Sustainable Energy
2nd Edition
ISBN: 9781337551663
Author: DUNLAP, Richard A.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
error_outline
This textbook solution is under construction.
Students have asked these similar questions
A hydroelectric power station is supplied from a reservoir having an area of 50 km2and a head of 50 m.If overall efficiency of the plant is 60%, find the rate at which the water level will fall when the stationis generating 30,000 kW
2. Consider the system described in the news: at night, when there is energy left, water is pumped from a large lake to a reservoir at 80 m above the lake level. During the day, this water is used to generate energy in a turbine located 80 m below the elevated reservoir. Considering that the water flow is always 5000 liters/s (both at the inlet of the reservoir and at the outlet) and that the pump and turbine efficiencies are 70%, what is the power (in kW) required by the pump and the power (in kW) recovered in the turbine. Data: The pipe diameter is always the same along the system (d = 0.5 m); g = 10 m/s2; γ = 9810 N/m3.
Matter transport phenomena;
Please make it typeable as handwriting interferes with understanding
What is the cost to pump 1000 liters of water to the top of a 30 m high water tank? Assume a pumping efficiency of 50% and an electrical cost of $0.15 per KW-h. P(h2O) = 1000 ?g/m^3 . 1 m^3 = 1000 liters
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- A turbine is rated at 600hp when the flow of water through it is 82cu.m/sec. Assuming an efficiency of 92%, what is the head acting on the turbine?arrow_forwardA dam is shaped like a parabola (y = x^2) and has a height of 150 meters. The water's density is 1000kg/m3. Pt 1. FInd the total energy stored by this dam. Pt 2. If fourty-percent of the total energy from the dam was consumed, what would be the water level's new hight? Pt 3. If a city was using this dam for its energy and consumed 12 x 107 MW of power, how much time would it take for the level of the dam to drop down to the height in part 2?arrow_forwardThe flow of a river is 150 cubic feet per second at a site where a 75 feet hydrostatic head canbe created by the erection of a dam. What is the potential capacity (in kW) of a hydroelectricpower plant if installed at this site? Consider that hydraulic efficiency of energy conversioncan be 80%, and that the electric efficiency can be 90%.arrow_forward
- Design head at China’s Three Gorges Dam, the largest hydropower project in the world, is 80.6 m, and rated power output of each of the 32 turbine generator units is 700 MW. If the efficiency of each of the turbine generator units at full power output is 93.2%, what is the design flow through each turbine?arrow_forwardDiscuss the benefits of pumped storage hydropower (PSH).arrow_forwardWater leaving the nozzle at a velocity of 4350 m/min with a volume flow rate of 0.736 m³ . if the density of water is 0.000997 kg/cm³ . How will you determine the potential for power generation in a hydraulic turbine .arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you