EET-115 Lab 9 - Grounding & Service Mast

.pdf

School

Centennial College *

*We aren’t endorsed by this school

Course

115

Subject

Electrical Engineering

Date

Jan 9, 2024

Type

pdf

Pages

3

Uploaded by CorporalMeerkat3730

Page 1 of 3 Centennial College Electrical Engineering Technician / Technology EET-115 Installation Methods 1 Name: Student #: Section: Date: LAB #9 Grounding and Service Mast Objectives: To understand all theory reviewed and identify all parts associated with a 200 Amp overhead service. To describe the procedures used to install an underground service as per diagram below. Materials & Tools Required: Meter Base #3 AWG T-90 Conductor Electrical Panel (Combination) Knife Hacksaw Hex Keys Band Saw Screwdrivers (Various)
Page 2 of 3 Questions: State the CEC Rule number if the code book is used. 1. According to the CEC, can PVC pipe be used for an outdoor residential overhead service mast? 2. The point of attachment of supply or consumer’s service conductors or cables shall be not less than _______ across highways, streets, lanes, and alleys. 3. How high must the consumer’s service head or equivalent be installed above the support for attachment of the overhead service conductors? 4. The point of attachment of supply or consumer’s service conductors or cables shall not exceed ________ above grade or sidewalk. 5. What is the minimum size grounding conductor to be installed for a 200 Amp residential service? Diagram: Complete the diagram below by labelling indicated parts.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help