HW1 452 1-7

.xlsx

School

University of North Carolina, Charlotte *

*We aren’t endorsed by this school

Course

MBAD-614

Subject

Industrial Engineering

Date

Jan 9, 2024

Type

xlsx

Pages

14

Uploaded by SuperExplorationPorcupine30

Report
1 a. If units in inventory with cost of $1,000 per unit are sold for $2,000 per unit, how fast does the company turn its inventory? Inventory Turn Over = COGS/Average Inventory Average Inventory= (beginning Inventory + Ending Inventory)/2 Beginning inventory wasn't provided, using $200000 as beginning Average Inventory: $ 200,000.00 COGS: $ 400,000.00 Inventory turnover: 2 b. The company uses a 25 percent per year cost of inventory. That is, for the hypothetical case that one unit of $1,000 would sit exactly one year in inventory, the company charges its operations division a $250 inventory cost. What---in absolute terms ($) ---is the per unit inventory cost for a product that costs $1,000? Per Unit Inventory Cost = (inventory Cost/ Number of units) Per unit InventoryCost: 0.25 2 The following figures are taken from the 2003 financial statements of McDonald’s and Wendy’s. Figures a McDonald's Wendy's Inventory 129.4 54.4 Revenue 17140.5 3148.9 COGS 11943.7 1634.6 Gross Profit 5196.8 1514.4 Average Inventory 64.7 27.2 Holding % 30% 30% a. In 2003, what were McDonald’s inventory turns? What were Wendy’s inventory turns? Inventory Turnover = COGS/Average Inventory McDonald's 184.601236476043 Wendy's 60.0955882352941 b. A manufacturing company producing medical devices reported $ year. At the end of the same year, the company had $20,000,000 w devices. Suppose it costs both McDonald’s and Wendy’s $3 (COGS) per their value meal offerings, each sold at t inventory for both companies is 30 percent a year. Approximately how much does McDonald’s save in in of Wendy’s? You may assume that inventory turns are independent o
Inventory Cost per Value meal = (Inventory/Inventory Turnover) X (Holding Rate) McDonald's: 0.210291115818381 Wendy's: 0.271567355928056 Wendy's - Mcdonald's 0.061276240109675 Mcdonald's save $0.06 per value of meal 3 a. If the batch size is 10 donuts per batch, what is the capacity per day for each type of donut? Capacity of the Machine = 1 dounut/2 minute 20+(10*2) = 8X60 40 n= 480 n= 12 X10 b. If the batch size is 20 donuts per batch, what is the capacity per day for each type of donut? 20+(20*2) = 8X60 60 = 480 n= 8 X20 C. What is the minimal batch size in order to satisfy demand for both types? 20+(2X)+20+(2y) 2X+2Y+40 < 6X80 2(X+Y) < 440 X+Y < 220 Demand for each batch is 80 donuts per day, so the Batch is passed since 220>160 d. If the setup time is 8 minutes for either type, and batch size is 20 donuts per batch, what is the capacity p n= 8+(20*2) = 8*60 48 = 480 n= 10 X20 Each donuts batch is 20, so times 10 is 200 4 A donut store is open 8 hours a day and sells two types of donuts – blueberry cake donut and chocolate donuts per day for EACH type. The store has only one machine which makes both types, and once it star either type. The production alternates between the two types, i.e., a batch of one type is followed by a b per batch for either type. Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 8 workers and station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple wo independently on his/her own chair. Assume inventory buffers are allowed between each station and e beginning of the day.
Station Staffing Stripping 3 2.5 Priming 2 1.5 Painting 2 1.75 Inspection 1 0.8 Total 8 6.55 a. What is the maximum number of chairs per hour that can be produced? Maximum per chair (station*worker)/Processing hours Stripping: 1.2 Priming: 1.33333333333333 Painting: 1.14285714285714 Inspection: 1.25 Because Painting is the one has the lowest Capacity, so the maximum will be 1.1429 chair per hour b. if there is no bottle nect, so everyone will work 6.55 hours to get one cheir done. Worker# 8 Total process hours: 6.55 Maximum Capacity: 1.22137404580153 The total will be 1.22 chair per hours beginning of the day. Processing Time (Hours per Chair Per Worker) Suppose now that each worker is trained to do all tasks and each worker works on a chair from start to fi Painting and Inspection. What is the maximum capacity of the process in c
Sales: $ 600,000.00 beginning Inventory: $ 200,000.00 Ending Inventory: $ 200,000.00 COGS: $ 400,000.00 Unite/Year: $250 Per unit Cost: $1,000 are in million dollars. $60,000,000 in sales over the last worth of inventory of ready-to-ship the same price of $4. Assume that the cost of nventory cost per value meal compared to that of the price
= 120 donuts = 160 Donuts per day for each type of donut? = 200 Dounts e frosted donut. On average the demand is 80 rts, it produces one donut every 2 minutes for batch of the other. The setup time is 20 minutes d 4 stations. Each chair starts at the Stripping orkers within a station, each worker works each station has inventory to work on at the
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help