C402 quiz
.docx
keyboard_arrow_up
School
Columbia College *
*We aren’t endorsed by this school
Course
406
Subject
Civil Engineering
Date
Dec 6, 2023
Type
docx
Pages
3
Uploaded by CoachPower11443
QUESTION 1
1.
Changing conditions require continuous planning, preparing, ________, and assessing to reach the end state desired by the commander.
A
.
Analyzing
B
.
Executing
C
.
Engaging
10 points QUESTION 2
1.
While not _____, EEFI have the same priority as information collection.
A
.
PIR
B
.
CCIR
C
.
FFIR
10 points QUESTION 3
1.
According to ADP 5-0, the Army's framework for organizing and putting command and control into
action is which of the following?
A
.
Operational environment
B
.
Army design methodology
C
.
Operations process
10 points QUESTION 4
1.
Which of the following is a key concept of the Army design methodology?
A
.
Critical and creative thinking
B
.
Courses of action
C
.
Socratic method
10 points QUESTION 5
1.
According to ADP 5-0, which of the following precedes and guides the other activities of the operations process and concludes each operation or phase of an operation?
A
.
Planning
B
.
Assessment
C
.
Preparation
10 points QUESTION 6
1.
Which of the following apply to Army design methodology (ADM)?
A
.
Result in the production of an executable order
B
.
Detailed planning
C
.
Conceptual planning
10 points QUESTION 7
1.
For operations, staffs create three primary integration cells: plans cell, a current operations cell, and which of the following?
A
.
Command and control cell
B
.
Future operations cell
C
.
Synchronization cell
10 points QUESTION 8
1.
What is a key component of a plan?
A
.
Fires Annex
B
.
Commander's intent
C
.
Sustainment annex
10 points QUESTION 9
1.
Which of the following is the determination of the progress toward accomplishing a task, creating a condition, or achieving an objective?
A
.
Assessment
B
.
Preparation
C
.
Execution
10 points QUESTION 10
1.
Who are the most important participants in the operations process?
A
.
Executive officers
B
.
Commanders
C
S-3s
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Problem 2
From the following table of information: a) Draw the
precedence diagram; b) What is the probability that the project
can be completed om 24 days or less? In 21 days or less?
Activity
Precedes
Time in days
Optimistic
Time
Most likely
Time
Pessimistic
Time
A
C
5
6
7
H.
8
11
E
6
11
CIV 417/CPM
THE PROBABLE TIME ESTIMATE
Activity
Precedes
Time in days
Optimistic
Time
Most likely
Time
Pessimistic
Time
D
F
12
15
E
END
5
7
10
F
G
5
7
G
END
3
4
7
H
4
4
END
7
8
arrow_forward
Q2. (20 pts)
To handle recursive relationships, in practice, there are 2 possible approaches:
Approach #1. (according to the class's recommendations)
CName
ID
Name
Rank
Designer
PK/FK
PK
Ref
CName
CName
Approach # 2. (this is used by some industry practitioners)
MentorID
MenteeID
MentorWorkload
Designer
PK/FK
PK
Mentorship
PK/FK
Ref
PK/FK Designer.ID
PK/FK Designer.ID
FK
Ref
ID
Name
Rank
MentorID
MentorWorkload
(the Mentor is the person giving advice, the Mentee is the person receiving advice)
Which approach(es) allow(s) a designer to have more than one mentors? Explain.
(up to 4 lines)
Designer.ID
Which approach(es) allow(s) a designer to mentor more than one other designers? Explain.
(up to 4 lines)
arrow_forward
Q1/B/ For the project data in Table below, answer the following questions:
a) Draw an AOA network of the project and Perform forward path and
backward path calculations with critical path identification?
b) What are the effect of delaying activities C by 2 days and D by 20 days?
Duration
Immediate
Activity
(day)
predecessor
A
10
В
15
A
C
10
A
D
10
C
E
5
C
F
5
C
G
20
H
5
F, B
I
10
G
J
8.
H, E, D
K
5
I, J
arrow_forward
Will provide excellent feedback!
arrow_forward
Engineering Management ,i need solutions in 10 minutes please.
MCQ/PERT method differs with AOA method in the following:
A-PERT does not show project duration time while AOA does
B-PERT uses dummy activities while AOA does not
C-PERT has three estimated times for activity duration while AOA uses only one
arrow_forward
From the following table, develop network diagram, determine the critical path, andCalculate the minimum duration of project completion.Activity Predecessor DurationA -- 5B A 4C A 3D B 8E B 4F C 6G D,F 4H E 6I F 4J G,H,I 2
arrow_forward
d Describe the Terms Below (C
1) AASHTO.
5) PG 76-22
2) G.I.
6) Short term aging
arrow_forward
In a CPM network, the critical path has five activities. Their durations are
tabulated next.
Duration
Activity
Optimistic (To)
Most Likely (Tm)
Pessimistic (Tp)
A
2
5
9
B
3
4
8
C
4
6
9
D
5
10
20
E
3
5
9
Compute the following:
The probability that the project will finish by the end of day 32
The probability that the project will finish by the end of day 34
The probability that the project will finish before day 30
The probability that the project will finish on day 32
The probability that the project will finish no later than day35
The probability that the project will finish at least 2 days early
The probability that the project will finish at least 2 days late
The probability that the project will finish on day 32 ±1 day
The completion date with at least a 90% confidence level
arrow_forward
flöw
D. None of these
Q1-B: ANSWER BY TRUE OR FALSE:
1- One of the important reasons for resource scheduling is the optimal use of the crash program.
2- The general contractor, also known as the prime contractor, enters into a contract with the owner to
deliver the construction project
3- A Gantt Chart is used for planning, scheduling and monitoring projects, and managing the
dependencies between project tasks
4- Programed Evaluation Review Technique is one of deterministic method
5- The construction industry is vast and varied. Just take a look around- from homes to highways to
hospitals-and you see the results of this industry.
arrow_forward
Form this schedule of activities, what is the expected time to complete the project?
Immediate predecessor
Activity
Time
12
14
5
E
A
F
B,C,E
G
10
22
Select one:
O a. 21
ОБ. 20
c.
O c. 19
O d. 22
4,
arrow_forward
Q2/ For the project data in Table below, answer the following questions:
a) Draw an AOA network of the project and Perform forward path and
backward path calculations with critical path identification?
b) What are the effeet of delaying activities C by 2 days and D by 20 days?
Duration
Immediate
Activity
(day)
predecessor
A
20
23
D.
19
A.
16
24
G
18
E. B
H
4
D,E, B
I
10
G.D
arrow_forward
Q/ For the project data in Table below, answer the following questions:
a) Draw an AOA network of the project and Perform forward path
and backward path calculations with critical path identification?
b) What are the effect of delaying activities C by 5 days, G by 3 days
and D by 5 days?
Duration
Immediate
Activity
(day)
predecessor
A
B
11
A
A
D
8
B.C
E
A
F
11
D, E
G
7
H
9.
F,G
I
7
H
J
H
arrow_forward
Assignment # 1
3. For the following schedule, draw the arrow diagram
(AOA), perform the CPM calculations, mark the
critical path, and complete the table.
Activity Duration Precedent ES EFLS LFTFFF
A
B
C
D
E
F
G
H
I
J
K
L
M
3
10
7
6
5
4
2
4
10
6
4
2
1
A
A
B
B, C
с
D
D, E
E
E, F
G, H, I
H, I
J, L
CRITICAL PATH
arrow_forward
Find the following:
1- The optimum period and the corresponding time
2- The network plan detailed in the table below, noting that the
additional cost is $ 2000 per week
Activity Normal duration Normal cost Crash duration
Crash
cost
weeks
$4
5000
weeks
3
1-2
13000
3000
12000
7000
10000
1-3
2-3
4
3600
2.
3-4
5.
5000
3
331
arrow_forward
Construction Project Management
2021
Homework 1:
By using PERT technique, answer all of the following points:
1- Develop the network diagram
2- Define the critical path and the total project duration
3- In which week, the probability of completion the project would be 95%
Activity
Preceding Activity
a, Weeks
m, Weeks
b, Weeks
A
4.5
8.5
9.5
-----
A, C, D
5
7
9.
7.5
8.5
12.5
D
G
5
6.
7
E
A
8
11
14
F
G
10.5
12
13.5
G
10.5
14.5
15.5
H
G
11
15
19
I
G
8
10
J
I
5.5
6.
