Klassen Toy Company, Inc., assembles two parts(parts I and 2): Part I is first processed at workstation A for15 minutes per unit and then processed at workstation B for330 PART 2 DESIGNING OPERATIONS10 minutes per unit. Part 2 is simultaneously processed at workstationC for 20 minutes per unit. Workstations B and C feed theparts to an assembler at workstation D, where the two parts areassembled. The time at workstation Dis 15 minutes.a) What is the bottleneck of this process?b) What is the hourly capacity of the process?
Q: An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes…
A: Given - Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 -…
Q: Canine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in…
A: So, we have, Demand of product-A = 90 units per week Demand of product-B = 85 units per week Because…
Q: 3- A production process at Kenneth Day Manufacturing is shown in the following Figure The drilling…
A: Given- Sawing operation = 6 units/hrSanding operation = 6 units/hrDrilling operation = 2.4…
Q: Assembly Line Problem A shop works a 400-minute day. The manager of the shop wants an output of 200…
A: THE ANSWER IS AS BELOW:
Q: Management wants to design an assembly line that will turn out 800 videotapes per day. There will be…
A: Given Desired output is 800 videotapes per day. Number of working hours per day is 8 hours Solution…
Q: eanie realizes that she has another project that needs to be completed by Saturday and wonders if…
A: A Small Introduction about Crashing Model The CRASH model has been proposed by Medical Research…
Q: assembly line has three tasks with respective task times: 5 minutes 5 minutes 6 minutes cycle time…
A:
Q: The figure below details the process flow for two types of customers who enter Barbara's Boutique…
A: For customers of Type A, Capacity of T2 step=6012=6012=5 customers per hour Capacity of T3…
Q: What is the total load times distance (load X distance) for each chef with this kitchen…
A:
Q: The figure below details the process flow for two types of customers who enter Barbara's Boutique…
A: (a) The capacity of T3a, T-3b, and T3-c combination is (1/16 + 1/11 + 1/12) per minutes = 0.237 per…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for nmners. The Tailwind shoe,…
A: Activity Immediate Predecessors Duration A - 1 B A 3 C B 2 D B 4…
Q: sen's regular customers asked him to prepare an estimate for the restoration of a 1964 model 356SC…
A: Correct project network is
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Required cycle time = Available time / No. of units to produce =…
Q: Product A Step 1 Station W (10 min) Step 2 Station X (11 min) Step 3 Station Y (16 min) Product: A…
A: In the given diagram - Demand for product A = 95 Units/ week Demand for product B = 90 units / week
Q: 2. A Production line is to be designed to assemble a product. The assembly of this product requires…
A: Given, the assembly of the product requires three tasks with times as under, t1= 0.3 minutes t2 =…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: An existing facility is to be re-designed to produce electric ovens. The old machines in the…
A: d. Continuous: Through the deployment of a continuous improvement programme, waste motion, lost…
Q: [Project Management] Kymco, a motorbike manufacturer, has invested millions in establishing a plant…
A: Given data: Tasks and duration To list the paths and critical paths
Q: You were just hired as the head strength coach at a NAIA school. You are the first strength coach…
A: Management process in a business is implemented to reduce the time wasted on repetitive tasks. It is…
Q: This exercise only contains parts b, c, d, e, and f. b) Given the demand, the cycle time for the…
A:
Q: An assembly line must be designed to produce 50 packagesper hour. Th e following data in Table 10-17…
A: Note: As per the Bartleby guidelines, only the first three parts of the question have been answered.…
Q: From the standpoint of the scheduling process, how are resource limitations treated in an MRP…
A: In MRP applications, backward scheduling is used to coordinate resource activities. In Material…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using: Cycle time = Available time / Desired output
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given - A local toy manufacturer is using a production line that runs 8 hours per day and produces a…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: The answer is below:
Q: Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the…
A: Given information Task Time Immediate Predecessors A 12 B 15 A C 8 A D 5 B, C E 20…
Q: Most universities exhibit the following features: a. No layout b. Department wise configuration…
A: Most universities exhibit the feature Department wise configuration.
Q: Managers at the First Community Bank are attempting to shorten the time it takes customers with…
A: Bottlenecks are basically the obstacles which can lead to slowing down of the whole process. At the…
Q: snip
A: Make-to-stock would be expected to be less expensive to the customer.
Q: i) Dine in restaurants processes are organized around processes and therefore have a…
A: A process layout is a type of facility layout in which the floor plan is arranged with similar…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: The Porsche Shop, founded in 1985 by Dale Jensen, specializes in the restoration of vintage Porsche…
A: Given data: *As per guidelines first three parts are answerable in multipart questions,…
Q: Samsung has launched new models of Smart TVs in Indian markets. The process flow structure suited…
A: Manufacturing is dependent on the process flow structure. There are several process flow structures…
Q: A manufacturer needs to produce 300 coffee pots per 8 hour day. The discrete tasks required to…
A:
Q: The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new…
A: Total Production time per day=8 hour or 480 minutes Total demand per day=1440 cases
Q: A visa application process from a Tumaritis country can be described in the chart below. The head of…
A: a. The difference between bottleneck and constraints are: Sl. No. Bottlenecks Constraints 1…
Q: Klassen Toy Company, Ic., assembles two parts (parts 1 and 2): Part 1 is first processed at…
A: A bottleneck is a position of blockage in a manufacturing system (like an assembly line or a…
Q: c Golf Cart c golf cart Time on Hand 1 0 10
A: Given: Parts List for Electric Golf Cart Lead Time Quantity on Hand Electric golf cart 1 0…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: Explain the importance of PQRST Key in designing a warehouse, your answer should contain a proper…
A: To do facility planning in a warehouse there are five key input data required to understand that is…
Q: [Project Management] Kymco, a motorbike manufacturer, has invested millions in establishing a plant…
A: Given data: Tasks and duration To find the float time for the project schedule
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: Canine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in…
A: Available minutes per workstation per week = 40 hours × 60 minutes an hour = 2400 minutes The demand…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: The answer is as follows:
Q: Workstation W Workstation X Workstation Y , with a total load time of ____ minutes. (Enter your…
A: Demand for each product is given. Demand for product A = 80 Units/ week Demand for product B = 75…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of products and services for which the consumers are willing to pay…
Q: What feature of manufacturing planning and control systems operates under the premise that the…
A: The input/output control feature is considered as major feature in manufacturing planning and…
Q: If all direct materials are placed in process at the beginning of production, determine the direct…
A: Drawings Department Direct materials and conversion equivalent units of production for June.…
Klassen Toy Company, Inc., assembles two parts (parts I and 2): Part I is first processed at workstation A for 15 minutes per unit and then processed at workstation B for 330 PART 2 DESIGNING OPERATIONS 10 minutes per unit. Part 2 is simultaneously processed at workstation C for 20 minutes per unit. Workstations B and C feed the parts to an assembler at workstation D, where the two parts are assembled. The time at workstation Dis 15 minutes. a) What is the bottleneck of this process? b) What is the hourly capacity of the process? |
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Francis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TASK TIME (MINUTES) IMMEDIATE PREDECESSOR A 1 — B 2 — C 3 — D 1 A, B, C E 3 C F 2 E G 3 E What is the workstation cycle time required to produce 15 units per hour? Note: Round your answer to 1 decimal place. Balance the line to use the fewest possible workstations to meet the cycle time found in part (b). Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part (b)? Note: Round your answer to 1 decimal place.An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes available daily in the plant for the device, and the average demand is 80 units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table. Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 - B 1 - C 1 A, B D 3 C E 4 D F 2 E b) Given the demand, what is the cycle time for this operation? The cycle time for this operation is enter your response here minutes/unit (enter your response as a whole number). c) What is the theoretical minimum number of workstations? The theoretical minimum number of workstations is enter your response here stations (enter your response as a whole number and, if your unrounded answer includes decimal values,…Five Hong Kong tailors—Simon, Pat, Choon, Paul, and Wu—must complete alterations ona suit for the duke and a dress for the duchess as quickly as possible. On the dress, Choonmust first spend 45 minutes cutting the fabric, then Pat will spend 75 minutes sewing thebodice, Simon will need 30 minutes stitching the sleeves, Paul 2 hours lacing the hem, andfinally Wu will need 80 minutes for finishing touches. As far as the suit is concerned, Patbegins with shortening the sleeves, which requires 100 minutes. He is followed by Paul,who sews in the lining in 1.75 hours; Wu, who spends 90 minutes sewing on the buttons andnarrowing the lapels; and finally Choon, who presses and cleans the suit in 30 minutes.Determine precisely when each tailor should be performing each task in order to minimize the total time required to complete the dress and the suit. Assume that the tailorsstart working at 9 a.m. and take no breaks. Draw the Gantt chart indicating your solution.
- The desired daily output for an assembly line is 540 units. This assembly line will operate 720 minutes per day. The following table contains information on this product's task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 35 — B 25 A C 35 A D 55 B E 5 B F 15 C G 30 E-D H 5 F-G b. What is the workstation cycle time? c. Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. (Leave no cells blank - be certain to enter "0" wherever required.)A visa application process from a Tumaritis country can be described in the chart below. The head of visa administration notices that the visa processing process has gone wrong and decides to examine the whole process. a. Explain the difference between bottlenecks and constraintsb. Identify the bottleneck of this process and explain your answerc. Calculate the throughput time of the above process and explain how many files can be processed in 1 hour?d. Explain how to solve the problem in the above process.Print Item Equivalent Units of Production Data for the two departments of Kimble & Pierce Company for June of the current fiscal year are as follows: Drawing Department Winding Department Work in process, June 1 10,000 units, 38% completed 4,000 units, 35% completed Completed and transferred to next processing department during June 60,000 units 60,500 units Work in process, June 30 11,500 units, 70% completed 3,500 units, 60% completed Production begins in the Drawing Department and finishes in the Winding Department. a. If all direct materials are placed in process at the beginning of production, determine the direct materials and conversion equivalent units of production for June for the Drawing Department. If an amount is zero, enter in "0". Drawing Department Direct Materials and Conversion Equivalent Units of Production For June Whole Units Direct MaterialsEquivalent Units ConversionEquivalent Units Inventory in process, June 1 fill…
- Alocal toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performied. The daily demand is 150 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires taskA to be completed. To start task Cand task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed. Finally, task G can start only once taskFis completed.What is the minimum number of workstations needed?Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to working on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day or 40 hours/week. Which of the three workstations, W, X, or…Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Find the answers in the…
- Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: Task Performance Time (mins) Task Must Follow Task Listed Below A 8 − B 11 A C 10 A, B D 9 B, C E 8 C F 4 D, E A C F B E D In the diagram, there are 6 circles labeled using the letters from A to F. There are 8 of arrows, and each arrow connects one circle to another circle. The arrows are situated in the following manner: A to B, A to C, B to C, C to D, B to D, C to E, D to F, and E to F. Part 2 a) The theoretical minimum number of workstations=55 (round your response up to the…As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 230 units per 8-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.2 - b 0.6 a c 0.4 b d 0.7 - e 1.6 d f 1.8 c g 2 e, fManagers at the First Community Bank are attempting to shorten the time it takes customers with approvedloan applications to get their paperwork processed. The flowchart for this process, consisting of several differ-ent activities, each performed by a different bank employee, is shown in Figure 5.1. Approved loan applicationsfirst arrive at activity or Step 1, where they are checked for completeness and put in order. At Step 2, the loansare categorized into different classes according to the loan amount and whether they are being requested forpersonal or commercial reasons. While credit checking commences at Step 3, loan application data are enteredin parallel into the information system for record-keeping purposes at Step 4. Finally, all paperwork for setting upthe new loan is finished at Step 5. The time taken in minutes is given in parentheses.Which single step is the bottleneck, assuming that market demand for loan applications exceeds the ca-pacity of the process? The management…