A field hospital is supplied by electricity from a single working generator of constant failure rate λ = 0.0005 per hour. Power is required 24 hours per day. Preventive maintenance is carried out at six-week intervals. To ensure that the electric power supply is at least 95% reliable throughout this period, it is decided to introduce extra generators on cold standby. The failure rate of the generator on cold standby is negligible. The reliability of the switching mechanism is 0.98 per demand. Determine the minimum number of standby generators required to meet the reliability performance target.
A field hospital is supplied by electricity from a single working generator of constant failure rate λ = 0.0005 per hour. Power is required 24 hours per day. Preventive maintenance is carried out at six-week intervals. To ensure that the electric power supply is at least 95% reliable throughout this period, it is decided to introduce extra generators on cold standby. The failure rate of the generator on cold standby is negligible. The reliability of the switching mechanism is 0.98 per demand. Determine the minimum number of standby generators required to meet the reliability performance target.
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter11: Transient Stability
Section: Chapter Questions
Problem 11.19P
Related questions
Question
A field hospital is supplied by electricity from a single working generator of
constant failure rate λ = 0.0005 per hour. Power is required 24 hours per day.
Preventive maintenance is carried out at six-week intervals. To ensure that the
electric power supply is at least 95% reliable throughout this period, it is decided
to introduce extra generators on cold standby. The failure rate of the generator
on cold standby is negligible. The reliability of the switching
per demand. Determine the minimum number of standby generators required to
meet the reliability performance target.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 5 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning