Grounding and Service Mast
Objectives:
•
To understand all theory reviewed and identify all parts associated with a 200 Amp overhead
service. To describe the procedures used to install an underground service as per diagram below.
Materials & Tools Required:
●
Meter Base
●
#3 AWG T-90 Conductor
●
Electrical Panel (Combination)
●
Knife
●
Hacksaw
●
Hex Keys
●
Band Saw
●
Screwdrivers (Various)
Page
2
of
3
Questions:
State the
CEC Rule
number if the code book is used.
1.
According to the CEC, can PVC pipe be used for an outdoor residential overhead service mast?
2.
The point of attachment of supply or consumer’s service conductors or cables shall be not less than
_______ across highways, streets, lanes, and alleys.
3.
How high must the consumer’s service head or
equivalent be installed above the support for
attachment of the overhead service conductors?
4.
The point of attachment of supply or consumer’s service conductors or cables shall not exceed
________ above grade or sidewalk.
5.
What is the minimum size grounding conductor to be installed for a 200 Amp residential service?
Diagram:
Complete the diagram below by labelling indicated parts.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
3. The three bus-bar conductors in an outdoor sub-station are supplied by units ofpost insulators. Each unit
consists of a stack of 3-pin insulators fixed one on the top of the other. The voltage across the lowest
insulator is 8-45 kV and that across the next is 7-25 kV. Find the bus-bar voltage of the station.
[38-8 kV]
arrow_forward
h.1. In an alternating-current system, the maximum size for a copper grounding electrode conductor isA. 250 kcmil.B. 3/0.C. 500 kcmil.D. 4/0.
h.2. The figure shows a fault condition in an ungrounded electrical system. Which of the following will occurbecause of the fault in this system?A. Only the overcurrent protector at Point A will trip open.B. The ground fault will heavily damage the service.C. Nothing will happen until a second ground fault occurs.D. The overcurrent protection will trip, shutting off all the line side power.
arrow_forward
write down the slection of wiring accessories used in electrical installation
arrow_forward
The term "____" is defined in NEC® Article 100 as "connected to establish electrical continuity and conductivity."
Select one:
A. BENDED (BENDING)
B. BONDED (BONDING)
C. SHUNTED (SHUNTING)
D. GROUNDED (GROUNDING)
arrow_forward
The three bus-bar conductors in an outdoor sub-station are supplied by units of post insulators. Each unit
consists of a stack of 3-pin insulators fixed one on the top of the other. The voltage across the lowest
insulator is 8-45 kV and that across the next is 7-25 kV. Find the bus-bar voltage of the station.
arrow_forward
a) Classify the four categories of 3 phase power system faults we experience in our electrical power industry. b) Explain the emergence of such power systems fault as required in (question 1a)? c) Point out each type of fault specified under (a). d) Produce the (1D) design of the three-phase star connected faults stated under(b)
arrow_forward
7.B. The size of a grounding electrode conductor for a service or separately derived system is generally basedon the size of the largestA. ungrounded supply conductor.B. equipment grounding conductor.C. grounded electrode.D. bonding jumper.7.C. Which of the following statements about bonding is true?A. The joint or termination must offer opposition in the circuit for effective electrical connections.B. Effective bonding keeps impedance high if a fault should occur.C. The entire electrical safety circuit is only as good as its strongest bonded link.D. Bonding connections must endure high levels of fault current until overcurrent protective devices can operate.
arrow_forward
1. _______ is not considered an effective ground-fault current path. a) Ground b) Equipment grounding conductors c) Equipment bonding jumpers d) Grounded conductors
2.Which of the following is not a conductor in the grounding and bonding scheme for an ungrounded system? a) Grounding electrode conductor for grounding equipment enclosures and conductive parts b) Equipment grounding conductor c) Bonding conductors or jumper d) System grounded conductor
arrow_forward
list the material required for overhead service connection
arrow_forward
Count the neutral conductor of a 4-wire, 3-phase, wye-connected circuit when the major portion of the load is
electric discharge lighting (fluorescent, mercury vapor, high-pressure sodium, etc.), data processing, and
other loads where the neutral conductor carries
a. grounding
b.
traveler
C.
d.
current.
third harmonic
unbalanced
conductors to overheat but often overlooked is the possibility of
arrow_forward
A power generation plant connected to bulk load of high voltage industries shown in
Figure Q3 has specifications given in Table Q3. Each equipment reactance is
expressed in per unit on a common base of 100 MVA.
a) Find the fault level for each bus bar in the generation plant.
GI
G2
TI
Figure Q3: Single line diagram of a power generation plant
Table Q3: Specifications of power system components
Power System
Component
Voltage Rating
X
MVA Rating
(kV)
(pu)
GI
50
33
0.2
G2
40
33
0.18
50
33/11
0.1
T2
40
33/11
0.1
arrow_forward
10. Main bonding jumpers are required to be made of _______ or other corrosion-resistant material.A. copperB. aluminumC. copper-clad aluminum
arrow_forward
pls help
arrow_forward
c.1. Which of the following is one of the three essential functions of an equipment grounding conductor?A. Provide an arc-fault current pathB. Establish groundingC. Establish bondingD. Ensure the system is groundedc.2. What's another name for the three-point method of Earth resistance testing?A. Fall-of-potentialB. Line surgeC. Spatial shieldingD. Leakage current
c.3. If the National Electrical Code provides a requirement to ground equipment, it generally implies thatthere will be a direct connection to the Earth of a connection through a/anA. grounding electrode conductor.B. equipment grounding conductor.C. equipotential bonding conductor.D. bonding conductor.
arrow_forward
A? Conductor is defined in NEC 240.2 as a conductor, other than a service conductor, having overcurrent protection ahead of its point of supply that exceeds the value permitted for similar conductors that are not taps.
A. Faulted b. Tap c. Magnetic d. Copper-like
arrow_forward
H2. A/An _______ is an insulating tube or sleeve that protects an electrical conductor where it passesthrough a hole.A. expansion fittingB. couplingC. gland nutD. bushing
H3. Conductors that are larger than AWG size 8 will come only as a/an _______ conductor.A. aluminumEnd of examB. coveredC. solidD. stranded
arrow_forward
Most residential general lighting circuits are wired with 14-AWG copper conductors and are protected by 15-amp circuit breakers. However, there are many electricians who install 12-AWG copper conductors and protect them with 20-amp circuit breakers. How will you know which conductor size and which circuit breaker size will be used for the general lighting branch circuits in the house you are wiring?
arrow_forward
20.a. What's the primary disadvantage of using copper conductors?A. DurabilityB. CostC. AvailabilityD. Weight20.b. The NEC requires that each service-disconnecting means be suitable forA. hazardous locations.B. disconnecting the meter.C. wet conditions.D. the prevailing conditions
20.c. As a general rule, each building or structure is limited to a single service. What's an automatic exceptionto this rule?A. A second service deemed suitable for useB. A second service having the proper markingsC. Emergency systems or fire pumpsD. Higher building occupancy
arrow_forward
Question A
arrow_forward
2.a. What's defined as an assembly consisting of a service raceway, guy wires or braces, service head, andany fittings necessary for the termination and support of overhead service conductors?A. Drip loopB. Service lateralC. Service dropD. Service mast
2.b. What's likely to happen when connected parallel conductors are different lengths?A. An NEC violationB. Misidentification of conductor cablesC. An uneven distribution of currentD. Conductor termination
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Related Questions
- 3. The three bus-bar conductors in an outdoor sub-station are supplied by units ofpost insulators. Each unit consists of a stack of 3-pin insulators fixed one on the top of the other. The voltage across the lowest insulator is 8-45 kV and that across the next is 7-25 kV. Find the bus-bar voltage of the station. [38-8 kV]arrow_forwardh.1. In an alternating-current system, the maximum size for a copper grounding electrode conductor isA. 250 kcmil.B. 3/0.C. 500 kcmil.D. 4/0. h.2. The figure shows a fault condition in an ungrounded electrical system. Which of the following will occurbecause of the fault in this system?A. Only the overcurrent protector at Point A will trip open.B. The ground fault will heavily damage the service.C. Nothing will happen until a second ground fault occurs.D. The overcurrent protection will trip, shutting off all the line side power.arrow_forwardwrite down the slection of wiring accessories used in electrical installationarrow_forward
- The term "____" is defined in NEC® Article 100 as "connected to establish electrical continuity and conductivity." Select one: A. BENDED (BENDING) B. BONDED (BONDING) C. SHUNTED (SHUNTING) D. GROUNDED (GROUNDING)arrow_forwardThe three bus-bar conductors in an outdoor sub-station are supplied by units of post insulators. Each unit consists of a stack of 3-pin insulators fixed one on the top of the other. The voltage across the lowest insulator is 8-45 kV and that across the next is 7-25 kV. Find the bus-bar voltage of the station.arrow_forwarda) Classify the four categories of 3 phase power system faults we experience in our electrical power industry. b) Explain the emergence of such power systems fault as required in (question 1a)? c) Point out each type of fault specified under (a). d) Produce the (1D) design of the three-phase star connected faults stated under(b)arrow_forward
- 7.B. The size of a grounding electrode conductor for a service or separately derived system is generally basedon the size of the largestA. ungrounded supply conductor.B. equipment grounding conductor.C. grounded electrode.D. bonding jumper.7.C. Which of the following statements about bonding is true?A. The joint or termination must offer opposition in the circuit for effective electrical connections.B. Effective bonding keeps impedance high if a fault should occur.C. The entire electrical safety circuit is only as good as its strongest bonded link.D. Bonding connections must endure high levels of fault current until overcurrent protective devices can operate.arrow_forward1. _______ is not considered an effective ground-fault current path. a) Ground b) Equipment grounding conductors c) Equipment bonding jumpers d) Grounded conductors 2.Which of the following is not a conductor in the grounding and bonding scheme for an ungrounded system? a) Grounding electrode conductor for grounding equipment enclosures and conductive parts b) Equipment grounding conductor c) Bonding conductors or jumper d) System grounded conductorarrow_forwardlist the material required for overhead service connectionarrow_forward
- Count the neutral conductor of a 4-wire, 3-phase, wye-connected circuit when the major portion of the load is electric discharge lighting (fluorescent, mercury vapor, high-pressure sodium, etc.), data processing, and other loads where the neutral conductor carries a. grounding b. traveler C. d. current. third harmonic unbalanced conductors to overheat but often overlooked is the possibility ofarrow_forwardA power generation plant connected to bulk load of high voltage industries shown in Figure Q3 has specifications given in Table Q3. Each equipment reactance is expressed in per unit on a common base of 100 MVA. a) Find the fault level for each bus bar in the generation plant. GI G2 TI Figure Q3: Single line diagram of a power generation plant Table Q3: Specifications of power system components Power System Component Voltage Rating X MVA Rating (kV) (pu) GI 50 33 0.2 G2 40 33 0.18 50 33/11 0.1 T2 40 33/11 0.1arrow_forward10. Main bonding jumpers are required to be made of _______ or other corrosion-resistant material.A. copperB. aluminumC. copper-clad aluminumarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT