A concrete column and footing is shown in the figure below. It is desired to estimate the required amount of concrete, forms, and excavation for its construction. As a usual practice, the footing can be poured directly without any forms. 600 mm 00 Ground Surface 7.52 O 6.12 OE11 Which of the following most nearly gives the required area of plywood needed for the column in square meters? 5.85 15 450 mm 3 m 4.3 450 mm 046 2m Which of the following most nearly gives the required volume of excavation in cubic meters? 0 14 O 10 012 2 m 2m Which of the following most nearly gives the required volume of concrete in cubic meters? 04.1 048

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

PROVIDE COMPLETE SOLUTION

A concrete column and footing is shown in the figure below. It is desired to estimate the required
amount of concrete, forms, and excavation for its construction. As a usual practice, the footing
can be poured directly without any forms.
600 mm
Ground Surface
7.52
6.12
OE11
O
5.85
Which of the following most nearly gives the required area of plywood needed for the column in
square meters?
10
0 12
15
450 mm
Which of the following most nearly gives the required volume of excavation in cubic meters?
014
48
3 m
43
450 mm
0 4.6
2 m
2 m
2m
Which of the following most nearly cives the required volume of concrete in cubic meters?
04.1
Transcribed Image Text:A concrete column and footing is shown in the figure below. It is desired to estimate the required amount of concrete, forms, and excavation for its construction. As a usual practice, the footing can be poured directly without any forms. 600 mm Ground Surface 7.52 6.12 OE11 O 5.85 Which of the following most nearly gives the required area of plywood needed for the column in square meters? 10 0 12 15 450 mm Which of the following most nearly gives the required volume of excavation in cubic meters? 014 48 3 m 43 450 mm 0 4.6 2 m 2 m 2m Which of the following most nearly cives the required volume of concrete in cubic meters? 04.1
Expert Solution
steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Issues during construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning