Super Fun Industries manufactures four top-selling toys code named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 18 hours a day, 5 days a week, and 4 hours on Saturday. Processing Time Station 1 Processing Time Station 21 Processing Time Station 3 Processing Time Station 4 It A-148 6 min 3 min 5 min 2 min The new bottleneck is whole number.) B-356 6 min 4 min 6 min 0 min capable of producing all the toys demanded. How many additional units of C-843 could be produced? Under this condition, does the bottleneck change? If weekly demand for the four products are A-148-190 units, B-356-430 units, 8-457 290 units, and C-843 100 units, which station is the bottleneck, and is it capable of producing all the toys demanded? The bottleneck for Super Fun Industries is with a utilization of %. (Enter your response rounded to one decimal place.) B-457 0 min 5 min 3 min 11 min C-843 7 min 2 min 3 min 1 min and the number of additional units of C-843 that could be produced is units. (Enter your response rounded down to the nearest

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 111P
icon
Related questions
Question

Give typed explanation not a single word hand written otherwise leave it 

Super Fun Industries manufactures four top-selling toys code named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through
each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 18 hours a day, 5 days a week, and 4 hours on Saturday.
Processing Time Station 1
Processing Time Station 2
Processing Time Station 3
Processing Time Station 4
A-148
6 min
3 min
5 min
2 min
It
B-356
6 min
4 min
6 min
0 min
capable of producing all the toys demanded.
How many additional units of C-843 could be produced? Under this condition, does the bottleneck change?
The new bottleneck is
whole number.)
B-457
0 min.
5 min
3 min
11 min
If weekly demand for the four products are A-148=190 units, B-356-430 units, B-457=290 units, and C-843= 100 units, which station is the bottleneck, and is it capable of
producing all the toys demanded?
The bottleneck for Super Fun Industries is
with a utilization of %. (Enter your response rounded to one decimal place.)
C-843
7 min
2 min
3 min
1 min
and the number of additional units of C-843 that could be produced is units. (Enter your response rounded down to the nearest
Transcribed Image Text:Super Fun Industries manufactures four top-selling toys code named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 18 hours a day, 5 days a week, and 4 hours on Saturday. Processing Time Station 1 Processing Time Station 2 Processing Time Station 3 Processing Time Station 4 A-148 6 min 3 min 5 min 2 min It B-356 6 min 4 min 6 min 0 min capable of producing all the toys demanded. How many additional units of C-843 could be produced? Under this condition, does the bottleneck change? The new bottleneck is whole number.) B-457 0 min. 5 min 3 min 11 min If weekly demand for the four products are A-148=190 units, B-356-430 units, B-457=290 units, and C-843= 100 units, which station is the bottleneck, and is it capable of producing all the toys demanded? The bottleneck for Super Fun Industries is with a utilization of %. (Enter your response rounded to one decimal place.) C-843 7 min 2 min 3 min 1 min and the number of additional units of C-843 that could be produced is units. (Enter your response rounded down to the nearest
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 4 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,