preview

Aslamzeb Nebosh IGC3 March Final Essay

Decent Essays

International General Candidate’s Observation
Certificates Sheet
(2011 Specifaction) IGC3-THE HEALTH AND SAFETY PRACTICAL APPLICATION sheet number _01 of _08_

Student Name Hazrat Ullah ___________ Student number 00262421 Place inspected KARKON CONSTRUCTION COMPANY Date of inspection 27/11/014
Observation
Hazards and consequences
Control Measures Immediate and longer terms action
Timescale
1-Workers carrying building rocks from dumping point to foundation basement (distance 30 mtr approx)
Manually.
Increasing risk of manual handling will lead to server back injury over a period of time. WRULD, fatigue.
Carry out manual handling …show more content…

Hazard of falling objects, dust
Possible risk of serious head injury to the people down below, spread of waste, respiratory problems
The workers are to be instructed to refrain from this unsafe act.
A suitable debris chute with large covered skip should be installed to safe disposal of rubbles from all the floors.
Safe disposal of all construction waste

Immediate

One week

Regular

9- Used wooden pieces with rusted nails littered at the work site. Risk of penetration of rusted nails leading piercing infected wound, other ill health effects of iron rust is tetanus.
Housekeeping staff to be instructed to carry out thorough cleaning of the worksite on a regular basis.
Provide separate waste skip for wooden debris and make waste disposal program
Effective supervision of housekeeping activities fixed routines to be promulgated.
Immediate

01 week

regular

INTERNATIONAL GENERAL Candidate Observation CERTIFICATE sheet (2011 specification) IGC3-THE HEALTH AND SEFETY PRACTICAL APPLICATION sheet number _04 of _08_

Student Name Hazrat Ullah ___________ Student number 00262421 Place inspected KARKON CONSTRUCTION COMPANY Date of

Get Access