It costs Gordon R10 to move 1 work piece one metre Calculate the daily total material handling cost of this layout.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
M
团
LL
过
R
Quèstion 5
Gordon Miller's job shop has three work areas - machining (M), dipping in a chemical bath (D) and plating (P).
The number of work pieces moved per day and the distances between the work areas (in metres), folow:
Pieces Moved between Work Areas Each Day:
M
23
32
Distances between Centers of work Areas in metres
D.
It costs Gordon R10 to move 1 work piece one metre
Calculate the daily total material handling cost of this layout.
24°C
Mostly sunny
F1
F5
F7
F8
F10
61
23
&
2.
3.
4.
5.
6.
7.
8.
6.
G
K
H.
N
Alt
Alt
ideapad S145
2-side Narrow
Transcribed Image Text:M 团 LL 过 R Quèstion 5 Gordon Miller's job shop has three work areas - machining (M), dipping in a chemical bath (D) and plating (P). The number of work pieces moved per day and the distances between the work areas (in metres), folow: Pieces Moved between Work Areas Each Day: M 23 32 Distances between Centers of work Areas in metres D. It costs Gordon R10 to move 1 work piece one metre Calculate the daily total material handling cost of this layout. 24°C Mostly sunny F1 F5 F7 F8 F10 61 23 & 2. 3. 4. 5. 6. 7. 8. 6. G K H. N Alt Alt ideapad S145 2-side Narrow
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,