M1_Activity_2
.docx
keyboard_arrow_up
School
Chisholm Institute of TAFE *
*We aren’t endorsed by this school
Course
CPC50220OL
Subject
Civil Engineering
Date
Apr 3, 2024
Type
docx
Pages
18
Uploaded by MasterScienceRabbit32
CPC40120/CPC50220 Module 1 Assessment 2.1
Assessment Cover Sheet
The Cover Sheet must be completed before you start your assessment.
Student Surname
Mohseni Azad
Student Given
Name
Payam
Qualification
CPCC40120/CPC50220 CertIV/Diploma of Building and Construction (Building)
Module of Study
Module 1
Assessment Name
Module 1 Activity 2.1- Plans
Trainer Name
Alex Kubsch
Student Statement
Plagiarism is a form of cheating. It is taking and using someone else’s
thoughts or writings and representing them as your own. Plagiarism is a
serious act and may result in a participant’s exclusion from a Unit of
Competency or a course. This in turn may require for students to pay to re-
complete the module or course at a later date. The following list outlines some of the activities for which a participant can
be accused of plagiarism:
1.
Presenting any work by another individual as one’s own unintentionally
2.
Handing in assessments markedly similar to or copied from another student
3.
Presenting the work of another individual or group as their own work.
4.
Handing up assessments without the adequate acknowledgement of sources used, including assessments taken totally or in part from the internet.
Many of the workbook activities are ‘open book’ yet should still be
conducted under test conditions without consultation with other students. If
you are unsure of any assessment requirements you should check with your
Trainer / Assessor.
By submitting this assessment electronically you declare that all work for
assessment tasks submitted for this assessment is your own with no part of
© House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 1 of 18
CPC40120/CPC50220 Module 1 Assessment 2.1
any assessment being copied/plagiarised from another person’s work, except
where authorised and listed / referenced.
Scenario - Leary Avenue, East Bentleigh
You will need to refer to this scenario for Activity 2.1 – Plans and Activity 2.2 – Variations and client
communications.
John and Joan Smith have engaged your services for the construction of their house, a two storey dwelling
on Leary Avenue in East Bentleigh. The contract documents have been signed and the site plans have been
produced externally by a surveyor.
For this scenario, you will need to refer to the following documentation:
PN33837 Leary Ave Plan Pack V2.0
PN33837 Leary Ave Project Documentation V2.0
Activity 2.1- Plans - Answer sheet V1.0
Prior to commencement of the project, you are required to review the project documentation and the plan
pack in order to ensure that you understand the documents before starting the construction process.
To complete the build, you are aware that you will need to contract different labourers to assist you with
the various stages of construction.
You are to work through the following tasks as part of the planning phase for this construction project.
Part A
Question
Answer
Job Number and Sheet (Drawing) Number where the item is detailed
State the location of the site Lot 6 NO: 4 LEARY AVENUE BENTLIGH EAST 3165 VICTORIA Job Number :
33837 ACC
Sheet No: 1.1 Identify the title block on 3 plans and confirm the version numbers are current,
Site Plan
Ground Floor Plan
First Floor Plan
Job Number :
33837 ACC
Sheet No: © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 2 of 18
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and Sheet (Drawing) Number where the item is detailed
V6
1.1,2.1,2.2
Identify which side of the building faces true north
FRONT
Job Number :
33837 ACC
Sheet No: 1.1
Detail all the setbacks of the property
FRONT: 4500mm
RHS : 2000mm
LHS : 4000 mm
BACK: 3000mm
Job Number :
33837 ACC
Sheet No: 1.1
HWS appears on 5 (five) plans. List the five plans
Grand Floor Plan, Elevations 1, Electrical Ground Floor , Electrical First floor Plan ,slab Plan, Job Number :
33837 ACC
Sheet No: 2.1,3.1,4.1,4.2,5.1
How many smoke detectors are planned?
3 SMOKE DETECTORS
Job Number :
33837 ACC
Sheet No: 2.1,2.2
State the location of the site Lot 6 NO: 4 LEARY AVENUE BENTLIGH EAST 3165 VICTORIA
Job Number :
33837 ACC
Sheet No: 1.1 Identify the title block on 3 plans and confirm the version numbers are current,
Site Plan
Ground Floor Plan
First Floor Plan
V6
Job Number :
33837 ACC
Sheet No: 1.1,2.1,2.2
Identify which side of the building faces true north
FRONT
Job Number :
33837 ACC
Sheet No: 1.1
Detail all the setbacks of the property
FRONT: 4500mm
Job Number :
33837 © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 3 of 18
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and Sheet (Drawing) Number where the item is detailed
RHS : 2000mm
LHS : 4000 mm
BACK: 3000mm
ACC
Sheet No: 1.1
Where is the LPD (legal
point of discharge) located?
North-Eastern Corner; TBC On Site
Job Number :
33837 ACC
Sheet No: 1.1
What is the fall of land along the west side of the property?
22.26
Job Number :
33837 ACC
Sheet No: 1.1
List the types of roof
cladding being used
Concrete roof tile for Main Roof, Klip-lok zincalume for Garage Roof
Job Number :
33837 ACC
Sheet No: 3.1
Identify Sectional Detail Plan. Name three (3) items of information that would be shown on a section detail of a concrete footing and floor slab” detail
of concrete footing and floor slab
Vapour Barrier
Damp proof coursing membrane
Steel reinforcement
Job Number :50085
Sheet No: 1&2 of 7
What is the plasterboard thickness around the stairwell?
10mm PLASTERBORD Job Number :33839
Sheet No: 9.3
Name the 3 (three) external wall claddings
BRICK
RENDER
Job Number :33837
© House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 4 of 18
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and Sheet (Drawing) Number where the item is detailed
PRE-PRIMED ‘SHADOWCALD’ TR. TIMBER WALL CLADDING
Sheet No: 3.1
Provide 3 examples of symbols and 3 examples of abbreviations from the
drawings.
SYMBOLS;
1.SCALE
2.DOOR 3.WINDOW ABBREVIATIONS:
1:BATH
2:SMOKE DETECTOR
3:ROOM
Job Number :33837
Sheet No: 2.1&2.2
Identify 3 major spaces off the floor plan and provide dimensions
GARAGE 6470*3690
THEARTE 6000*3600
ENTRY 5990*1450
Job Number :33837
Sheet No: 2.1
© House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 5 of 18
CPC40120/CPC50220 Module 1 Assessment 2.1
Part B
© House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.1| 26.02.2024 | Page 6 of 18
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Task
A. High Level Analysis
B. Selection of Hardware Platform
C. Installation and Commissioning of hardware
D. Detailed Analysis of core modules
E. Detailed Analysis of supporting Modules
Programming of core modules
F.
G. Programming of supporting Modules
H. Quality Assurance of core modules
1. Quality Assurance of supporting Modules
J. Core module training
K. Development and QA of accounting Report
L. Development and QA of Management reporting
M. Development of Management Information System
N. Detailed Training
Duration Times are in days
5 days work per week (Saturdays and Sundays are day-off)
Create a Gantt Chart starting November 28, 2022.
Duration Prerequisite
1
1
2
2
2
2
3
1
1
1
1
1
1
1
A
B
A
D
D
E
F
G
C, H
E
E
L
I, J, K, M
arrow_forward
3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack.
(2) Cables By Us is bringing a new product on line to be manufactured in their current facility in
existing space. The owners have identified 11 activities and their precedence relationships.
(a) Draw the network diagram of this project
(b) Calculate the project completion time
(c) Identify the critical path
日
OF 5
SONY
arrow_forward
Part 1: Take-home and Viva activity related to topics covered in LO1.
|You work as a mechanical software engineer in a mechanical company which provides modelling and
design services for different types of mechanical applications. Your main tasks are to analyze and assess
different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your
direct manager assigned you to work on specific tasks for different running projects.
Project 1:
Simply supported beams are usually used in structures due to their high stability and performance in resisting
shear stress and bending moment, they are applied in variety of applications such as steel-frame used for
advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the
bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear
force, bending moment and stress đue to bending for bridge modeled as simply supported beam…
arrow_forward
Please explain the photo attached
Topic: STANDARD OF PROFESSIONAL PRACTICE (SPP) ON CONSTRUCTION MANAGEMENT SERVICES
arrow_forward
Civil Engineering
Q4:-what are the common problem being faced in the construction site.briefly discuss.
arrow_forward
What is stop notice release bond method?When is it used?
arrow_forward
Question 48
schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored.
O resource-loaded
O time-loaded
A
look-ahead
O preliminary
amazon
Bcer
F12
Scr Lk
Artêtdéf
PrtSclimpréc
SysRg/Syst.
