A process has 10 resources and two types of flow units. How many columns will therebe in the demand matrix?a. 2b. 5c. 10d. 20
Q: Lulu’s Dancewear operates a garment manufacturing business that employs 35 operators who work 7…
A: The question is related to Production Management. In the given question there are 35 operators and…
Q: A process makes two products, A and B, and operates 5 days per week, 8 hoursper day. Demand for the…
A: The schedule of level production states the requirements of resources of production at different…
Q: What is the maximum utilization a resource can achieve?a. A value equal to the demandb. A value…
A: d. 1.00
Q: C be used for the sct of tools on a lathe The tools must be sharpened periodically. Data for each…
A: Below is the solution:-
Q: The Holt Million Corporation’s plant manufactures two different products: X and Y. The plant has…
A:
Q: You are choosing from between the following four processes, each with a different fixed cost, and…
A: Given, Process Fixed Variable A 20,000 15 B 10,000 12 C 5,000 10 D 8,000 9.3
Q: Use the following information to answer the next question. Quantity 100 pieces Cycle Time per Piece…
A: Determine the day when the job would be finished:
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: Students have to change buildings between classes, which often involves walks of5 minutes or more.…
A: The correct option is B: Non-value-added time The Non-value-added time refers to the time that does…
Q: The Company makes TSHIRTS at their facility in chicago and Minnesota. The process involves three…
A: Capacity utilization = (Available time hours / used time hours) x 100 %
Q: Committed resources are ............................... A. purchased precisely at the time the…
A: A resource that is formally designated to any job responsibilities they have within a project. the…
Q: Cara Ryder manages a ski school in a large resort and is try-ing to develop a schedule for…
A: a) The work schedule as per the given information is as follows:
Q: Consider the following batch flow process consisting of three process steps performed by three…
A: Flow rate = 24 parts per hour = 24/60 parts per minute = 0.40 parts per minute Capacity of step-2 =…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe,…
A: Given, A 1 - B 3 A C 2 B D 4 B E 1 C, D F 3 A G 2 F H 6 G I 2 E, H J 3 I
Q: When the units of demand are at its peak, the capacity will exceed the demand. * O False O True
A: Excess capacity is a situation where the demand for a product is less as compared to the amount of…
Q: For a given process, the raw processing time is 102 sec, the bottleneck cycle time is 20 sec/item,…
A: Given, Raw processing time = 102 seconds. Bottleneck cycle time= 20 seconds per items. Work in…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe,…
A: Given - Daily demand = 62 Time available for manufacturing the shoes = 400 min/day
Q: For a given process, the raw processing time is 102 sec, the bottleneck cycle time is 20 sec/item,…
A: The work-in-progress is those products that still want some work to make the finished products.
Q: Consider an outpatient surgery center that is located in a rectangular building that is 90 feet by…
A: Facility layout is the systematic organization of various production components for achieving…
Q: C&A uses two steps to make a toy. Step 1 takes 20 seconds. Step 2 takes 15 seconds. Each step is…
A: Explanation: Step 1 units per hour = (60*60)/20 = 180 units Step 2 units per hour = (60*60)/15 = 240…
Q: A processor makes two components, A and B, which are then packaged together as thei nal product…
A: Operation management in an organization aims at providing the highest efficiency possible. It…
Q: Motorking Corporation, a market leader in the production of specialized engine additives, is…
A: Marketing is the activity, set of institutions, and processes for creating, communicating,…
Q: It is election day and 1800 voters vote in their precinct’s library during the 10 hours thepolls are…
A: Inventory or stock is the products and materials that a business holds for a definitive objective of…
Q: First question in the image Question N0 2: A production line has an hourly throughput rate 6…
A: Given data - Task A Task B Processing time (Min) 9 12 No. of worker 1 1
Q: If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily…
A: Bottleneck cycle time is the longest time in the entire process. In the given question there are two…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 0.33 loans…
A: In the above question the following information is given: First resource capacity is 0.33. Second…
Q: Petroleum that is produced from crude oil in an oil refinery is an example of O a. Project O b.…
A: The answer is as follows:
Q: The Holt Million Corporation’s plant manufactures two different products: X and Y. The plant has…
A:
Q: A process has high fixed costs and low variable costs. It is currently capacityconstrained. Will the…
A: The business's capacity is the maximum amount of work a business can perform in a given time.…
Q: A process consists of 3 resources. Assume there exists unlimited demand for product, Resource 1 has…
A: Given- Processing time of Resource 1 = 6 minutes per unitProcessing time of Resource 2 = 4 minutes…
Q: Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to…
A: Tenants request residences for periods ranging from one month to a year, and in some cases even…
Q: Of the following process types, ________ has the lowest output variety, and the highest output…
A: The operations management process can be divided into four groups based on how they are performed.…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: A process has a yield of 50 percent. How many units are needed as inflow to create anoutflow of 40…
A: Answer - (c) - 80 Given that, Yield percent = 50% Outflow = 40 units per day
Q: Knot's Industries manufactures standard and super premium backyard swing sets. Currently it has four…
A: Operating days(N) = 300 days Hour(H) = 8 Capacity(C) = 25% Number of machine(M) = 4 Number of hour…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each…
A: The capacity of the process is determined by the capacity of the bottleneck worker. In this case,…
Q: "Ruby runs a machine design shop that has 4 stages of process in succession. Stage i is cutting that…
A: Given data:
Q: Applications are scanned in a process w capacity of the second resource is 0.17 a
