A weighing tank in a water treatment plant weighs 1,200 N when empty and 36,000 N when filled with water (at 20°C, p-1000 kg/m') that flows from an open channel. If the time taken to fill the tank was 3 minutes, what was the volumetric flow rate (m'/s) passing through the channel?

Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
5th Edition
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Saeed Moaveni
Chapter10: Force And Force-related Variables In Engineering
Section: Chapter Questions
Problem 45P
icon
Related questions
Question
A weighing tank in a water treatment plant weighs 1,200 N when empty and 36,000 N when filled
with water (at 20°C, p=1000 kg/m³) that flows from an open channel. If the time taken to fill the tank
was 3 minutes, what was the volumetric flow rate (m/s) passing through the channel?
Transcribed Image Text:A weighing tank in a water treatment plant weighs 1,200 N when empty and 36,000 N when filled with water (at 20°C, p=1000 kg/m³) that flows from an open channel. If the time taken to fill the tank was 3 minutes, what was the volumetric flow rate (m/s) passing through the channel?
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Environmental design and construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning