Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Performance Time (mins) Task Predecessors A A B Fig. 2 D C, D F A 2 F H Е, Н a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in Fig. 3 c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above=% (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = minute(s) (enter your response as a whole number).

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 111P
icon
Related questions
Question

Can you assit me with this problem 9 by showing me the process step by step. Thank you kindly

Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for
$210, contains both gas- and liquid-filled compartments to provide more stability and better protection against
knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes
available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is
as follows:
Fig. 1
Performance
Task
Predecessors
Time (mins)
A
1
B
A
2
В
Fig. 2
D.
4
В
E
1
C. D
A
G
2
F
6
G
2
Е, Н
J
3
a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked
positioned weight" to workstations is shown in
Fig. 3
c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= % (enter your
response as a percentage rounded to one decimal place).
d) The idle time for the assembly line per cycle =
minute(s) (enter your response as a whole number).
Nex
Transcribed Image Text:Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows: Fig. 1 Performance Task Predecessors Time (mins) A 1 B A 2 В Fig. 2 D. 4 В E 1 C. D A G 2 F 6 G 2 Е, Н J 3 a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in Fig. 3 c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above= % (enter your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = minute(s) (enter your response as a whole number). Nex
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,