6,5
В, Е, F
В, Е, F, H, J
B, E, F, H, J
K
11.5
12.5
16.5
L
10.5
12
13.5
M
13
16
19
I
9
10
17
M
16
17.5
22
L, M, N
12
13
14
M
11
14
17
K, O
11.5
15
18,5
arrow_forward
Need Asap! Thank you
arrow_forward
Example 1
Construct a CPM network for a project having the following activities:
Activity
A
P
G
N
M
L
B
F
K
Duration
15
12
5
3
8
10
3
5
5
4
Preceded by
1. Draw the CPM network for this project.
C,B,N
H,K
P
P
A
A
B,C,L,M,N
E
------
----
2. What are the critical path activities?
3. What is the expected project completion time?
Determine ES,EF,LS,LF,TF for each activity ?
arrow_forward
Question 3A. The three-phase procedure in network analysis method consist of:i. planning,ii. scheduling andiii. Time monitoring.You have been tasked to plan for the construction of a simple building, a. Identify the main activities to be undertaken to complete the substructure.b. List the activities in sequence to complete work to the substructure level.c. Identify the various labour resources to be used for the construction to the substructure level.
arrow_forward
Scenario 1 – applies to the measurement task and the application of
measurement principles questions in CMA1
You are the consultant Quantity Surveyor (QS) working for a leading provider of sustainable design
and construction solutions and you have been assigned to work with an inexperienced client on a
large construction project. The traditionally procured project is currently at the Technical Design
Stage (RIBA 2020) and your manager has asked you to perform the following tasks.
The PDF drawings listed below are available on the VLE in Week 8: Assignment 1 preparation and
are included to develop measurement skills only.
• D10104 Ground floor plan 2024
• D10115 Section AA 2024.
Following traditional measurement conventions and using a Standard Method of Measurement
(SMM), take off quantities for selected superstructure items.
• External cavity wall: Do not Measure the Porch
o The external half brick outer skin
o Forming 100mm cavity and 50mm cavity insulation
o Block wall inner skin.
•…
arrow_forward
(CONSTRUCTION MANAGEMENT).
arrow_forward
Q-
was a work
.... ...
.... ..
progress schedule that required in
engineering design steps.
O Network analysis
Critical path method
Bar chart method
Program evaluation
All answers
arrow_forward
J 5
arrow_forward
QUESTION 7
Level of Service is a quantitative measure used to describe operational conditions.
O True
False
arrow_forward
3. For the following seven-activity project, develop a precedence network, calculate all relevant characteristics of each activity (ES,
EF, LS, LF, TF), and the project duration. Then go through a repetitive process to expedite the project on a least-cost basis until the
project is crashed. The solution should include the precedence diagram and calculations for each activity, and then the cyclical
calculation to shorten the project activity by activity in a least-cost manner. What is the total cost of the crashed project? Why is this
less than the sum of the crashed costs for the seven activities? Please use Table A (Table A-2.pdf Please provide a detailed
answer to this question.
arrow_forward
Example I
Construct a CPM network for a project having the following activities:
G
B
Activity
Duration
A
P
N
M
L
F
K
15
12
5
3
8
10
5
5
4
Preceded by
C,B,N
H,K
P
P
A
A
B,C,L,M,N
E
------
---
1. Draw the CPM network for this project.
2. What are the critical path activities?
3. What is the expected project completion time?
Determine ES,EF,LS,LF,TF for each activity?
arrow_forward
Draw in activity arrow method.
