Suppose your manager presents you with the following information about machines that could be used for a job, and wants your recommendation on which one to choose. The specification width is .48 mm. In this instance, you can narrow the set of choices, but you probably wouldn't make a recommendation without an additional piece of information. (Round your answers to 3 decimal places.) Cost per Standard Deviation Machine Unit ($) 21 (mm) .059 .060 .070 B 12 14 D 10 .062 Answer is complete but not entirely correct. Process Cp A 0.135 в 1.333 0.114 D 1.290
Q: An efficiency percentage of 100 in a line balancing means a line is perfectly balanced a. TRUE b…
A: For a given production line, assuming creation time is by and large equivalent to Takt time, the…
Q: b. Assuming that both systems are stable and operating 10 hours per day with one manpower getting a…
A: This question is related to the topic of production management and this topic falls under the…
Q: How are disturbances managed and what influence do they have on the machine's capacity to operate?
A: Disturbance is any situation other than the normal and standard operating conditions for any…
Q: S-N curves are used to describe the relation of applied stress vs. service life cycles True or…
A: A product life cycle is described from the time when a product was introduced in a market to the…
Q: s allocating an hour for center plays ensures quality outcomes from play? Why do u say so
A: Quality is an important component of any service. The details are discussed as follows-
Q: PS.55 Four Corners is an IBC company that sells delicious Navajo tacos in the Crossroads Food Court.…
A: Given, Option 1 : Fixed cost = $180 Variable cost = $0.24 Option 2 : Fixed cost = $365 Variable…
Q: Tomball Co. manufactures two chair models, Standard and Premium. Weekly demand is estimated to be…
A: d). If there is no limit for machine hours available per week, then chairs will be produced up to…
Q: Mazen and his team have been asked to make a decision on implementing a new technology that might…
A: Various external and random forces compel that the environment is most unpredictable.
Q: at .........., various tools to desribe business process, requirements, and interaction with the…
A: A system analyst is a person who studies the procedure and interprets it with the motive of…
Q: You have two machines under consideration for an improved automated wrapping process for Snickers…
A: The answer is machine D
Q: Currently, Rock View Restaurant has a single window with one person who takes the order, gather the…
A: given,
Q: What is the break-even quantity beyond which the first process is more attractive? The break-even…
A: Information given Process 1 Process 2 Fixed cost $340000 $100000 Variable cost $40 $70…
Q: Compare the following machines on the basis of their present worth. Use 12% per year. Machine A…
A: Present Worth Formula PW = Initial Cost - Annual Operating Cost*(PVAF,r,n) - Annual repair…
Q: A ride at an amusement park is an example of a service operation where there is direct contact…
A: In a park, a ride necessitates direct customer interaction but less discretion in terms of…
Q: A department could generate an additional $520,000 in billable revenue each year if they could lower…
A: No-show rate = 0.8 patients per day Average per day visits for a PT = 6.5 Working days = 210 Number…
Q: John, is the Customer Service Manager at WestComm Corporation. She is complaining about the delays…
A: Every business organization has an organizational chart that clearly demonstrates the distribution…
Q: Supervisor will not become highly knowledgeable about the functions under their department in…
A: Production facilities are the equipment or materials used to manufacture the products and services…
Q: What do you think are the limitations of the flow process chart? Then suggests ways to answer these…
A: Flowcharts have many limitations, that can be listed down as below:
Q: United Research Associates (URA) had received a contract to produce two units of a new cruise…
A: Given that: Time taken by the First unit = 4000 hours The cost incurred in making the first unit =…
Q: Use the virtual work method to determine the horizontal and vertical components of the deflection at…
A:
Q: e patient room with a mean of 7 minutes. Assume that these have an exponential processing time. a.…
A: First check in which mean of 5 mins second waiting room mean=3mins Final patient room mean=7mins
Q: Dingizwe Manufacturing Corporation has a flat-file processing system. The information processing…
A: DBMS Database Management system, is a software for considering the security measures in order to…
Q: A taxi charges P1.50 for the first 300 meters and P1 for every 200 meters thereafter. Any distance…
A: Hopefully all yours doubt will clear if you have left with any doubt please let me know in comment.…
Q: Consider a four-station line in which all stations consist of single machines. The designed…
A: The answer is as below:
Q: Please read this case and answer questions Case study: The Copy Center Holdup Catherine Blake, the…
A: Note: - Since we can answer only up to 3 questions we will answer questions a, b, and c for your…
Q: A car manufacturer has designed a “special edition” version of its popular two-doorcoupe. This…
A: A car manufacturer has designed a special edition version of its popular car. It has increased horse…
Q: Case Study Question: What is your opinion about Frank’s leadership?
A: Case Summary: In the described case scenario, individual T has worked for Company D for seven years.…
Q: rishab
A: Services are a kind of product that consists of intangible activities, advantages, or satisfactions…
Q: Mr. Aris Benn manages an assembly line that produces a piece of equipment that is used to clean…
A: Based on the above case I will explain the same by sample program. For that, consider the below…
Q: A startup company is considering making a part by injection molding. The part is moderately complex…
A: Given data : The volume of the part = 10 cubic meters Demand (Company needs to make) = 250,000…
Q: State whether the following statements are true or false. If the statement is false, write its…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: A process currently services an average of 42 customers per day. Observations in recent weeks show…
A: Given, The average demand is 42 customers per day. Utilization is 90%. Demand in 5 years is 60%.…
Q: a. How many units must the process start with in order to meet the required output of 7500 units in…
A: Operation is the process of performing the practical things related to any department or file.…
Q: A procedure at Mercy Hospital has fixed costs of $10,000 per year and variable costs of $50 per test.…
A: Given: Fixed cost = $10,000 per year Variable cost = $50 per test If the procedure is automated…
Q: hat is the MCE (Manufacturing Cycle Efficiency)? a.15 minutes b.20 minutes c.30 minutes d.5 minutes…
A: Manufacturing is a process of making goods, and the production of items or parts for use in trade.…
Q: An organization is considering three process configuration options. There are two different…
A:
Q: Terry's Dilemma Terry has worked for Dutchman Enterprises for seven years. Dutchman is a call center…
A: "Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: Edward is working in fortune 100 company and he is assigned a task to calculate the time efficiency…
A: Task Cycle time Processing time Register ministerial enquiry 2 days 30 min Investigate…
Q: A computer repair service has a design capacity of 80 repairs per day. Its effective capacity,…
A: Design capacity (DC) = 80 repairs per day Effective capacity (EC) = 64 repairs per day Output per…
Q: Spreadsheet Nighthawk Airlines measured their numbers of lost bags in one month and found that they…
A: Given data: Number of customers = 10,000 Number of lost bags = 40Average number of bags per…
Q: Which of the following is the correct value for the resulting line's efficiency?
A: THE ANSWER IS AS BELOW:
Q: Mr. Aris Benn manages an assembly line that produces a piece of equipment that is used to clean…
A: The data which Benn will need to adjust the sequential construction system are as per the following:…
Q: Bagot Copy Shop has a volume of 125,000 black-and-whitecopies per month. Two salespeople have made…
A: Formula:
Q: Recently, some operations management experts have begun insisting that simply maximizing process…
A: Operations management can be described as the area of business where the business operations are…
Q: An operations manager is deciding on the level of automation for a new process. The fixed cost for…
A: Alternative Fixed Cost Variable Costs per Unit A $100,000 $49 B $300,000 $36 C $500,000 $24…
Q: Carlos Gonzales is production manager at an assembly plantthat manufactures cordless telephones. Th…
A: Formula:
Q: The system efficiency is expressed as ratio of actual measured output to the design capacity Select…
A: Efficiency and utilization formulas are ; Efficiency = Actual output / Effective capacity…
Q: Dr. Gulakowicz is an orthodontist. She estimates that adding two new chairs will increase fixed…
A: Break even point can be calculated as Break even = (fixed cost)/(selling price - variable cost)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- Bagot Copy Shop has a volume of 125,000 black-and-whitecopies per month. Two salespeople have made presentationsto Gordon Bagot for machines of equal quality and reliability.The Print Shop 5 has a cost of $2,000 per month and a variablecost of $.03. The other machine (a Speed Copy 100 ) will costonly $1,500 per month, but the toner is more expensive, drivingthe cost per copy up to $.035. If cost and volume are the onlyconsiderations, which machine should Bagot purchase?What do you think should be the procedure of the extension worker in solvingt theproblems? What are the concerns covered by extension? If you were an extension worker, what will you use as your entry point? Why?Select the right answer. 1. The crossover point between two processes A and B can be stated as - [ ] a. variable costs of process A = Variable costs of process B - [ ] B. Fixed costs of process A = Fixed costs of process B - [ ] Variable costs of process A = Fixed costs of process B - [ ] total costs of process A = total costs of Process B 2. What are the two dimensions of the service process matrix - [ ] Degree of customization and degree of capital - [ ] Degree of customization and degree of labor - [ ] Degree of volume and degree of variety d - [ ] All of the above 3. Which of the following strategies could be used when demand exceeds the capacity. - [ ] Stimulate the market through price reductions or aggressive marketing - [ ] Product changes. - [ ] decreasing prices of products - [ ] Discouraging marginally profitable business 4. Capacity decision determines which of the following? a. whether demand will be satisfied or whether facilities will be…
- Dingizwe Manufacturing Corporation has a flat-file processing system. The information processing facility is very large. Different applications, such as order processing, production planning, inventory management, accounting systems, payroll, and marketing systems, use separate tape and disk files. The corporation has recently hired a consulting firm to investigate the possibility of switching to DBMS. REQUIRED: Prepare a memo to the top management team at Dingizwe explaining the advantages of a DBMS. Also, discuss the necessity of a database administrator and the job functions this person would performA process is designed to produce 2,050 units per hour. The process has a scrap rate of 0.9% and a 14% inherent inefficiency. Assuming that the actual output of the process is 1,550 units per hour, what is the process design capacity, available capacity, actual capacity, capacity utilization, efficiency and the output gap for this process? The design capacity is ____ units per hour. (Enter your response as a whole number.)Assume you are the project manager for the Tidal 2 software project. You have been asked to calculate the expected cost for the project. Your company’s database indicates that developers can handle eight function points each person-month and that the cost per developer at your firm is $6,000 per month. You and your team of five developers have come up with the following requirements: (Round your "Estimated duration" answer to 2 decimal places.) Elements Count Complexity Inputs 15 Low Outputs 9 Low Inquiries 9 High Files 33 Medium Interfaces 23 High Calculate the total number of function points and the estimated cost and duration of the Tidal project? (Use “complexity weighting”). estimated total number of function points estimated cost estimated duration months
- Tribal Systems, Inc., is opening a new plant and has yet todecide on the type of process to employ. A labor-intensiveprocess would cost $10,000 for tools and equipment and$14 for labor and materials per item produced. A more automated process costs $50,000 in plant and equipment buthas a labor/material cost of $8 per item produced. A fullyautomated process costs $300,000 for plant and equipmentand $2 per item produced. If process selection were basedsolely on lowest cost, for what range of production wouldeach process be chosen?Discuss the concept of sensitivity analysis in system modeling. Why is sensitivity analysis important, and how is it performed?For each of these cases, on photo prepare for building a model by reading the full case and answering the following questions. 1. Explore the mess by answering the following questions: (a) What do we know? (b) What can we assume? (c) What could the results look like? (d) What information can be brought to bear? (e) What can we ask the client? (f) Are there any similar situations or problems? 2. Formulate one or more problem statements
- A manager must decide which type of machine to buy, A, B, or C. Machine costs (per individual machine) are as follows: Machine Cost A $ 60,000 B $ 50,000 C $ 60,000 Product forecasts and processing times on the machines are as follows: PROCCESSING TIME PER UNIT (minutes) Product AnnualDemand A B C 1 16,000 3 4 4 2 10,000 6 5 1 3 15,000 1 3 6 4 17,000 5 3 4 Click here for the Excel Data File a. Assume that only purchasing costs are being considered. Compute the total processing time required for each machine type to meet demand, how many of each machine type would be needed, and the resulting total purchasing cost for each machine type. The machines will operate 10 hours a day, 240 days a year. (Enter total processing times as whole numbers. Round up machine quantities to the next higher whole number. Compute total purchasing costs using these rounded machine quantities. Enter the resulting total purchasing cost as a whole…System service When locating a retail outlet such as a supermarket, the objective is to ______________. Select one: a. Maximize profit b. Minimize cost c. Maximize revenue d. Maximize customer satisfaction e. Minimize fixed cost Customer expect _________ from any franchise outlet.Select one: a. high quality service b. low prices c. fast service d. identical service e. all Which of the following is not a characteristic of the co-creation of the dimension of the B2B service experience?Select one: a. The customer is a coproducer of the value b. The customer performs the service c. The customer is an input to the service process d. All e. None11. You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes, and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency? Multiple Choice 0.990 0.500 0.973 None of these choices are correct. 0.833