An installation consists of an induction motor and a heater load. The induction motor takes 25 KVA at 0.8 PF lagging. The rating of the heater operating at the unity PF so that the overall PF become 0.9 lagging.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.27P: An industrial load consisting of a bank of induction motors consumes 50 kW at a power factor of 0.8...
icon
Related questions
Question
100%

An installation consists of an induction motor and a heater load. The induction motor takes 25 KVA at 0.8 PF lagging. The rating of the heater operating at the unity PF so that the overall PF become 0.9 lagging.

Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Alternating Current (AC) Series Motor and Universal Motor
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning