Assignment #3R

.docx

School

Durham College *

*We aren’t endorsed by this school

Course

CCA 1585

Subject

Industrial Engineering

Date

Dec 6, 2023

Type

docx

Pages

7

Uploaded by CommodoreSnow10239

Report
CONS1020 Concrete Assignment #3 Name: Student No.: Rename this file as yournameassignmnet#3, prior to submission Example, Johndoeassignment#3 Instructions: 1. Download this file to your computer 2. Provide the information directly into this document using the supplied format and sheets. 3. Using the dropbox, attach this file and submit. 4. Include your name in the space above Do a take-off and price of line “F” of the Office and Warehouse drawings; 1. Using Line “F” only of the building. 2. Take-off and price the footings. 3. Take-off and price the foundation wall. 4. Add 10% waste on supply of concrete, rebar and foundation insulation. 5. Start by reviewing the drawings and making a list of the elements to be taken-off. Description Labour Material Equipment Footings-Supply & place 20mpa concrete $18.05/CM $164.25/CM $0.67/CM Footings Form & Strip $3.05/SFCA $0.50/SFCA Footings-Rebar $0.36/LB $0.34/LB x Walls/Piers-Supply & place 25mpa concrete $20.67/CM $187.55/CM $0.76/CM Walls/Piers-Form & Strip $3.85/SFCA $0.81/SFCA Walls/Piers-Rebar $0.25/LB $0.64/LB Install Anchor Bolts $5.55/EA 2” Rigid Foundation Insulation $0.46/SF $1.70/SF After completing the take-off & pricing, answer the following question. High rise building is supported on a reinforced “raft” concrete foundation. Calculate the cost per cubic metre to supply & place concrete using a concrete pump at a price of $295 per hour including an operator and a crew consisting of 5 labourers ($31/hr/each), a cement finisher ($39/hr), and a foreman ($40/hr). With this set up concrete is placed in 7 hours and the transportation and set up of the pump costs $290. The work consists of supplying and placing 112 cubic metres ($180/CM) of concrete into the footings. Calculate the unit rate for each of the labour, material and equipment per cubic metre, as well as a total cost per cubic metre. 1
Prjt: QS/QUANTITY SHEET Page: By: Element/Trade: of Date: Reference: No.: Other: Type: Checked: DIMENSIONS Description No. Length Width Height/Depth Conversion Quantity UO M FORWARD FROM PAGE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 PAGE TOTAL NOTES: Prjt: QS/QUANTITY SHEET Page: 2
By: Element/Trade: of Date: Reference: No.: Other: Type: Checked: DIMENSIONS Description No. Length Width Height/Depth Conversion Quantity UO M FORWARD FROM PAGE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 PAGE TOTAL NOTES: Prjt: QS/QUANTITY SHEET Page: 3
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help