Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per hour. The capacity of the second resource is 10 meals per hour. Demand for this process is 72 meals per hour. Instruction: Round your answer to three decimal piaces. What is the cycle time of this process (in minutes)? minutes
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Given, Waiting time before the start of the batch = 2 hours Setup time = 2 hours Waiting time for…
Q: Travelers are the flow unit in a process with two resources. The capacities of the resources are 1.3…
A: Utilization is nothing but the process of making efficient or practical use of anything. Utilization…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 12.75…
A: Find the given details below: Given details: Flow time 12.75 hours Waiting time before…
Q: What is the maximum utilization a resource can achieve?a. A value equal to the demandb. A value…
A: d. 1.00
Q: Quick Stop Pharmacy is a small family-owned drug com-pounding business in Portland Oregon that is…
A: In the above question the for ascertaining the number of patients to be dealt with in one hour, we…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: Cubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes…
A: Here, First, I would draw the flow chart for this application case or situation, the flow chart is…
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: In a company that processes insurance claims, the aver- age flow rate is 10 claims per hour and the…
A: Average number of claims=Average flow rate×Average throughput time=10×6=60 claims Hence, the average…
Q: Suppose Dunkin Donuts prepares its Munchkins before opening each day. Each batch consists of 500…
A: Given, Batch size = 500 Setup time = 15 minutes Processing time = 1 minute
Q: In a company that processes insurance claims, the average flow rate is 10 claims per-hour and the…
A: Average claims in the system = T*R = 6*10 = 60 claims on average On the basis of…
Q: Diners are served in a process with two resources. The first resource has a capacity of 0.9 diners…
A: The total labor content is defined as the time sum of all process steps. First Resource Capacity =…
Q: Clients are served in a process with two resources. The first resource has a capacity of 14 clients…
A: Given data: Capacity for the first resource = 14 client/hour Capacity for the second resource = 15…
Q: What is the effect of waiting time on a manufacturing process? Why is it good to reduce waiting…
A: Waiting time essentially affects producing measure. The longer the cycle is in pausing, the higher…
Q: a) Balance this operation using the shortest operation time rule and compute the efficiency of the…
A: Activity Immediate Predecessors Duration K3 - 60 K4 K3 24 K9 K3 27…
Q: It is election day and 1800 voters vote in their precinct’s library during the 10 hours thepolls are…
A: Inventory or stock is the products and materials that a business holds for a definitive objective of…
Q: Fritz makes custom chocolate portraits of dogs and sells them online. He is trying to figure out how…
A: The total revenue earned from selling a good or service equals its price multiplied by its quantity…
Q: Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken,…
A: Following formula can be used to calculate implied utilization rate: Firstly, the workload needs to…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 16.65…
A: Given, Flow time in minutes = 16.65 hours * 60 minutes = 999 minutes Value added time = 1 minute +…
Q: Students are going through a three-step process to obtain their ID cards. Each student will first…
A: To be calculated: Time is taken to process 10 students Given values: A 3-step process Process 1 -…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: Cans are made in a process with two resources. The first resource has a capacity of 11 cans per…
A: Given: 1st resource capacity =11 cans/sec2nd resource capacity =10 cans/sec 1st resource has workers…
Q: A process consists of 3 resources. Assume there exists unlimited demand for product, Resource 1 has…
A: Given- Processing time of Resource 1 = 6 minutes per unitProcessing time of Resource 2 = 4 minutes…
Q: a process consisting of three resources. Assume there exists unlimited demand for the product, and…
A: since we only answer up to 3 subparts, we'll answer the first 3. please resubmit the question and…
Q: Mack’s guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically,…
A: Multifactor productivity (MFP), otherwise called complete factor productivity (TFP), is a proportion…
Q: Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to…
A: Tenants request residences for periods ranging from one month to a year, and in some cases even…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 30 loans…
A: Given, First resource capacity = 30 loans / hour Second resource capacity = 38 loans / hour Demand =…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 0.38…
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: The Stylish Hair Salon has three stylists who provideservices to women. After checking in with the…
A: Given Check-in time - 1 minute Customer’s washing, drying, and styling - 25 minutes Payment - 3…
Q: In a company that processes insurance claims, the average flow rate is 10 claims per hour and the…
A: a) Average claims in the system = T * R = 6 *…
Q: Loans are evaluated in a process with two sequential resources. The capacities of the resources are…
A: Given, Loans are utilized in a process with two sequential resources with, Capacity C1 =0.16 loans…
Q: 30,000-seat college football stadium is used 18 times for games, concerts, and graduation…
A: It is given that the stadium has been used 18 times. So, the Resource used = 18 times
Q: . In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Answer: Bike frame has a flow time about 11.5 hours. According to the data provided in the problem ,…
Q: Round "Utilization" to a whole percent, and "Cycle Time" to 1 decimal. What is the capacity of the…
A: Here, we have the following data, each nurse would take 1.25 hours to complete the visit of one…
Q: Does increasing the capacity of a resource ever increase the arrival rate to the resource group that…
A: Increasing the ability of resources often improves the flow of the operation. By increasing power,…
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: We have joined after 4 customers, hence there are a total of 5 customers in the system now
Q: There are three sequential operations (Station 1, Satiation 2, and Station 3) in a process. Incoming…
A: Theoretical flow time indicating the time required to complete a single task. Here, we can calculate…
Q: A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product…
A: Given- A work system has five stages - Processing times for stages are 6, 4, 2, 8, and 10 mins/unit
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: e Stylish Hair Salon has three stylists that provide services to women. After checking in with…
A: Bottleneck is the congestion point in a production process that occurs when the workloads arrive…
Q: The Stylish Hair Salon has three stylists who provide services to women. After checking in with the…
A: We have, Processing time per customer for receptionist = 1 +3 = 4 minutes per customer Processing…
Q: What is the bottleneck cycle time of this process (seconds/customer)? What is the raw processing…
A: Given data is Station 1 cycle time = 38 seconds Station 2 cycle time = 44 seconds Station 3 cycle…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 14.35…
A:
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
Q: her line can produce a unit in 10 minutes. The bottleneck is station (just fill in a number in this…
A:
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Process cycle time indicating the average time required to complete a unit of item. Here, we can…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 21…
A: Given: Process Demand = 16 application/hourThe capacity of 1st resource = 21 Applications/hour The…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Problem 3: What is the takt time for a production system thatoperates one shift given the following information?total time per shift = 480 minutesCoffee breaks = 2 20 - minute breaks per shiftLunch break = 60 minutesdaily demand = 360 unitsA.J.’s Wildlife Emporium manufactures two unique birdfeed-ers (Deluxe and Super Duper) that are manufactured andassembled in up to three different workstations (X, Y, Z) us-ing a small batch process. Each of the products is producedaccording to the flowchart in Figure 5.14. Additionally, theflowchart indicates each product’s price, weekly demand,and processing times per unit. Batch setup times are neg-ligible. A.J. can make and sell up to the limit of its weeklydemand and there are no penalties for not being able to meetall of the demand. Each workstation is staffed by a workerwho is dedicated to work on that workstation alone and ispaid $16 per hour. The plant operates 40 hours per week,with no overtime. Overhead costs are $2,000 per week. Basedon the information provided, as well as the information con-tained in the flowchart, answer the following questions.a. Using the traditional method, which bases decisionssolely on a product’s contribution to profits and over-head, what is the…A.J.’s Wildlife Emporium manufactures two unique birdfeed-ers (Deluxe and Super Duper) that are manufactured andassembled in up to three different workstations (X, Y, Z) us-ing a small batch process. Each of the products is producedaccording to the flowchart in Figure 5.14. Additionally, theflowchart indicates each product’s price, weekly demand,and processing times per unit. Batch setup times are neg-ligible. A.J. can make and sell up to the limit of its weeklydemand and there are no penalties for not being able to meetall of the demand. Each workstation is staffed by a workerwho is dedicated to work on that workstation alone and ispaid $16 per hour. The plant operates 40 hours per week,with no overtime. Overhead costs are $2,000 per week. Basedon the information provided, as well as the information con-tained in the flowchart, answer the following questions. a. Using the traditional method, which bases decisionssolely on a product’s contribution to profits and over-head, what is the…
- Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples per minute. The capacity of the second resource is 4.4 apples per minute. Demand for this process is 1.6 apples per minute. What is the cycle process in seconds?A copy center in an office building prepares bound reports for two clients. The center makes multiple copies (thelot size) of each report. The processing time to run, collate, and bind each copy depends on, among other fac-tors, the number of pages. The center operates 250 days per year, with one 8-hour shift. Management believesthat a capacity cushion of 15 percent (beyond the allowance built into time standards) is best. It currently hasthree copy machines. Based on the following table of information, determine how many machines are neededat the copy center Item Client X Client YAnnual demand forecast (copies) 2,000 6,000Standard processing time (hour/copy) 0.5 0.7Average lot size (copies per report) 20 30Standard setup time (hours) 0.25 0.40A copy center in an office building prepares bound reports for two clients. The center makes multiple copies (the lot size) of each report. The processing time to run, collate, and bind each copy depends on, among other factors, the number of pages. The center operates 250 days per year, with one 8-hour shift. Management believes that a capacity cushion of 15 percent (beyond the allowance built into time standards) is best. It currently has three copy machines. Based on the following table of information, determine how many machines are needed at the copy center. Item Client X Client Y Annual demand forecast (copies) 2,000 6,000 Standard processing time (hour/copy) 0.5 0.7 Average lot size (copies per report) 20 30 Standard setup time (hours) 0.25 0.40
- First question in the image Question N0 2: A production line has an hourly throughput rate 6 products per hour. The average throughput time of the line is 7 hours, calculate the average work-in-process inventory. Can u please answer both of the questionsGiven the following information, compute the takt time: Total time per shift is 480 minutesper day, and there are two shifts per day. There are two 20-minute rest breaks and a 30-minuteexcel lunch break per shift. Daily demand is 80 units.XYZ makes two types of products using 4 machines for 8 hours each day. Product A visits machines 1, 2 and 4. Product B visits machines 1 and 3. The capacity is 0.6 unit per minute at machine 1. 0.12 unit per minute at machine 2. 0.2 unit per minute at machine 3, and 0.5 unit per minute at machine 4. The demand per dav is 40 units for product A and 160 units per day for product B. Determine the implied utilization (IU) of all resources. What is the bottleneck ? Why ?. Show all formulas used, calculations and results.
- Up, Up, and Away is a producer of kites and wind socks.Relevant data on a bottleneck operation in the shop for theupcoming fiscal year are given in the following table:Item Kites Wind SocksDemand forecast 30,000 units/year 12,000 units/yearLot size 20 units 70 unitsStandard processing time 0.3 hour/unit 1.0 hour/unitStandard setup time 3.0 hours/lot 4.0 hours/lotThe shop works two shifts per day, 8 hours per shift, 200 daysper year. Currently, the company operates four machines,and desires a 25 percent capacity cushion. How many ma-chines should be purchased to meet the upcoming year’s de-mand without resorting to any short-term capacity solutions?2-The process of making hotdogs involves six activities: “grind”, “mix”, “stuff”, “cook”, “peel”, and “inspect”. If the capacity of activity “cook” determines the process capacity, which of the following statements are true? a- Activity “cook” is a bottleneck activity. b- The activity time of all the other five activities is shorter than activity "cook". c- Cycle time of the process of making hotdogs is equal=1/capacity of activity “cook”. d- Increasing the capacity of activity “grind” can increase the capacity of the process of making hotdogs. All statements are correct Only statement 'b' is correct Only statements 'a' and 'b' are correct Only statements 'a', 'b' and 'c' are correct Only statement 'a' is correct Only statement 'd' is correctCompute the takt time for a system where the total time per shift is 420 minutes, there is one shift, and workers are given 3 11-minute breaks and 40 minutes for lunch. Daily demand is 347 units.