An embankment is to be constructed for a certain project, as such filling materials are required to be excavated from borrow pits. The moist unit weight of the undisturbed soil is 20 kN/m3 and its water content is 10%. In order to build a 5 m high embankment with top width 2 m and side slopes 1:1, estimate the quantity of earth

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter3: Weight–volume Relationships
Section: Chapter Questions
Problem 3.24P
icon
Related questions
Question
100%

An embankment is to be constructed for a certain project, as such filling materials are
required to be excavated from borrow pits. The moist unit weight of the undisturbed soil is 20
kN/m3 and its water content is 10%. In order to build a 5 m high embankment with top width
2 m and side slopes 1:1, estimate the quantity of earth required to be excavated per meter
length of embankment. The dry unit weight required in the embankment is 17 kN/m3 with a
moisture content of 12%. Assume the specific gravity of solids as 2.65.

 

Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning