Improving Project Performance through Earned Value Management: A Case Study Analysis of the Ariba Implementation at MED-
Lucas Rendon
QSO 420
A. Use of EVM statistics for identifying potential project performance deficiencies
B. Interpretation of EVM statistics for the project in the case study
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
What action should Jane take?
arrow_forward
How can this situation be prevented from occurring again?
arrow_forward
According to the Project Management Body of Knowledge (PMBOK), Project Quality includes the processes and activities that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken. Explain with a sketch the CONSTRAINT in PM necessary to achieve project quality.
arrow_forward
3. General Construction Company
General Construction Company has a contract to build three lower‐income apartment buildings for the city of Santa Fe, New Mexico. During the construction of the first building, the Project Manager formed an auditing team to audit the construction process for each building. He asked the team to develop a list of minimum requirements for the projects and use this as a baseline in the audit. While reviewing the contract documents, one of the audit team members found a discrepancy between the contract minimum requirements and the City’s minimum requirements. Based on his findings, he has told the project manager that he has decided to contact the city administrator and discuss the problem. Question: If you were the project manager, how would you handle this situation? How can a customer be assured of satisfactory project completion?
arrow_forward
Help me create a gantt chart base on the table on the photo. Put it in excel or google sheet
arrow_forward
Explain when you think a baseline should be updated and why.
arrow_forward
Stinnett Transmissions, Incorporated, has the following estimates for its new gear assembly project: Price $1,220 per unit; variable costs = $3.75 million; quantity = 90,000 units. Suppose the company believes all of its estimates are accurate only to within ±15 percent. What values should the company use for the four variables given here when it performs its best-case scenario analysis? What about the worst-case scenario?
Pls don't copy answer i give up vote
arrow_forward
Operations Management
arrow_forward
RESEARCH TOPICS1. The difference between project feasibility and project appraisal and their significance toproject sustainability2. The interplay between the project components (Cost, time, scope and quality) and thesignificance to project performance and sustainability3. Report writing process and utility of project report to project management
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe, Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe, Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON
Related Questions
- What action should Jane take?arrow_forwardHow can this situation be prevented from occurring again?arrow_forwardAccording to the Project Management Body of Knowledge (PMBOK), Project Quality includes the processes and activities that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken. Explain with a sketch the CONSTRAINT in PM necessary to achieve project quality.arrow_forward
- 3. General Construction Company General Construction Company has a contract to build three lower‐income apartment buildings for the city of Santa Fe, New Mexico. During the construction of the first building, the Project Manager formed an auditing team to audit the construction process for each building. He asked the team to develop a list of minimum requirements for the projects and use this as a baseline in the audit. While reviewing the contract documents, one of the audit team members found a discrepancy between the contract minimum requirements and the City’s minimum requirements. Based on his findings, he has told the project manager that he has decided to contact the city administrator and discuss the problem. Question: If you were the project manager, how would you handle this situation? How can a customer be assured of satisfactory project completion?arrow_forwardHelp me create a gantt chart base on the table on the photo. Put it in excel or google sheetarrow_forwardExplain when you think a baseline should be updated and why.arrow_forward
- Stinnett Transmissions, Incorporated, has the following estimates for its new gear assembly project: Price $1,220 per unit; variable costs = $3.75 million; quantity = 90,000 units. Suppose the company believes all of its estimates are accurate only to within ±15 percent. What values should the company use for the four variables given here when it performs its best-case scenario analysis? What about the worst-case scenario? Pls don't copy answer i give up votearrow_forwardOperations Managementarrow_forwardRESEARCH TOPICS1. The difference between project feasibility and project appraisal and their significance toproject sustainability2. The interplay between the project components (Cost, time, scope and quality) and thesignificance to project performance and sustainability3. Report writing process and utility of project report to project managementarrow_forward
- Integrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…arrow_forwardIntegrated Health was a large private, nonprofit health care system located in Tempe, Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both…arrow_forwardIntegrated Health was a large private, nonprofit health care system located in Tempe,Arizona. A year ago, the decision was made to implement a computerized medication administration record (MAR) at Integrated Health. During the first year, the MAR system would be implemented at Central Hospital of Tempe. After the “bugs” were worked out, the computerized MAR would be implemented system-wide. The MIS department at Central Hospital was designated as the initiator and direction setter for the project. Art Smith, the Chief Information Officer at Central Hospital assigned Kate Cohen, a programmer/analyst, as project leader. Kate had the responsibility for developing and implementing the MAR project at Central. Kate did the programming work for the MAR and assembled a team from Pharmacy Services, Nursing Services, and Internal Auditing. Members of the project team provided feedback on the software, made suggestions related to user training, and worked on an implementation schedule. Both team…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding BusinessManagementISBN:9781259929434Author:William NickelsPublisher:McGraw-Hill EducationManagement (14th Edition)ManagementISBN:9780134527604Author:Stephen P. Robbins, Mary A. CoulterPublisher:PEARSONSpreadsheet Modeling & Decision Analysis: A Pract...ManagementISBN:9781305947412Author:Cliff RagsdalePublisher:Cengage Learning
- Management Information Systems: Managing The Digi...ManagementISBN:9780135191798Author:Kenneth C. Laudon, Jane P. LaudonPublisher:PEARSONBusiness Essentials (12th Edition) (What's New in...ManagementISBN:9780134728391Author:Ronald J. Ebert, Ricky W. GriffinPublisher:PEARSONFundamentals of Management (10th Edition)ManagementISBN:9780134237473Author:Stephen P. Robbins, Mary A. Coulter, David A. De CenzoPublisher:PEARSON
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON