QI- An embankment is to be constructed over a layer of soft clay 16 m thick as shown in figure 1. Construction the embankment will increase the total vertical stress in the clay layer by 110 kPa. The design requirement is that all but 25 mm of the settlement due to consolidation of the clay layer will have taken place after 6 months. Determine: A. The spacing in best pattern of 500 mm diameter sand drains to achieve the above requirement. B. Which is the best, the use of sand drains or pre-fabricated drains? Why? (25%) Embankment Clay Cy = 4.7 m?/ year Ch 7.9 m2/ year my= 0.25 m2/ MN 16 m Sand Figure (1).

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter3: Weight–volume Relationships
Section: Chapter Questions
Problem 3.24P
icon
Related questions
icon
Concept explainers
Question
Ql- An embankment is to be constructed over a layer of soft clay 16 m thick as
shown in figure 1. Construction the embankment will increase the total
vertical stress in the clay layer by 110 kPa. The design requirement is that all
but 25 mm of the settlement due to consolidation of the clay layer will have
taken place after 6 months. Determine:
A. The spacing in best pattern of 500 mm diameter sand drains to achieve the
above requirement.
B. Which is the best, the use of sand drains or pre-fabricated drains? Why?
(25%)
Embankment
Clay
Cy = 4.7 m2/ year
Ch = 7.9 m2/ year
mv= 0.25 m2/ MN
16 m
Sand
Figure (1).
Transcribed Image Text:Ql- An embankment is to be constructed over a layer of soft clay 16 m thick as shown in figure 1. Construction the embankment will increase the total vertical stress in the clay layer by 110 kPa. The design requirement is that all but 25 mm of the settlement due to consolidation of the clay layer will have taken place after 6 months. Determine: A. The spacing in best pattern of 500 mm diameter sand drains to achieve the above requirement. B. Which is the best, the use of sand drains or pre-fabricated drains? Why? (25%) Embankment Clay Cy = 4.7 m2/ year Ch = 7.9 m2/ year mv= 0.25 m2/ MN 16 m Sand Figure (1).
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Sediment transport
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning