14 minutes to process a part. (a) If there is an infinite buffer between the machines, compute the expected WIP, CT, and TH. WIP: TH: CT (b) Now assume that there is enough space for only 3 parts between the machines (Hint: the buffer size, b, is 3.) Recompute the expected WIP, CT, and TH. Compare with Part a. WIP: TH: CT:
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman