Q.4 (i) Find the time required for taking a complete cut on a plate 600 × 900 mm², if the .cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm for the shaper. The clearance at each end is 75 mm. (ii) A hole of 30 mm diameter and 75 mm depth is to be drilled. The feed is 1.3 mm/rev and the cutting speed is 62 m/min. Assuming tool approach and tool over travel as 6 mm. Calculate : (a) Cutting time and (b) Material removal rate

Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Chapter3: Job Planning, Benchwork, And Layout
Section3.4: Saws And Cutoff Machines
Problem 2RQ: The vertical band saw is particularly useful, as it can be used to make straight cuts as well as...
icon
Related questions
Question
.cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm
Q.4 (i)
Find the time required for taking a cemplete cut on a plate 600 × 900 mm", if the
cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm
for the shaper. The clearance at each end is 75 mm.
(11) A hole of 30 mm diameter and 75 mm depth is to be drilled. The feed is 1.3
mm/rev and the cutting speed is 62 m/min. Assuming tool approach and tool over
travel as 6 mm. Calculate :
(a) Cutting time and
(b) Material removal rate
Q.5 Write short note on the following -
(i) Up milling and down milling processes
(ii) Balancing of grinding wheels
(iii) Gear hobbing
ittp3.7 w w w.ItuommC.com
Transcribed Image Text:.cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm Q.4 (i) Find the time required for taking a cemplete cut on a plate 600 × 900 mm", if the cutting speed is 9m/min. The return time to cutting time is 1:4 and the feed is 3mm for the shaper. The clearance at each end is 75 mm. (11) A hole of 30 mm diameter and 75 mm depth is to be drilled. The feed is 1.3 mm/rev and the cutting speed is 62 m/min. Assuming tool approach and tool over travel as 6 mm. Calculate : (a) Cutting time and (b) Material removal rate Q.5 Write short note on the following - (i) Up milling and down milling processes (ii) Balancing of grinding wheels (iii) Gear hobbing ittp3.7 w w w.ItuommC.com
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Machining Processes and Machine Tools
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Precision Machining Technology (MindTap Course Li…
Precision Machining Technology (MindTap Course Li…
Mechanical Engineering
ISBN:
9781285444543
Author:
Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:
Cengage Learning