Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Question
Chapter 9, Problem 9.4P
To determine
The factors that would lead to the disqualification from bidding.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sir I want this question's slution in 30 min please. It's urgent
QUESTION 1
Once the contractor has received the notice to proceed, he mustdo the following:
OA Move the equipment
OB. Move the showers
OC. No answers are validi
OD Move materials and people
OE Move the equipment, materials, and people
QUESTION 2
During construction, one way to identify how long each acitvity will take is
OA After award, but before owner signs the Agreement
OB Interview other contractors who have done similar work
OC Create a schedule
OD. No answers are valid
OE In the pre-construction phase
OF Ask the owner how long they want the activity to last
QUESTION 3
One way a project schedule is used is to evaluate impact of changes in the work.
O True
False
QUESTION 4
A list of proposed subcontractor activities should be prepared during the following:
0 A. Budget preparation
OB Pre-construction phase
OC. Negotiation of contract
OD. Bid of the project
OE. No answers are validi
What are the inspections carried out on the tirfor machine?
Knowledge Booster
Similar questions
- ! I need a quick solution within 15 minutes With my best wishesTonarrow_forwardA contractor has a contract to construct the sanitary sewer, water line, storm drain, and street lighting for a new subdivision. The contractor uses the cost codes in Figure 2-6. The original estimate for the sewer was $25,000 and a $3,200 change order has been approved to add a manhole. The sewer work has been completed by the contractor at a cost of $27,365. The original estimate for the water line was $31,000 and no changes have been made to the budget. The costs to date for the water line are $31,300 and it is estimated that it will take another $450 to complete the water line. The water line is will install the storm drain. The original estimate for the outside lighting was $23,600 and no changes have been made to the budget. The contractor has subcontracted the outside lighting for $23,600. The subcontractor has billed $11,230 for materials. Determine the total estimated cost at completion for the project and the variance for each cost code.arrow_forwardPlease, I want a quick solutionarrow_forward
- pls answer full solution. thanks .arrow_forwardPlease give me right answer according to the question.. Don't copy from websites.. Note: This is not an assignment question. Thank you. Question :After reading the plan of the project, you have found out that the specified rebars are not locally available, What will be your action for this problem and why?arrow_forwardConstruction problems and solutions SITUATION 2: You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome heads. The subcontractor installed semi-recessed heads on the third floor. This was not picked up prior as a person cannot physically see more than one floor at a time. The client is very upset. QUESTION: Can you require the subcontractor to change them all out now? Would this be a good move given…arrow_forward
- SITUATION 2: You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome heads. The subcontractor installed semi-recessed heads on the third floor. This was not picked up prior as a person cannot physically see more than one floor at a time. The client is very upset. QUESTION: Can you require the subcontractor to change them all out now? Would this be a good move given the status of the inspections? What…arrow_forwardWhat information is not included in the front end specifications. Defective Work Contract Time Limits The ASTM Standard for the Modulus of Elasticity for the specified water main pipe Non of the above O Liquidated Damages Identify the term when a Contractor is penalized a specified monetary amount for everyday, that the Contract time period has been exceeded. Claim Liquidated Damages OBid Document O Unsafe Condition Summonsarrow_forwardWhat is the maintenance cost for screening of a wastewater treatment plant?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,