Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board ass
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A: Equivalent units of products concept came in to existence when some units are not fully completed at…
Q: Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process…
A: Answer with calculations are as follows
Q: Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are produced in…
A: Activity cost allocated = Activity used*Activity rate Activity cost per unit = Total activity…
Q: 1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in…
A: Lead time: Lead time is the time consumed for the creation of a product. It refers to the time…
Q: XYZ Engine Corporation manufactures a single model of gasoline engine used in lawn mowers, portable…
A:
Q: Larsen, Inc., produces two types of electronic parts and has provided the following data:…
A: 1. Calculate the activity consumption ratios for each product.
Q: Arona Corporation manufactures canoes in two departments, Fabrication and Waterproofing. In the…
A: An equivalent unit of production is an expression of the work done by a manufacturer on partially…
Q: Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the…
A: Process costing is a method of costing direct cost are accumulated and indirect cost is allocated to…
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A:
Q: The following six situations at Diviney Manufacturing Inc. are independent.a. A manual insertion…
A: You have asked multiple questions which are completely different as each situation is different…
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A: Under the average method, it is assumed that the opening work-in process has been completed wholly…
Q: BETTERER Engine Corporation manufactures a single model of gasoline engine used in lawn mowers,…
A: Under the average method, the total cost incurred till date is divided by the total equivalent units…
Q: Montross Lumber processes wood to be shipped to construction companies. In order to keep its…
A: Inspection cost: The inspection cost is the cost incurred to examine the quality of the products.…
Q: Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process…
A: 1.
Q: onfer Company produces two different metal components used in medical equipment (Component X and…
A: Cost for Production- Cost for Production refers to entire expenses which are experienced within the…
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A:
Q: Poll Board Inc. manufactures several models of high-quality skateboards. The company's ABC system…
A: Activity based costing means where the product is valued on the basis of actual direct material ,…
Q: Vernon Inc. has analyzed the setup time on its computer-controlled lathe. The setup requireschanging…
A: Improving resource usage has numerous advantages for the organization and process.Shorter lead…
Q: Each x-pod sold yields a profit of $7; each BlueBerry produced may be sold for a $5 profit.…
A: let the number of a portable music be x and the number of an internet-connected color telephone be…
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A: Equivalent units of products concept came in to existence when some units are not fully completed at…
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: Working Note: 1:
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A:
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: Value-added lead time = PC board assembly + Final assembly + Testing + Packaging and labeling = 4 +…
Q: Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process…
A: working notes: waits time—PC board soldering (50 x 4 Min.) wait time—final assembly (50 x 20 min)…
Q: How many kanban card sets are required for this process?
A:
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A:
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A: Equivalent units of products concept came in to existence when some units are not fully completed at…
Q: At the High Quality GAYUMA Corp., operated by A.E. Cabug, the process begins with the blending of…
A:
Q: Lead timeSound Tek Inc. manufactures electronic stereo equipment. Themanufacturing process includes…
A: Value-added ratio is computed to find out the extent of value-added lead time in the total lead…
Q: The controller for Ocean Sailboats Incorporated, a company which uses an automated process to make…
A: Calculation of activity rates : Machine set-ups = Budgeted overhead cost Number of set-ups =…
Q: Sound Tek Inc. manufactures electronic stereo equipment testing, and shipping. In the PC board…
A: In the PC board assembly operation, assembling electronic components into printed circuit boards. As…
Q: ound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: working notes: wait time for PC board soldering (50 x 4 .)=200 wait time for final assembly (50 x…
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: 1 Formulas for the above table:
Q: Required: What is the cost per unit transferred to finished goods inventory for each of the three…
A: Process costing refers to the allocation of direct costs and indirect costs to a manufacturing…
Q: Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are produced in…
A: Activity based costing is a technique of assigning cost under which the activities involved in…
Q: Required: What is the cost per unit transferred to finished goods inventory for each of the three…
A: For Computing Cost of Production of the product, costs directly attributable, are directly charged…
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: ANswer - Working Note : a Value-added lead time Particulars Minutes PC board assembly…
Q: BETTERER Engine Corporation manufactures a single model of gasoline engine used in lawn mowers,…
A: Calculation of equivalent units using average method for casting department
Q: Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process…
A:
Q: Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the…
A: Formula used: Cost per unit = Total Cost incurred / Total Units produced
Q: Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process…
A: Answer 2) Business orientation includes: Production / Process Orientation Product Orientation…
Q: Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the…
A: Cost accounting means where every cost of doing business is recorded in necessary account and cost…
Q: Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed…
A: Please see the next step for the solution
Q: Brightmore Corporation manufactures three styles of lighting fixtures using five sequential…
A: The problem contains two subparts. We have to calculate the total cost of work completed and the…
Lead Time
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete.
The final assembly for each stereo unit requires 20 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The units wait while the setup is performed. In the final test, the 50-unit batch is tested one at a time. Each test requires 9 minutes. The completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 50 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and labeling requires 9 minutes per unit.
Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 50 units. Categorize the non-value-added time into wait and move time. Round the percentage to one decimal place.
Value-added lead time |
min. |
||
Non-value-added lead time: |
|||
|
Wait time lead time |
min. |
|
|
Move time lead time |
min. |
|
Total non-value-added lead time |
min. |
||
Total lead time |
min. |
||
Value-added ratio (as a percent) |
% |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- Pratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part A is made up of two components, one manufactured internally and one purchased from external suppliers. Part B is made up of three components, one manufactured internally and two purchased from suppliers. The company has two processes: fabrication and assembly. In fabrication, the internally produced components are made. Each component takes 20 minutes to produce. In assembly, it takes 30 minutes to assemble the components for Part A and 40 minutes to assemble the components for Part B. Pratt Company operates one shift per day. Each process employs 100 workers who each work eight hours per day. Part A earns a unit contribution margin of 20, and Part B earns a unit contribution margin of 24 (calculated as the difference between revenue and the cost of materials and energy). Pratt can sell all that it produces of either part. There are no other constraints. Pratt can add a second shift of either process. Although a second shift would work eight hours, there is no mandate that it employ the same number of workers. The labor cost per hour for fabrication is 15, and the labor cost per hour for assembly is 12. Required: 1. Identify the constraints facing Pratt, and graph them. How many binding constraints are possible? What is Pratts optimal product mix? What daily contribution margin is produced by this mix? 2. What is the drummer constraint? How much excess capacity does the other constraint have? Assume that a 1.5-day buffer inventory is needed to deal with any production interruptions. Describe the drum-buffer-rope concept using the Pratt data to illustrate the process. 3. Explain why the use of local labor efficiency measures will not work in Pratts TOC environment. 4. Suppose Pratt decides to elevate the binding constraint by adding a second shift of 50 workers (labor rates are the same as those of the first shift). Would elevation of Pratts binding constraint improve its system performance? Explain with supporting computations.Golding Manufacturing, a division of Farnsworth Sporting, Inc., produces two different models of bows and eight models of knives. The bow-manufacturing process involves the production of two major subassemblies: the limbs and the handle. The limbs pass through four sequential processes before reaching final assembly: lay-up, molding, fabricating, and finishing. In the Lay-Up Department, limbs are created by laminating layers of wood. In Molding, the limbs are heat treated, under pressure, to form a strong resilient limb. In the Fabricating Department, any protruding glue or other processing residue is removed. Finally, in Finishing, the limbs are cleaned with acetone, dried, and sprayed with the final finishes. The handles pass through two processes before reaching final assembly: pattern and finishing. In the Pattern Department, blocks of wood are fed into a machine that is set to shape the handles. Different patterns are possible, depending on the machines setting. After coming out of the machine, the handles are cleaned and smoothed. They then pass to the Finishing Department where they are sprayed with the final finishes. In Final Assembly, the limbs and handles are assembled into different models using purchased parts such as pulley assemblies, weight adjustment bolts, side plates, and string. Golding, since its inception, has been using process costing to assign product costs. A predetermined overhead rate is used based on direct labor dollars (80 percent of direct labor dollars). Recently, Golding has hired a new controller, Karen Jenkins. After reviewing the product costing procedures, Karen requested a meeting with the divisional manager, Aaron Suhr. The following is a transcript of their conversation: KAREN: Aaron, I have some concerns about our cost accounting system. We make two different models of bows and are treating them as if they were the same product. Now I know that the only real difference between the models is the handle. The processing of the handles is the same, but the handles differ significantly in the amount and quality of wood used. Our current costing does not reflect this difference in direct material input. AARON: Your predecessor is responsible. He believed that tracking the difference in direct material cost wasnt worth the effort. He simply didnt believe that it would make much difference in the unit cost of either model. KAREN: Well, he may have been right, but I have my doubts. If there is a significant difference, it could affect our views of which model is more important to the company. The additional bookkeeping isnt very stringent. All we have to worry about is the Pattern Department. The other departments fit what I view as a process-costing pattern. AARON: Why dont you look into it? If there is a significant difference, go ahead and adjust the costing system. After the meeting, Karen decided to collect cost data on the two models: the Deluxe model and the Econo model. She decided to track the costs for one week. At the end of the week, she had collected the following data from the Pattern Department: a. There were a total of 2,500 bows completed: 1,000 Deluxe models and 1,500 Econo models. b. There was no beginning work in process; however, there were 300 units in ending work in process: 200 Deluxe and 100 Econo models. Both models were 80 percent complete with respect to conversion costs and 100 percent complete with respect to direct materials. c. The Pattern Department experienced the following costs: d. On an experimental basis, the requisition forms for direct materials were modified to identify the dollar value of the direct materials used by the Econo and Deluxe models: Required: 1. Compute the unit cost for the handles produced by the Pattern Department, assuming that process costing is totally appropriate. 