F4
F5
F6
F7
F8
F9
F10
F11
Bre
VA
arrow_forward
Can a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.
arrow_forward
ESSAY
Instruction: Answer the essay questions. Write your answers in a short bond paper (8.5
in. by 11 in.). Use the attached format in this module.
1. What are the different professional responsibilities of a Civil Engineer?
2. Why do we need to know the obligations and liabilities of both the Civil Engineer
and the Client?
3. When do the engineering services get suspended or terminated?
4. How should a dispute between the Civil Engineer and the Client be settled?
5. What are the typical services offered by Civil Engineers or civil engineering firms?
6. How is a Civil Engineer selected for a particular service or project?
7. What are the requirements for foreign civil engineers to practice their profession in
the Philippines?
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
- Present a design proposal that utilises alternative methods of construction.
arrow_forward
The three basic stages of construction planning are:
(A) Preconstruction planning, post-construction planning, and legal review
(B) Pre-conceptual planning, preconstruction planning, and construction planning
(C) Pre-conceptual planning, conceptual planning, and post-conceptual planning
(D) Pre-construction planning, construction planning, and planning review
OD
O No answer text provided.
O No answer text provided.
O No answer text provided.
Question 2
arrow_forward
Using the same CPM diagram, what is the total project duration?
Immediate
Estimated
Activity
Activity Description
Predecessors
Duration
A
Excavate
2 weeks
Lay the foundation
Put up the rough wall
Put up the roof
Install the exterior plumbing
Install the interior plumbing
Put up the exterior siding
Do the exterior painting
B
A
4 weeks
C
10 weeks
D
C
6 weeks
4 weeks
5 weeks
7 weeks
9 weeks
7 weeks
8 weeks
4 weeks
E
C
F
E
G
D
E, G
Do the electrical work
F, I
Put up the wallboard
Install the flooring
Do the interior painting
Install the exterior fixtures
K
5 weeks
M
2 weeks
N
Install the interior fixtures
K, L
6 weeks
Total = 79 weeks
arrow_forward
Topics good for case study relating to construction safety and health
arrow_forward
What are the practical constraint?
arrow_forward
Case Study Recommendations for Construction Safety and Health
arrow_forward
Develop a CPM schedule using the information provided and making assumptions as needed identifying all major milestones, including general conditions and mobilizations and clean up. you may use ms project if wanted
Project duration 67 days
building an office building in a crowded area of a college
4 story building with glass and metal curtain wall /R/Conc frame
story height (LF) 24.00
Floor area (SF) 72000
no basement
building cost $11,439,000
Please assume any information needed.
arrow_forward
Of the items listed below, identify which components are included in a scope of
work?
A) A description of the work.
OB) Technical requirements
Oc) Identification of major components
OD) A detailed schedule
OE) Basis for the scope
OF) Work Breakdown Structure Deliverables
OG) List appropriate quality standards
OH) A list of project participants
1) Exclusions
OJ) Detailed description of the work.
arrow_forward
What Case of failure and accident due to miscoordination of construction equipment.
arrow_forward
! I need a quick solution within 15 minutes With my best wishesTon
arrow_forward
Kindly give me both answers.... This is not an assignment question.
arrow_forward
1- Provide a brief response for each of the below case studies
2-State the code of fundamental canons of ethics, rules of practice and professional obligation.
3-write a brief conclusion for each case
CASE 1
Engineer A is a recently hired software engineer recruited from college by HyTechCo, a global software company. As part of his first assignment, Engineer A’s supervisor, Engineer B, requests that he write software to provide security for e-mailed documents within HyTechCo. After completing the project, Engineer A learns on an IT industry news Web site about an individual with another company who had made similar software available to overseas clients and was being investigated by the government because of U.S. laws that require that such software not be sent overseas because of national security concerns. Engineer A learns that the software he developed for HyTechCo has been sent overseas by HyTechCo’s IT department for use by HyTechCo’s offices abroad. Engineer A informs Engineer…
arrow_forward
Please explain the photo attached
Subject: Construction Management
arrow_forward
Please provide the enough information and definition of these construction terms:
Civil engineer
Clearing and grubbing
Client
Commercial availability
Commercial building
Compaction test
Concrete cover
Concrete curing
Concrete Hollow Block (CHB)
Confined Space
Construction built out
Construction estimate
Construction firm
Construction plan
Construction schedule
Construction site
Contingency plan
Contract formation
Convenience outlet
Conversion
Crane
Critical path
Cross sectional area
Cut and fill
Daily Activity Report (DAR)
arrow_forward
4
arrow_forward
One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineering
arrow_forward
PLEASE KINDLY CHECK IF THIS IS CORRECT! RATE WILL BE GIVEN!
