Consider three different processors P1, P2, P3 executing the same set of instructions. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 runs at 2 GHz and has a CPI of 1.2. P3 has a 4 GHz clock rate and a CPI of 2.4. a. Which processor has the highest performance in terms of instructions per second? b. If each processor executes a program in 5 second, find the number of cycles and the number of instructions for each processor. c. We would like to reduce the execution time by 20%. This will, however, increase the CPI by 25%. What clock rate do we need to obtain this amount of time reduction?
Q: Given : Instruction Type 1, 2, and 3 on Machine M CPI, = 1: CPI2 = 2; CPI3 = 3 Answer with just a…
A: instruction type 1,2,3 on machine :-
Q: 6-Consider the following two processors. P1 has a clock rate of 8 GHz, average CPI of 0.9, and…
A: Solution:
Q: Assume a pipelined processor with five pipeline stages where each stage takes one clock cycle.…
A: Answer: I have given answer in the brief explanation.
Q: Consider a processor with a 3.4 GHz clock rate and a CPI of 2.2. If the processor execute a program…
A: Introduction
Q: Let's assume that there are three processors, Pa, Pb, and Pc, like below. You can assume 1-way…
A: Instructions per second (IPS) = Clock rate / CPI
Q: Consider a computer system with DMA support. The DMA module is transferring a 1-byte character in…
A: Processor speed = 4 MHz 1- byte character in one CPU cycle. 1% of CPU cycle are used for DMA.
Q: Consider computing the overall CPI for a machine Z for which the following performance measures were…
A: CPI (Cycles per instruction) is one dimension of output of processor in computer architecture. For…
Q: Consider computing the overall MIPS for a machine A for which the following performance measures…
A: So here question is given we have to calculate CPI and MIPS
Q: Using a typical benchmark program, the following machine characteristics result: Processor Clock…
A: a) MIPS rate can be computed as:
Q: We have the following statistics for two processors P1 and P2. The two processors have the same…
A: CPI is Clocks per instructions, It is the number of computer clock speed cycles that occur while a…
Q: A certain microprocessor requires either 2, 3, 4, 8, or 12 machine cycles to perform various…
A: Solution: To find the clock rate, first find the average number of machine cycle per instructions.…
Q: Consider a CPU with clock cycle of 10ns that executes program A in 100 clock cycles and access the…
A: Given Data : Cycle time = 10 ns Program A takes = 100 cycles Program A access memory = 50 times…
Q: 5. Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3…
A: Given:
Q: Consider four different processors P1, P2, P3, and P4 executing the same instruction set. P1 has a…
A: ANSWER:-
Q: Consider a system with only two types of instructions, A and B. Type A instructions each require 7…
A: Given: Type A instructions each require (CPIA ) = 7 clock cycles Type B instructions each require…
Q: Suppose a program takes 1 million instruction on a processor having frequency 2 MHz. 50 % of…
A: Lets see the solution.
Q: Consider a hypothetical machine with the following characteristics: a. instruction format ; (total…
A: part 1: As, IR contain both opcode and address First instruction is LDA 20 ; load A from memory…
Q: Consider a group of 5 benchmarks. With an old generation of CPU in the 90s, the execution times of…
A: Speed Up=n= execution time of B/ execution time of A n1=5/10=1/2 n2= 2/16=1/8 n3= 2/4 = 1/2 n4 =…
Q: Computer Engineering Lab Question 1: Consider following scenario for a program running on two…
A: Computer Engineering Lab Question 1: Consider following scenario for a program running on two…
Q: Given : Instruction Type 1, 2, and 3 on Machine M CPI, = 1: CPI2 = 2; CPI3 = 3 Answer with just a…
A: As per answering guidelines, solving first 3 sub question A. Average CPI = 0.31*1 + 0.29*2 + 0.4*3…
Q: 1- Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3…
A: Note: since your question contain multiple part but we can answer only one at a time due to our…
Q: The ISA of a processor has four classes of instructions: arithmetic, store, load and branch with CPI…
A: Complementary of 2: Half duplicate of value inside the registry R2 is collected throughout this…
Q: If we have an 8 bit microcontroller that has 4kB of instruction memory starting at address 0x0000,…
A: 8 bit Microcontroller means that the processor can process 8 bits i.e. 1 byte . Hence, it is byte…
Q: two different processors execute same instructions, Processor one has 4Ghz clock rate and 1.5 CPI,…
A: Performance of Processor = clock rate * CPI. Number of cycles = execution time*clock rate Number of…
Q: benchmark program is run on a 40 MHz processor. The executed program consists of 80000 instruction…
A: Total time = effective CPI * instruction Count * CPU clock cycle time Effective CPI = Fi*CPIi…
Q: Q1. Consider that the up system consists of two memory sections, the SRAM and the EPROM. The up…
A: Wait state is a delay encountered by a computer processor when accessing external memory or a…
Q: he time of Executing a program have one instruction in 4 stage pipelining is equal to ----- of the…
A: Answer to the given question: The time of Executing a program have one instruction in 4 stage…
Q: Suppose we have two implementations of the same instruction set architecture. Computer A has a clock…
A: Ans
Q: Consider a machine where total addressable physical memory size is 32 Kbytes. If we would like to…
A: given, physical mem size=32 p=8KB R=2KB
Q: Let us consider a memory that includes two instructions. First instruction is located at memors…
A: It can be approached as: The instruction consists of opcode and operands. Given the instruction…
Q: Assume a program requires the execution of 50 × 106 FP instructions, 110 × 106 INT instructions, 80…
A:
Q: a CPI of 1.5. If the processor executes a program in 10 seconds, what is the number of clock cycles…
A: Given- 2 GHz clock rate CPI =1.5 Program Execution time -10 s
Q: Q: For a basic computer that is currently running in its timing TO of execution for an instruction…
A: Answer: I have given answer in the brief explanation
Q: If a 4 GHz processor graduates an instruction every thrid cycle, how many instructions are there in…
A: Formula for number of instructions is CPU time * clock rate / CPI Given, execution time = 12 seconds…
Q: Assume a program requires the execution of 75 x106 FP instructions, 112 ×106 INT instructions, 88…
A: The Time taken for n number of instructions which are of normal type= n*CPI/(clock rate)
Q: How many instructions are executed per second by a machine which has a clock frequency of 40MHz and…
A: Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: Question 8: Consider a 5-stage instruction execution in which, Instruction fetch = ALU operation =…
A: *As per the company norms and guidelines we are providing one question answer only please repost…
Q: Suppose an instruction takes four cycles to execute in a nonpipelined CPU: one cycle to fetch the…
A: Explanation: It speeds up the execution because the four-stage pipelined processor can execute the…
Q: How to measure a computer performance ? 2. Suppose we have a program runs in 100 seconds on a…
A: Below is the answer to above question. I hope this will be helpful for you...
Q: Assume that every 18 months, the number of CPU cores available is doubled. How much extra off-chip…
A: We need to find the extra off-chip memory bandwidth required.
Q: Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 5.1…
A: According to the information given:- We have 3 different processors and follow the instruction.
Q: Question 1: Consider following scenario for a program running on two computers A and B. Computer A…
A: Actually, computer is an electronic device which takes input and gives output.
Q: Suppose a given processor has access to two levels of memory. Level 1 contains 1000 words and has an…
A: Solution is in Step 2.
Q: Consider two different implementations, M1 and M2, of the same instruction set. There are three…
A: The given data is following- Clock rate for M1 is 2.0 GHz which is equal to 2 × 10^9 Hz. 0 GHz = 2…
Q: For questions Q11 and Q12, consider a computer running a program that requires 400 s, with 220 s…
A: Dear Student, To solve this problem we just need to find the time required for executing the program…
Q: two different processors execute same instructions, Processor one has 4Ghz clock rate and 1.5 CPI,…
A:
Q: Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3GHz…
A: Given terms are clock rate and CPI of processors P1, P2 and P3 Processor P1 , clock rate = 3GHz ,…
Q: Consider computing the overall CPI for a machine Z for which the following performance measures were…
A: The clock rate of the CPU = 200mhz. Instruction Category Percentage of Occurrence No. of cycles…
Q: We have the following statistics for two processors P1 and P2. The two processors have the same…
A: Processor P1, Clock Rate=200MHz Instruction class CPI Frequency A 5 20% B 2 40% C 3 40%…
Q: Two similar processors A&B with F of 4 & 5 GHz and CPI of 0.2 & 0.3 respectively. Assume that the…
A: The frequency of the processor determines the number of clock cycles per second. It is generally…
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- Processor R is a 64-bit RISC processor with a 2 GHz clock rate. The average instruction requires one cycle to complete, assuming zero wait state memory accesses. Processor C is a CISC processor with a 1.8 GHz clock rate. The average simple instruction requires one cycle to complete, assuming zero wait state memory accesses. The average complex instruction requires two cycles to complete, assuming zero wait state memory accesses. Processor R can’t directly implement the complex processing instructions of Processor C. Executing an equivalent set of simple instructions requires an average of three cycles to complete, assuming zero wait state memory accesses. Program S contains nothing but simple instructions. Program C executes 70% simple instructions and 30% complex instructions. Which processor will execute program S more quickly? Which processor will execute program C more quickly? At what percentage of complex instructions will the performance of the two processors be equal?Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 has a 2.5 GHz clock rate and a CPI of 1.0. P3 has a 4.0 GHz clock rate and has a CPI of 2.2. Which processor has the highest performance expressed in instructions per second? If the processors each execute a program in 10 seconds, find the number of cycles and the number of instructions.Consider three different processors P1, P2, P3 executing the same set of instructions. P1has a 3 GHz clock rate and a CPI of 1.5. P2 runs at 2 GHz and has a CPI of 1.2. P3 has a 4GHz clock rate and a CPI of 2.4.a. Which processor has the highest performance in terms of instructions per second?b. If each processor executes a program in 5 second, find the number of cycles and thenumber of instructions for each processor.c. We would like to reduce the execution time by 20%. This will, however, increasethe CPI by 25%. What clock rate do we need to obtain this amount of timereduction?
- Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 has a 2.5 GHz clock rate and a CPI of 1.0. P3 has a 4.0 GHz clock rate and has a CPI of 2.2. a. Which processor has the highest performance expressed in instructions per second? b. If the processors each execute a program in 10 seconds, find the number of cycles and the number of instructions. c. We are trying to reduce the execution time by 30% but this leads to an increase of 20% in the CPI. What clock rate should we have to get this time reduction?Consider three different processors P1, P2, and P3 executing the same instructionset. P1 has a 3GHz clock rate and a CPI of 1.5. P2 has a 2.5GHz clock rate and a CPI of 1.0, P3has a 4GHz and a CPI of 2.5.a) Which processor has the highest performance expressed in instructions per second?b) If the processors each execute a program in 5 seconds, find the number of cycles and thenumber of instructions.c) We are trying to reduce the execution time by 20% but this leads to an increase of 15% inthe CPI. What clock rate should we have to get this time reduction?Q: Consider three different processors P1, P2, and P3 that support the same instruction set. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 has a 2.5 GHz clock rate and a CPI of 1.0. P3 has a 4.0 GHz clock rate and has a CPI of 2.2. (a) Which processor has the highest performance expressed in instructions per second? Show your calculations. (b) If the processors each execute a program in 10 seconds, find the number of cycles and the number of instructions for each processor. (c) We are trying to reduce the execution time by 30% (i.e., execution time is reduced from 10 seconds to 7 seconds). However, this leads to an increase of 20% in the CPI. For each processor, what clock rate should we have to get this time reduction? (Show the calculations you did to answer this question.)
- Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3.1 GHz clock rate and a CPI (cycles per instruction) of 1.6. P2 has a 2.4 GHz clock rate and a CPI of 1.2. P3 has a 4.0 GHz clock rate and has a CPI of 2.0 If you could answer these id appreciate that greatly. a.Which processor has the highest performance expressed in instructions per second? b.If the processors each execute a program in 10 seconds, find the number of cycles and the number of instructions. c.We are trying to reduce the execution time by 30% but this leads to an increase of 20% in the CPI. What clock rate should we have to get this time reduction?Consider two processors P1 and P2. P1 has a clock rate of 2 GHz, average CPI of 0.8, and requires the execution of 5.0 x 10^9 instructions for a given task. P2 has a clock rate of 3 GHz, an average CPI of 1.2, and requires the execution of 6.0 x 10^9 instructions for the same task. Does the processor with the highest clock rate have a better performance? Justify your answer.Suppose two CPU A and B have exactly the same circuits, but different clock frequencies. Answer the following questions: a) If the clock frequency of CPU A is 8MHz, how long is one clock cycle of CPU A? b) If the CPU A can execute 0.4 million instructions per second on average, how long is the average time to execute one instruction? c) What is the average number of clock cycle to execute one instruction for CPU A? d) The frequency of CPU B is 12MHz. What is the average number of instructions that can be executed per second?
- 5. Consider three different processors P1, P2, and P3 executing the sameinstruction set. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 has a 2.5 GHzclock rate and a CPI of 1.0. P3 has a 4.0 GHz clock rate and has a CPI of 2.2.Which processor has the highest performance expressed in instructions persecond?Please solve and show all work and steps. Consider three different processors P1, P2, and P3 executing the same instruction set. P1 has a 3 GHz clock rate and a CPI of 1.5. P2 has a 3 GHz clock rate and a CPI of 1.0. P3 has a 4.0 GHz clock rate and a CPI of 2.2. Which processor has the highest performance expressed in instructions per second? If the processors each execute a program in 15 seconds, find the number of cycles and the number of instructions?Suppose we had a processor design with 5 stages where each stage takes the following amount of time: IF: 400 ps ID: 200 ps EX: 300 ps MEM: 500 ps WB: 200 psQ1: If you choose a pipelined design, what is the CPI? Assume that we have enough instructions such that the brief ramp up period at the beginning and the ramp down period at the end with less than 100% utilization does not matter. Q2: If you choose a pipelined design, what is the average execution time per instruction in picoseconds?