2. Compute the unit cost of each handle, using the separate cost information provided on materials. 3. Compare the unit costs computed in Requirements 1 and 2. Is Karen justified in her belief that a pure process-costing relationship is not appropriate? Describe the costing system that you would recommend. 4. In the past, the marketing manager has requested more money for advertising the Econo line. Aaron has repeatedly refused to grant any increase in this products advertising budget because its per-unit profit (selling price less manufacturing cost) is so low. Given the results in Requirements 1 through 3, was Aaron justified in his position?Golding Manufacturing, a division of Farnsworth Sporting Inc., produces two different models of bows and eight models of knives. The bow-manufacturing process involves the production of two major subassemblies: the limbs and the handles. The limbs pass through four sequential processes before reaching final assembly: layup, molding, fabricating, and finishing. In the layup department, limbs are created by laminating layers of wood. In the molding department, the limbs are heat-treated, under pressure, to form strong resilient limbs. In the fabricating department, any protruding glue or other processing residue is removed. Finally, in the finishing department, the limbs are cleaned with acetone, dried, and sprayed with the final finishes. The handles pass through two processes before reaching final assembly: pattern and finishing. In the pattern department, blocks of wood are fed into a machine that is set to shape the handles. Different patterns are possible, depending on the machines setting. After coming out of the machine, the handles are cleaned and smoothed. They then pass to the finishing department, where they are sprayed with the final finishes. In final assembly, the limbs and handles are assembled into different models using purchased parts such as pulley assemblies, weight-adjustment bolts, side plates, and string. Golding, since its inception, has been using process costing to assign product costs. A predetermined overhead rate is used based on direct labor dollars (80% of direct labor dollars). Recently, Golding has hired a new controller, Karen Jenkins. After reviewing the product-costing procedures, Karen requested a meeting with the divisional manager, Aaron Suhr. The following is a transcript of their conversation: Karen: Aaron, I have some concerns about our cost accounting system. We make two different models of bows and are treating them as if they were the same product. Now I know that the only real difference between the models is the handle. The processing of the handles is the same, but the handles differ significantly in the amount and quality of wood used. Our current costing does not reflect this difference in material input. Aaron: Your predecessor is responsible. He believed that tracking the difference in material cost wasnt worth the effort. He simply didnt believe that it would make much difference in the unit cost of either model. Karen: Well, he may have been right, but I have my doubts. If there is a significant difference, it could affect our views of which model is more important to the company. The additional bookkeeping isnt very stringent. All we have to worry about is the pattern department. The other departments fit what I view as a process-costing pattern. Aaron: Why dont you look into it? If there is a significant difference, go ahead and adjust the costing system. After the meeting, Karen decided to collect cost data on the two models: the Deluxe model and the Econo model. She decided to track the costs for one week. At the end of the week, she had collected the following data from the pattern department: a. There were a total of 2,500 bows completed: 1,000 Deluxe models and 1,500 Econo models. b. There was no BWIP; however, there were 300 units in EWIP: 200 Deluxe and 100 Econo models. Both models were 80% complete with respect to conversion costs and 100% complete with respect to materials. c. The pattern department experienced the following costs: d. On an experimental basis, the requisition forms for materials were modified to identify the dollar value of the materials used by the Econo and Deluxe models: Required: 1. Compute the unit cost for the handles produced by the pattern department, assuming that process costing is totally appropriate. Round unit cost to two decimal places. 2. Compute the unit cost of each handle, using the separate cost information provided on materials. Round unit cost to two decimal places. 3. Compare the unit costs computed in Requirements 1 and 2. Is Karen justified in her belief that a pure process-costing relationship is not appropriate? Describe the costing system that you would recommend. 4. In the past, the marketing manager has requested more money for advertising the Econo line. Aaron has repeatedly refused to grant any increase in this products advertising budget because its per-unit profit (selling price minus manufacturing cost) is so low. Given the results in Requirements 1 through 3, was Aaron justified in his position?
- Bienestar Inc., has the following departmental structure for producing a well-known multivitamin: A consultant designed the following cellular manufacturing structure for the same product: The times above the processes represent the time required to process one unit of product. Required: 1. Calculate the time required to produce a batch of 15 bottles using a batch-processing departmental structure. 2. Calculate the time to process 15 units using cellular manufacturing. 3. How much manufacturing time will the cellular manufacturing structure save for a batch of 15 units?Hepworth Communications produces cell phones. One of the four major electronic components is produced internally. The other three components are purchased from external suppliers. The electronic components and other parts are assembled (by the Assembly Department) and then tested (by the Testing Department). Any units that fail the test are sent to the Rework Department where the unit is taken apart and the failed component is replaced. Data from the Testing Department reveal that the internally produced component (made by the Component Department) is the most frequent cause of product failure. One out of every 50 phones fails because of a faulty internally produced component. Barry Norton is the manager of the Component Department. In a recent performance evaluation, the plant manager told Barry that he needed to be more sensitive to the needs of the departments customers. This charge puzzled Barry somewhatafter all, the component is not sold to anyone but is used in producing the plants cell phones. Required: 1. Who are Barrys customers? 2. Explain the plant managers charge to Barry to be more sensitive to his customers. Explain also how this increased sensitivity could improve the companys time-based competitive ability. 3. What role would cost management play in helping Barry be more sensitive to his customers?Use the following information for Exercises 5-44 through 5-46: The following six situations at Diviney Manufacturing Inc. are independent. a. A manual insertion process takes 30 minutes and 8 pounds of material to produce a product. Automating the insertion process requires 15 minutes of machine time and 7.5 pounds of material. The cost per labor hour is 12, the cost per machine hour is 8, and the cost per pound of materials is 10. b. With its original design, a gear requires 8 hours of setup time. By redesigning the gear so that the number of different grooves needed is reduced by 50%, the setup time is reduced by 75%. The cost per setup hour is 50. c. A product currently requires 6 moves. By redesigning the manufacturing layout, the number of moves can be reduced from 6 to 0. The cost per move is 20. d. Inspection time for a plant is 16,000 hours per year. The cost of inspection consists of salaries of 8 inspectors, totaling 320,000. Inspection also uses supplies costing 5 per inspection hour. The company eliminated most defective components by eliminating low-quality suppliers. The number of production errors was reduced dramatically by installing a system of statistical process control. Further quality improvements were realized by redesigning the products, making them easier to manufacture. The net effect was to achieve a close to zero-defect state and eliminate the need for any inspection activity. e. Each unit of a product requires 6 components. The average number of components is 6.5 due to component failure, requiring rework and extra components. Developing relations with the right suppliers and increasing the quality of the purchased component can reduce the average number of components to 6 components per unit. The cost per component is 500. f. A plant produces 100 different electronic products. Each product requires an average of 8 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 4 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are 900,000 per year. 5-44 Nonvalue-Added Costs Refer to the information for Diviney Manufacturing on the previous page. Required: Estimate the nonvalue-added cost for each situation.
- AKL Foundry manufactures metal components for different kinds of equipment used by the aerospace, commercial aircraft, medical equipment, and electronic industries. The company uses investment casting to produce the required components. Investment casting consists of creating, in wax, a replica of the final product and pouring a hard shell around it. After removing the wax, molten metal is poured into the resulting cavity. What remains after the shell is broken is the desired metal object ready to be put to its designated use. Metal components pass through eight processes: gating, shell creating, foundry work, cutoff, grinding, finishing, welding, and strengthening. Gating creates the wax mold and clusters the wax pattern around a sprue (a hole through which the molten metal will be poured through the gates into the mold in the foundry process), which is joined and supported by gates (flow channels) to form a tree of patterns. In the shell-creating process, the wax molds are alternately dipped in a ceramic slurry and a fluidized bed of progressively coarser refractory grain until a sufficiently thick shell (or mold) completely encases the wax pattern. After drying, the mold is sent to the foundry process. Here, the wax is melted out of the mold, and the shell is fired, strengthened, and brought to the proper temperature. Molten metal is then poured into the dewaxed shell. Finally, the ceramic shell is removed, and the finished product is sent to the cutoff process, where the parts are separated from the tree by the use of a band saw. The parts are then sent to the grinding process, where the gates that allowed the molten metal to flow into the ceramic cavities are ground off using large abrasive grinders. In the finishing process, rough edges caused by the grinders are removed by small handheld pneumatic tools. Parts that are flawed at this point are sent to welding for corrective treatment. The last process uses heat to treat the parts to bring them to the desired strength. In 20X1, the two partners who owned AKL Foundry decided to split up and divide the business. In dissolving their business relationship, they were faced with the problem of dividing the business assets equitably. Since the company had two plantsone in Arizona and one in New Mexicoa suggestion was made to split the business on the basis of geographic location. One partner would assume ownership of the plant in New Mexico, and the other would assume ownership of the plant in Arizona. However, this arrangement had one major complication: the amount of WIP inventory located in the Arizona plant. The Arizona facilities had been in operation for more than a decade and were full of WIP. The New Mexico facility had been operational for only 2 years and had much smaller WIP inventories. The partner located in New Mexico argued that to disregard the unequal value of the WIP inventories would be grossly unfair. Unfortunately, during the entire business history of AKL Foundry, WIP inventories had never been assigned any value. In computing the cost of goods sold each year, the company had followed the policy of adding depreciation to the out-of-pocket costs of direct labor, direct materials, and overhead. Accruals for the company are nearly nonexistent, and there are hardly ever any ending inventories of materials. During 20X1, the Arizona plant had sales of 2,028,670. The cost of goods sold is itemized as follows: Upon request, the owners of AKL provided the following supplementary information (percentages are cumulative): Gating had 10,000 units in BWIP, 60% complete. Assume that all materials are added at the beginning of each process. During the year, 50,000 units were completed and transferred out. The ending inventory had 11,000 unfinished units, 60% complete. Required: 1. The partners of AKL want a reasonable estimate of the cost of WIP inventories. Using the gating departments inventory as an example, prepare an estimate of the cost of the EWIP. What assumptions did you make? Did you use the FIFO or weighted average method? Why? (Note: Round unit cost to two decimal places.) 2. Assume that the shell-creating process has 8,000 units in BWIP, 20% complete. During the year, 50,000 units were completed and transferred out. (Note: All 50,000 units were sold; no other units were sold.) The EWIP inventory had 8,000 units, 30% complete. Compute the value of the shell-creating departments EWIP. What additional assumptions had to be made?Confer Company produces two different metal components used in medical equipment (Component X and Component Y). The company has three processes: molding, grinding, and finishing. In molding, molds are created, and molten metal is poured into the shell. Grinding removes the gates that allowed the molten metal to flow into the molds cavities. In finishing, rough edges caused by the grinders are removed by small, handheld pneumatic tools. In molding, the setup time is one hour. The other two processes have no setup time required. The demand for Component X is 600 units per day, and the demand for Component Y is 1,000 units per day. The minutes required per unit for each product are as follows: The company operates one eight-hour shift. The molding process employs 24 workers (who each work eight hours). Two hours of their time, however, are used for setups (assuming both products are produced). The grinding process has sufficient equipment and workers to provide 400 grinding hours per shift. The Finishing Department is labor intensive and employs 70 workers, who each work eight hours per day. The only significant unit-level variable costs are materials and power. For Component X, the variable cost per unit is 40, and for Component Y, it is 50. Selling prices for X and Y are 90 and 110, respectively. Confers policy is to use two setups per day: an initial setup to produce all that is scheduled for Component X and a second setup (changeover) to produce all that is scheduled for Component Y. The amount scheduled does not necessarily correspond to each products daily demand. Required: 1. Calculate the time (in minutes) needed each day to meet the daily market demand for Component X and Component Y. What is the major internal constraint facing Confer Company? 2. Describe how Confer should exploit its major binding constraint. Specifically, identify the product mix that will maximize daily throughput. 3. Assume that manufacturing engineering has found a way to reduce the molding setup time from one hour to 10 minutes. Explain how this affects the product mix and daily throughput.CodeHead Software Inc. does software development. One important activity in software development is writing software code. The manager of the WordPro Development Team determined that the average software programmer could write 25 lines of code in an hour. The plan for the first week in May called for 4,650 lines of code to be written on the WordPro product. The WordPro Team has five programmers. Each programmer is hired from an employment firm that requires temporary employees to be hired for a minimum of a 40-hour week. Programmers are paid 32.00 per hour. The manager offered a bonus if the team could generate more lines for the week, without overtime. Due to a project emergency, the programmers wrote more code in the first week of May than planned. The actual amount of code written in the first week of May was 5,650 lines, without overtime. As a result, the bonus caused the average programmers hourly rate to increase to 40.00 per hour during the first week in May. Instructions 1. If the team generated 4,650 lines of code according to the original plan, what would have been the labor time variance? 2. What was the actual labor time variance as a result of generating 5,650 lines of code? 3. What was the labor rate variance as a result of the bonus? 4. The manager is trying to determine if a better decision would have been to hire a temporary programmer to meet the higher programming demand in the first week of May, rather than paying out the bonus. If another employee was hired from the employment firm, what would have been the labor time variance in the first week? 5. Which decision is better, paying the bonus or hiring another programmer?
- Ingles Corporation is a manufacturer of tables sold to schools, restaurants, hotels, and other institutions. The table tops are manufactured by Ingles, but the table legs are purchased from an outside supplier. The Assembly Department takes a manufactured table top and attaches the four purchased table legs. It takes 16 minutes of labor to assemble a table. The company follows a policy of producing enough tables to ensure that 40 percent of next months sales are in the finished goods inventory. Ingles also purchases sufficient materials to ensure that materials inventory is 60 percent of the following months scheduled production. Ingless sales budget in units for the next quarter is as follows: Ingless ending inventories in units for July 31 are as follows: Required: 1. Calculate the number of tables to be produced during August. 2. Disregarding your response to Requirement 1, assume the required production units for August and September are 2,100 and 1,900, respectively, and the July 31 materials inventory is 4,000 units. Compute the number of table legs to be purchased in August. 3. Assume that Ingles Corporation will produce 2,340 units in September. How many employees will be required for the Assembly Department in September? (Fractional employees are acceptable since employees can be hired on a part-time basis. Assume a 40-hour week and a 4-week month.) (CMA adapted)Vollmer Manufacturing makes three components for sale to refrigeration companies. The components are processed on two machines: a shaper and a grinder. The times (in minutes) required on each machine are as follows: The shaper is available for 120 hours, and the grinder for 110 hours. No more than 200 units of component 3 can be sold, but up to 1,000 units of each of the other components can be sold. In fact, the company already has orders for 600 units of component 1 that must be satisfied. The profit contributions for components 1, 2, and 3 are 8, 6, and 9, respectively. a. Formulate and solve for the recommended production quantities. b. What are the objective coefficient ranges for the three components? Interpret these ranges for company management. c. What are the right-hand-side ranges? Interpret these ranges for company management. d. If more time could be made available on the grinder, how much would it be worth? e. If more units of component 3 can be sold by reducing the sales price by 4, should the company reduce the price?Use the following information for Exercises 5-44 through 5-46: The following six situations at Diviney Manufacturing Inc. are independent. a. A manual insertion process takes 30 minutes and 8 pounds of material to produce a product. Automating the insertion process requires 15 minutes of machine time and 7.5 pounds of material. The cost per labor hour is 12, the cost per machine hour is 8, and the cost per pound of materials is 10. b. With its original design, a gear requires 8 hours of setup time. By redesigning the gear so that the number of different grooves needed is reduced by 50%, the setup time is reduced by 75%. The cost per setup hour is 50. c. A product currently requires 6 moves. By redesigning the manufacturing layout, the number of moves can be reduced from 6 to 0. The cost per move is 20. d. Inspection time for a plant is 16,000 hours per year. The cost of inspection consists of salaries of 8 inspectors, totaling 320,000. Inspection also uses supplies costing 5 per inspection hour. The company eliminated most defective components by eliminating low-quality suppliers. The number of production errors was reduced dramatically by installing a system of statistical process control. Further quality improvements were realized by redesigning the products, making them easier to manufacture. The net effect was to achieve a close to zero-defect state and eliminate the need for any inspection activity. e. Each unit of a product requires 6 components. The average number of components is 6.5 due to component failure, requiring rework and extra components. Developing relations with the right suppliers and increasing the quality of the purchased component can reduce the average number of components to 6 components per unit. The cost per component is 500. f. A plant produces 100 different electronic products. Each product requires an average of 8 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 4 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are 900,000 per year. 5-46 Type of Activity Management Refer to the information for Diviney Manufacturing on the previous page. Required: For each situation, identify the cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection.