The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by AD=2.690 mm the engineer then came up with an idea of applying a force P at joints C and D as shown to close the Gap. C' 3 m E 3 m- 3 m- 3 m- Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm? while AC and DF being 6363.961 mm². a) Determine the necessary force, P, to close the gap in kN. b) If force P will then be removed after being assembled, calculate the force in CD in kN. P.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite.
The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end
of construction, it was found that the last member, CD, was fabricated too short by AD=2.690 mm the
engineer then came up with an idea of applying a force P at joints C and D as shown to close the Gap.
P-
с с
C'
3 m
-3 m-
-3 m-
3 m-
Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being
6363.961 mm².
a) Determine the necessary force, P, to close the gap in kN.
b) If force P will then be removed after being assembled, calculate the force in CD in kN.
P.
Transcribed Image Text:The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by AD=2.690 mm the engineer then came up with an idea of applying a force P at joints C and D as shown to close the Gap. P- с с C' 3 m -3 m- -3 m- 3 m- Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being 6363.961 mm². a) Determine the necessary force, P, to close the gap in kN. b) If force P will then be removed after being assembled, calculate the force in CD in kN. P.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Connections
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning