Activity List for the PORTA-VAC Proje Activity Description Immediate Predecessor A --- B --- C Prepare routing A D Build prototype A E A, B F C G D H B, E I H J F, G, I Porta-Vac Project Develop product design Plan market research Prepare marketing brochure Prepare cost estimate Do preliminary design testing Complete Market survey Prepare pricing and forecast report Prepare final report
ect Note: This 6 Instructions: 1. Draw the PERT Diagram on a separate sheet of paper based on this Activ 2 3 2. Check the next sheet ("Project Flow") for a solution and compare your wo 5 3 3. Continue to the "Project Flow" sheet for further instructions. 2 3 4 2 2 Estimated Completion Time (weeks)
is not the correct map… vity List. ork!
Format Example Slack 1 Z 3 3 4 3 6 6 C 9 10 3 13 0 A 6 0 6 D 11 0 6 6 7 5 12 Start 6 E 9 6 3 9 0 B 2 4 4 2 6 Note: Activity Times are listed on the Activity List. Step 1:: Insert the activity times under the activity names, "Actitivity Duration" as shown in the Form Step 2: Perform a forward pass -- computing the Earilest Start and Earliest Finish times. Insert thes Step 3: Perform a backward pass -- computing the Latest Finish and Latest Start times. Insert these Step 4 Calculated the slack time for each activity. Insert this in the YELLOW box. Step 5: Determine the Critical Path. Then, proceed to the next sheet to determine the RISK of the project. Porta-Vac Project Earliest Start Activity Name Earliest Finish Latest Start Activity Duration Latest Finish Instructions: (see class notes for more details)