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: a) The throughput time of the new work cell is minutes (enter your response as a whole number). b)…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: A process has six resources and three types of flow units. How many rows will there bein the demand…
A: As process has six resources and three types of flow units Demand matrix=63…
Q: The product–process matrix is a convenient way of characterizing the relationship between product…
A: It is a tool to analyze the fit between a chosen product positioning and fabricating measure. The…
Q: 1. In an assemble-to-order company, at which level should master scheduling take place? a. The end…
A: This question is related to the topic- Supply chain management and this topic fall under The…
Q: T F For a food-processing plant such as Kraft Foods,capacity refers to the number of…
A: Capacity can be defined as the capability or the ability of the system that produce the output in a…
Q: There are three sequential operations (Station 1, Satiation 2, and Station 3) in a process. Incoming…
A: Theoretical flow time indicating the time required to complete a single task. Here, we can calculate…
Q: In the first week in the game, you received the order from stallion apparel at the beginning of the…
A: Given Information: Total units to be produced- 800 Time taken to produce the units – 1280 minutes…
Q: Petroleum that is produced from crude oil in an oil refinery is an example of O a. Product layout O…
A: The answer is as below:
Q: The following diagram shows the flow process, raw material costs, and machine processing time for…
A: Consider the following data regarding the raw material cost, production time, and…
A process has 10 resources and two types of flow units. How many columns will there
be in the demand matrix?
a. 2
b. 5
c. 10
d. 20
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- A process has six resources and three types of flow units. How many rows will there bein the demand matrix?a. 2b. 3c. 6d. 18A. What is capacity? B. Why is process capacity a limiting factor in all business processes and systems? Which one isbetter: too much capacity or too little capacity? What would be the conclusi2-The process of making hotdogs involves six activities: “grind”, “mix”, “stuff”, “cook”, “peel”, and “inspect”. If the capacity of activity “cook” determines the process capacity, which of the following statements are true? a- Activity “cook” is a bottleneck activity. b- The activity time of all the other five activities is shorter than activity "cook". c- Cycle time of the process of making hotdogs is equal=1/capacity of activity “cook”. d- Increasing the capacity of activity “grind” can increase the capacity of the process of making hotdogs. All statements are correct Only statement 'b' is correct Only statements 'a' and 'b' are correct Only statements 'a', 'b' and 'c' are correct Only statement 'a' is correct Only statement 'd' is correct
- Please do not give solution in image formate thanku Some of your constraints have slack. What does that mean? Select one: A. Slack indicates how much one additional unit of the resource is worth. B. If more of the resource were available, then profit could increase. C. There is more of the resource than is needed for the best solution. D. Slack indicates the total number of hours.Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwindshoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoesrequires 10 separate tasks. There are 400 minutes available for manufacturing the shoes inthe plant each day. Daily demand is 60. The information for the tasks is as follows: Task Performance Time (In minutes) Task Must Follow This task A 1 ___ B 3 A C 2 B D 4 B E 1 C.D F 3 A G 2 F H 5 G I 1 E,H J 3/25 I 1. What is the theoretical minimum number of work stations required to satisfy this output rate? 2. Allocate the tasks to work stations taking into consideration the precedence requirements and usingthe LOT rule to break ties between feasible tasks.A process has a yield of 50 percent. How many units are needed as inflow to create anoutflow of 40 units per day?a. 10b. 20c. 80d. 90
- The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there is a sequence of assembly steps performed by five workers. Each worker does two tasks. Inventory buffers are allowed between workers. (a) What is the capacity and cycle time of this process? (b) What is the idle time of each worker if the process operates at full capacity? (c) Suppose two workers could be hired, F and G, and they take the same time to complete tasks as the current five workers. F and G can be assigned to work on the same pair of tasks as one of the current workers. For example, F could be assigned tasks T1 and T2 (just like worker A) while G is assigned T5 and T6 (just like worker C). They cannot be assigned tasks that are currently assigned to two workers. For example, F cannot be assigned to tasks T2 and T3 (because they are currently being done by workers A and B). What is the capacity of this process with workers F and G included?The current level of resources is or is not Sufficient to satisfy a demand of 8 orders per hour because the process capacity is greater or less than demand.A furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?
- A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product are: Task Time(secs) ImmediatePredecessor u 30 none v 30 u w 6 u x 12 w y 54 x z 30 v,y If the company wants the output rate to be equal to demand, what is the last task performed at the second workstation if tasks are assigned in order of the most following tasks?A shoe manufacturer that operates 8 hours a day (no break) has developed a new sneaker per an important client's request. However, the client does not want to proceed with an order if the manufacturer cannot reach at least 88% efficiency during production. If SAM (standard allowed minute) to complete 1 pair of shoes is 30 minutes, how many pairs of shoes must each employee at the factory produce in a day to meet this client's requirements? Round your answer to the nearest whole number, but do not round until your final answer. Group of answer choices 14 pairs 16 pairs 15 pairs 12 pairsThe Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? A. none of the options B. 485,000 C. 473,000 D. 479,000