Elmazi-Shkumbin-Week7-8A

.docx

School

New Jersey Institute Of Technology *

*We aren’t endorsed by this school

Course

492

Subject

Industrial Engineering

Date

Oct 30, 2023

Type

docx

Pages

2

Uploaded by shkoombean

Shkumbin Elmazi Professor Tchouassi IE 492 10/13/23 8A Assigned Questions-Schaums Chapters FE Problems Team 4 #16 16) A company is considering two alternatives for manufacturing a certain part. Method R will have a first cost of $40,000, an annual operating cost of $25,000, and a $10,000 salvage value after its five year life. Method S will have an initial cost of $100,000, an annual operating cost of $15,000, and a $12,000 salvage value after its 10 year life. At an interest rate of 12% per year, the present worth values of the two alternatives are closest to: a. $124,446/$180,889 b. $195,057/$180,889 c. $124,446/$147,263 d. $195,057/$147,263 Answer is D. $195,057/$147,263 Method R First Cost = $40,000 Annual Operating Cost = $25,000 Salvage Value = $10,000 Life, years = 5 Interest Rate = 12% Present Worth = -First Cost – Annual Operating Cost*(P/A, i, n) – (First Cost – Salvage Value) * (P/F, i, n) + Salvage Value*(P/F, i, n) Where: P/A = Uniform series present worth P/F = Single payment present worth i = interest rate n = life, years Present Worth = -$40,000 - $25,000 (P/A, 0.12, 10) – ($40,000 - $10,000)(P/F, 0.12, 5) + $10,000(P/F, 0.12,10) Present Worth = -$40,000 - $25,000(5.6502) -$30,000(0.5674) + $10,000(0.3220) Present Worth = -$40,000 - $141,255 - $17,022 + $3,220 Present Worth= -$195,057
Method S First Cost = $100,000 Annual Operating Cost = $15,000 Salvage Value = $12,000 Life, years = 10 Interest Rate = 12% Present Worth = -First Cost – Annual Operating Cost*(P/A, i, n) + Salvage Value*(P/F, i, n) Where: P/A = Uniform series present worth P/F = Single payment present worth i = interest rate n = life, years Present Worth = -$100,000 - $15,000 (P/A, 0.12, 10) + $12,000(P/F, 0.12,10) Present Worth = -$100,000 - $15,000(5.6502) + $12,000(0.3220) Present Worth = -$100,000 - $84,753 + $3,864 Present Worth= -$180,889
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help

Browse Popular Homework Q&A

Q: In a 430 page manuscript, there are 280 randomly distributed misprints.Use the poison approximation.…
Q: The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can…
Q: were shipped to
Q: For the initial post, choose the method you think is the best method to manage a database -- by…
Q: Situation: The Ipod Touch has been out for two years now and a lot of data has been collected.…
Q: Hơ many mismatches would you expect to find between this sequence and the reference sequence? I…
Q: Find the time it takes for $5,800 to double when invested at an annual interest rate of 8%,…
Q: QUESTION 5 Every PLC model offers some form of counter instruction. O True O False QUESTION 6 For…
Q: describe potential opportunities and threats in that manufacturer’s external environmen
Q: coefficient of the variable %Taking. And state the F statistic if we wanted to test the hypotheses…
Q: The voltage across a particular device varies with time and is given by     V = 6e-0.1t volts…
Q: 4.36 A three-phase transformer bank is formed by interconnecting three single-phase transformers.…
Q: Recently, researchers investigated the original study by Muzafer Sherif and colleagues that examined…
Q: Find f'(x) for the following function. Then find f'(5), f'(0), and f'(-4). f(x) = -6x² - 11x
Q: The block is at rest as shown. What is the spring constant of the spring as shown, in N/m? Use g =…
Q: r = A www k r+l A 1-kg collar has a velocity of 9 m/s when to the right when it is at A. It then…
Q: a) b) 2x + Y = 7 + 4y = 5 2.x = 1 3y + 2z = 7 5y = 3 +y
Q: What is the principle of the SNP (single nucleotide polymorphisms) in the diagnosis of human…
Q: An Airbus A380-800 passanger airplane is cruising at constant altitude on a straight line with a…
Q: runtime complexity
Q: bution of the time required to get an oil change at a 15-minute oil-change facility is skewed right.…
Q: Water is poured into a tank at t = 0 minutes, but the tank springs a leak after 5 minutes and drains…