arrow_forward
Answer for Question 2 (b):
Table 1: Work programme for safety and health
Gantt Chart (Duration, days)
Duration
Dependency
Task
(Days)
ID
3
I Safety & health risk identification
2 Assessing risk for each activity
5
1FS
3 Preparation of safe work method statement
2SS+3 days
Installation of signages for safety & health
information
4
3FS-4 days
5 Safety & health induction training
3
ISS+2 days
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- Problem 2 From the following table of information: a) Draw the precedence diagram; b) What is the probability that the project can be completed om 24 days or less? In 21 days or less? Activity Precedes Time in days Optimistic Time Most likely Time Pessimistic Time A C 5 6 7 H. 8 11 E 6 11 CIV 417/CPM THE PROBABLE TIME ESTIMATE Activity Precedes Time in days Optimistic Time Most likely Time Pessimistic Time D F 12 15 E END 5 7 10 F G 5 7 G END 3 4 7 H 4 4 END 7 8arrow_forwardQ2. (20 pts) To handle recursive relationships, in practice, there are 2 possible approaches: Approach #1. (according to the class's recommendations) CName ID Name Rank Designer PK/FK PK Ref CName CName Approach # 2. (this is used by some industry practitioners) MentorID MenteeID MentorWorkload Designer PK/FK PK Mentorship PK/FK Ref PK/FK Designer.ID PK/FK Designer.ID FK Ref ID Name Rank MentorID MentorWorkload (the Mentor is the person giving advice, the Mentee is the person receiving advice) Which approach(es) allow(s) a designer to have more than one mentors? Explain. (up to 4 lines) Designer.ID Which approach(es) allow(s) a designer to mentor more than one other designers? Explain. (up to 4 lines)arrow_forwardQ1/B/ For the project data in Table below, answer the following questions: a) Draw an AOA network of the project and Perform forward path and backward path calculations with critical path identification? b) What are the effect of delaying activities C by 2 days and D by 20 days? Duration Immediate Activity (day) predecessor A 10 В 15 A C 10 A D 10 C E 5 C F 5 C G 20 H 5 F, B I 10 G J 8. H, E, D K 5 I, Jarrow_forward
- Will provide excellent feedback!arrow_forwardEngineering Management ,i need solutions in 10 minutes please. MCQ/PERT method differs with AOA method in the following: A-PERT does not show project duration time while AOA does B-PERT uses dummy activities while AOA does not C-PERT has three estimated times for activity duration while AOA uses only onearrow_forwardFrom the following table, develop network diagram, determine the critical path, andCalculate the minimum duration of project completion.Activity Predecessor DurationA -- 5B A 4C A 3D B 8E B 4F C 6G D,F 4H E 6I F 4J G,H,I 2arrow_forward
- d Describe the Terms Below (C 1) AASHTO. 5) PG 76-22 2) G.I. 6) Short term agingarrow_forwardIn a CPM network, the critical path has five activities. Their durations are tabulated next. Duration Activity Optimistic (To) Most Likely (Tm) Pessimistic (Tp) A 2 5 9 B 3 4 8 C 4 6 9 D 5 10 20 E 3 5 9 Compute the following: The probability that the project will finish by the end of day 32 The probability that the project will finish by the end of day 34 The probability that the project will finish before day 30 The probability that the project will finish on day 32 The probability that the project will finish no later than day35 The probability that the project will finish at least 2 days early The probability that the project will finish at least 2 days late The probability that the project will finish on day 32 ±1 day The completion date with at least a 90% confidence levelarrow_forwardflöw D. None of these Q1-B: ANSWER BY TRUE OR FALSE: 1- One of the important reasons for resource scheduling is the optimal use of the crash program. 2- The general contractor, also known as the prime contractor, enters into a contract with the owner to deliver the construction project 3- A Gantt Chart is used for planning, scheduling and monitoring projects, and managing the dependencies between project tasks 4- Programed Evaluation Review Technique is one of deterministic method 5- The construction industry is vast and varied. Just take a look around- from homes to highways to hospitals-and you see the results of this industry.arrow_forward
- Form this schedule of activities, what is the expected time to complete the project? Immediate predecessor Activity Time 12 14 5 E A F B,C,E G 10 22 Select one: O a. 21 ОБ. 20 c. O c. 19 O d. 22 4,arrow_forwardQ2/ For the project data in Table below, answer the following questions: a) Draw an AOA network of the project and Perform forward path and backward path calculations with critical path identification? b) What are the effeet of delaying activities C by 2 days and D by 20 days? Duration Immediate Activity (day) predecessor A 20 23 D. 19 A. 16 24 G 18 E. B H 4 D,E, B I 10 G.Darrow_forwardQ/ For the project data in Table below, answer the following questions: a) Draw an AOA network of the project and Perform forward path and backward path calculations with critical path identification? b) What are the effect of delaying activities C by 5 days, G by 3 days and D by 5 days? Duration Immediate Activity (day) predecessor A B 11 A A D 8 B.C E A F 11 D, E G 7 H 9. F,G I 7 H J Harrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning