AT4 Supervise

.xlsb

School

Royal Melbourne Institute of Technology *

*We aren’t endorsed by this school

Course

6434C

Subject

Information Systems

Date

Oct 30, 2023

Type

xlsb

Pages

5

Uploaded by LieutenantMorning11739

Report
Activties and Tasks Time (days) 28 days estimated 1. Site survery and assement 2. Permit and Regulatory Compliance 3. Temporary Facilities Setup 4. Utilities Installation 5. Safety Measures Implementation 6. Material Delivery and Handling 7. Equipment Setup and Maintenance Removal of hazardous materials 14 days estimated 1. Hazard Assessment and Identification 2. Regulatory Compliance Check 3. Safety Planning and Training 4. Containment and Isolation 5. Proper Removal and Disposal 6. Air Quality Monitoring 7. Documentation and Reporting Removal of existing services 21 days estimated 1. Service Identification and Marking 2. Isolation and Shutdown 3. Safety Precautions and PPE 4. dismantling and Disconnecting 5. Waste Disposal and Recycling 6. Verification of Service Removal 7. Documentation and Reporting Demolisation 50 days in total estimated Site preparations Utility disconnect Hazardius material survery Structural weakening Selective demolitions Machanical demolition debris removal Basement retention system 100 days estimated 1. inspect and clean gutter 2. check and repair foundation crack 3. test sump and backup system 4. inspect and clean drainage system 5. Check vapor barriors 6. Monitor Humdity levels 7. regular inspect waterproofing Excavations 56 days esitmated 1. Site survery and marking Site establishment and services provision from your previous plans
2. Obtain permits and approvals 3. Saftey training 4. call for utility locates 5. Excavation equipement selection 6. proper soil 7. Monitoring and inspections Columns 14 days estimated Design and engineering Materials selection construction and installations foundation prep quality control fireproofing Maintenance Basement Slabs 21 days estimated Site preparations Reinforcement installation formwork setup concrete pouring finishing and curing vapour barrier joint and crack management Tilt Panel 21 days estimated Site preparations formwork constructions Reinforcement installation Concrete Mixing and Pouring Panel Casting Panel Tilt-Up Panel Connection and Finishin Ground floor slab 14 days estimated 1. Site Preparation 2. Formwork Installation 3. Reinforcement Placement 4. Base Layer Compaction and Preparation 5. Concrete Pouring 6. Finishing and Smoothing 7. Expansion Joint Installation Internal wall framing 28 days estimated 1. Layout and Marking 2. Wall Plate Installation 3.Stud Placement 4. Header Installation 5.Blocking and Bridging 6. Nailing and Fastening 7. Check for Plumb, Level, and Square
Data rough in 25 days estimated 1. Cable Path Planning 2. Cable Installation 3. Outlet and Junction Box Installation 4. Rack and Cabinet Placement 5. Termination and Patch Panel Installation 6. Testing and Certification 7. Labeling and Documentation Doors and window 4 days estimated Measure Choose Suitable Materials Install Proper Framing Weatherproofing and Sealing Hang and Adjust Door Install Hardware and Locks Regular Maintenance and Repairs All services rough in 28 days estimated 1. Electrical Rough-In 2. Plumbing Rough-In 3. HVAC Rough-In 4. Fire Sprinkler System Rough-In 5. Structured Cabling Rough-In 6. Security System Rough-In 7. Gas Line Rough-In Plasterboards wall 28 days estimated Measurement and Planning Cutting and Fitting Securing to Studs Taping and Jointing Sanding and Smoothing Priming and Painting Installing Fixtures and Outlets Fixing carpentry 4 days estimated 1.Door and Window Installation 2. Skirting and Architrave Installation 3. Cabinetry Installation 4.Moulding Installation 5. Staircase Installation 6. Built-In Furniture Installation 7. Hardware Installation Tiling 3 days estimated Surface Preparation Choose Suitable Materials Weatherproofing and Sealing Install Proper Framing Hang and Adjust Doors Install Hardware and Locks
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help

Browse Popular Homework Q&A

Q: A 2017 study of over half a million eighth through 12th graders found that the number exhibiting…
Q: For each of the salts on the left, match the salts on the right that can be compared directly, usir…
Q: What is the solution to x2 + 4x > 12? x 2 –6 6 –2 < x < 6
Q: QUESTION 8 What is the product of the following reaction? a. O a b Oc Od b. OH Br C. PBr 3 Ether, 35…
Q: es, in percent, were as follows. 2.1 1.5 1.3 1.0 2.8 8.2 1.9 1.3 3.2 4.4 9.5 3.8 2.7 4.9 2.1 1.8…
Q: Compute the least-squares regression line for predicting math proficiency from reading proficiency.
Q: There is not sufficient evidence to support the claim that the standard deviation of pulse rates of…
Q: 28. The molecules mediating signal transduction on a B-cell following antigen binding to BCR are…
Q: Question 31 The E1 reaction shares which characteristics with the S1 reaction? OD) 09 OA) OE O B)…
Q: For the reaction: 2 NOCI(g) 2 NO(g) + Cl2(g), the rate constant values were determined at two…
Q: Given the standard enthalpy changes for the following two reactions: (1) 2C(s) + H₂(g) → C₂H₂ (9)…
Q: 12=2 7. Use source transformation to find the Norton equivalent circuit at terminals a and b in the…
Q: error that correspond to the given hypothesis. The percentage of adults who have a job is less than…
Q: Q1: A water tower is an elevated structure supporting a water tank constructed at a height…
Q: What is the final answer?
Q: 5. (a) Find a parameterization of the intersection of the cylinder 4x² +9y² = 36 and the plane z =…
Q: (3) WT7x34 a Q * PL 10x1 31/2 31/2 A WT7x34 is attached through a 10x1 Plate with six 7/8" bolts.…
Q: The combustion of 0.1556 g benzoic acid increases the temperature of a bomb calorimeter by 2.50°C.…
Q: If the speed of the skateboarder at point A is v= 1.2 m/s, what is her speed at point B? Assume that…
Q: For each system listed in the first column of the table below, decide (if possible) whether the…
Q: The following data lists the ages of a random selection of actresses when they won an award in the…
Q: Describe the electron configuration of an atom using principal energy level, sublevels, orbitals,…