arrow_forward
If you were working with a set of project specifications prepared in CSI Format, under what division numbers would you find the following subjects?_______ Plumbing
_______ Sheet metal fabrications
_______ Project meetings
_______ Contractorsubmittals
_______ Painting
_______ Piling
_______ Roof flashing and sheet metal
_______ Butler buildings
______ Alarm systems
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Related Questions
- Task A. High Level Analysis B. Selection of Hardware Platform C. Installation and Commissioning of hardware D. Detailed Analysis of core modules E. Detailed Analysis of supporting Modules Programming of core modules F. G. Programming of supporting Modules H. Quality Assurance of core modules 1. Quality Assurance of supporting Modules J. Core module training K. Development and QA of accounting Report L. Development and QA of Management reporting M. Development of Management Information System N. Detailed Training Duration Times are in days 5 days work per week (Saturdays and Sundays are day-off) Create a Gantt Chart starting November 28, 2022. Duration Prerequisite 1 1 2 2 2 2 3 1 1 1 1 1 1 1 A B A D D E F G C, H E E L I, J, K, Marrow_forward3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack. (2) Cables By Us is bringing a new product on line to be manufactured in their current facility in existing space. The owners have identified 11 activities and their precedence relationships. (a) Draw the network diagram of this project (b) Calculate the project completion time (c) Identify the critical path 日 OF 5 SONYarrow_forwardPart 1: Take-home and Viva activity related to topics covered in LO1. |You work as a mechanical software engineer in a mechanical company which provides modelling and design services for different types of mechanical applications. Your main tasks are to analyze and assess different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your direct manager assigned you to work on specific tasks for different running projects. Project 1: Simply supported beams are usually used in structures due to their high stability and performance in resisting shear stress and bending moment, they are applied in variety of applications such as steel-frame used for advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear force, bending moment and stress đue to bending for bridge modeled as simply supported beam…arrow_forward
- Please explain the photo attached Topic: STANDARD OF PROFESSIONAL PRACTICE (SPP) ON CONSTRUCTION MANAGEMENT SERVICESarrow_forwardCivil Engineering Q4:-what are the common problem being faced in the construction site.briefly discuss.arrow_forwardWhat is stop notice release bond method?When is it used?arrow_forward
- Question 48 schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored. O resource-loaded O time-loaded A look-ahead O preliminary amazon Bcer F12 Scr Lk Artêtdéf PrtSclimpréc SysRg/Syst. F4 F5 F6 F7 F8 F9 F10 F11 Bre VAarrow_forwardCan a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.arrow_forwardESSAY Instruction: Answer the essay questions. Write your answers in a short bond paper (8.5 in. by 11 in.). Use the attached format in this module. 1. What are the different professional responsibilities of a Civil Engineer? 2. Why do we need to know the obligations and liabilities of both the Civil Engineer and the Client? 3. When do the engineering services get suspended or terminated? 4. How should a dispute between the Civil Engineer and the Client be settled? 5. What are the typical services offered by Civil Engineers or civil engineering firms? 6. How is a Civil Engineer selected for a particular service or project? 7. What are the requirements for foreign civil engineers to practice their profession in the Philippines?arrow_forward
- - Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context. - Present a design proposal that utilises alternative methods of construction.arrow_forwardThe three basic stages of construction planning are: (A) Preconstruction planning, post-construction planning, and legal review (B) Pre-conceptual planning, preconstruction planning, and construction planning (C) Pre-conceptual planning, conceptual planning, and post-conceptual planning (D) Pre-construction planning, construction planning, and planning review OD O No answer text provided. O No answer text provided. O No answer text provided. Question 2arrow_forwardUsing the same CPM diagram, what is the total project duration? Immediate Estimated Activity Activity Description Predecessors Duration A Excavate 2 weeks Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting B A 4 weeks C 10 weeks D C 6 weeks 4 weeks 5 weeks 7 weeks 9 weeks 7 weeks 8 weeks 4 weeks E C F E G D E, G Do the electrical work F, I Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures K 5 weeks M 2 weeks N Install the interior fixtures K, L 6 weeks Total = 79 weeksarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning