CPC40120/CPC50220 Module 1 Assessment 2.1
Assessment Cover Sheet
The Cover Sheet must be completed before you start your assessment.
Student Surname
Student
Given Name
Qualification
CPCC40120/CPC50220 CertIV/Diploma of Building and Construction
(Building)
Module of Study
Module 1
Assessment Name
Module 1 Activity 2.1- Plans
Trainer Name
Student Statement
Plagiarism is a form of cheating. It is taking and using someone else’s thoughts or writings and
representing them as your own. Plagiarism is a serious act and may result in a participant’s exclusion
from a Unit of Competency or a course. This in turn may require for students to pay to re-complete
the module or course at a later date.
The following list outlines some of the activities for which a participant can be accused of plagiarism:
1.
Presenting any work by another individual as one’s own unintentionally
2.
Handing in assessments markedly similar to or copied from another student
3.
Presenting the work of another individual or group as their own work.
4.
Handing up assessments without the adequate acknowledgement of sources used, including
assessments taken totally or in part from the internet.
Many of the workbook activities are ‘open book’ yet should still be conducted under test conditions
without consultation with other students. If you are unsure of any assessment requirements you
should check with your Trainer / Assessor.
By submitting this assessment electronically you declare that all work for assessment tasks submitted
for this assessment is your own with no part of any assessment being copied/plagiarised from
another person’s work, except where authorised and listed / referenced.
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 1 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1
Scenario - Leary Avenue, East Bentleigh
You will need to refer to this scenario for Activity 2.1 – Plans and Activity 2.2 – Variations and client
communications.
John and Joan Smith have engaged your services for the construction of their house, a two storey dwelling on
Leary Avenue in East Bentleigh. The contract documents have been signed and the site plans have been
produced externally by a surveyor.
For this scenario, you will need to refer to the following documentation:
▪
PN33837 Leary Ave Plan Pack V2.0
▪
PN33837 Leary Ave Project Documentation V2.0
▪
Activity 2.1- Plans - Answer sheet V1.0
Prior to commencement of the project, you are required to review the project documentation and the plan
pack in order to ensure that you understand the documents before starting the construction process.
To complete the build, you are aware that you will need to contract different labourers to assist you with the
various stages of construction.
You are to work through the following tasks as part of the planning phase for this construction project.
Part A
Question
Answer
Job Number and
Sheet (Drawing)
Number where
the item is
detailed
State the location of the
site
Lot 6
No 4
Leary Avenue
Melbourne
Job No:33837
Sheet No: 1.1
Identify the title block on
3 plans and confirm the
version numbers are
current,
Site Plan
Ground floor plan
First floor plan
Job No.33837
Identify which side of
the building faces true
north
Front of the building
Job No:33837
Sheet No: 1.1
Detail all the setbacks of
the property
4500mm from front of building to North boundary
3000mm from back of building to south boundary
2000mm to the east side of building and 4000mm to the
west
Job No:33837
Sheet No: 1.1
HWS appears on 5 (five)
plans. List the five plans
Site Plan
Ground Floor Plan
Elevations 1 Plan
Electrical Ground floor Plan
Job No:33837
Sheet No:1.1
Sheet No: 2.1
Sheet No:3.1
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 2 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and
Sheet (Drawing)
Number where
the item is
detailed
Slab Plan
Articulation Layout
Sheet No:4.1
Sheet No:5.1
Job No:50085
Sheet No:5 of 7
How many smoke
detectors are planned?
3
2.1
Referencing the BCA
Volume II, are the
respective locations of
smoke detectors
appropriate? (state the
reference page and
clause of BCA)
Yes.
Part 3.7. 5 specifies different smoke
alarm requirements for Class 1a and Class
1b buildings
Job No:50085
Sheet No.
4.1,4.2
Where is the LPD (legal
point of discharge)
located?
The Lpd is located on the North West corner of the garage
running north
Job No:50085
Sheet No:6 of 7
What is the fall of land
along the west side of
the property?
How many downpipes
are there (including
spreaders)?
6
job no: 33837
sheet no :
List the types of roof
cladding being used
Concrete roof tiles on main roof areas
‘klip lock zinc’ on garage
Sheet . 3.2
List the roof pitches
being used
22.5 degrees on main roof areas
2 degrees on garage
job no:33837
sheet:3.2
Identify Sectional Detail
Plan. Name three (3)
items of information that
would be shown on a
section detail of a
concrete footing and
floor slab” detail of
concrete footing and
floor slab
vapor barrier
Backfill
various sizes of reinforcement mesh
job no :33837
sheet :9.3
What are the window
areas for windows W16,
W2 and W14?
W16:1200mmHx850mmW
W2:2057mmHx1810mmW
W14:1029mmHx1810mmW
Job No:33837
Sheet : 6.1
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 3 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and
Sheet (Drawing)
Number where
the item is
detailed
What material is the
frame for window W12
made from?
Aluminium
Job No:33837
Sheet : 6.1
What is the glass type
for window W12?
Safety glass
Job No:33837
Sheet : 6.1
State the name or title of
the detail for the damp
proof course
Section D
Job No:33837
Sheet:9.3
What is the plasterboard
thickness around the
stairwell?
10mm
Job No:33837
Sheet:9.3
What is the width of the
A.J’s (articulation joints)?
15mm double story
Job No:500856
Sheet 4
Name the 3 (three)
external wall claddings
Pre primed Shadowclad
brickwork
Rendered Brickwork
job no : 33837
sheet no :3.2
What is the height of the
boundary fence?
1.8m
Job No:33837
Sheet No: 1.1
What are the sizes of the
storm water pipes?
90mm
100mm under garage and future driveways
Job No:33837
Sheet No: 1.1
What material is used for
the storm water pipes?
Heavy duty pvc
Job No:33837
Sheet No: 1.1
What is the finish floor
level of the house?
FFL 42.635
Job No:33837
Sheet No: 1.1
What is the finish floor
level of the garage?
FFL 42.5
Job No:33837
Sheet No: 1.1
How many bored piers
are included on the
plan?
3
job no : 50085
sheet no: 1
There are 6 (six) bulk
heads identified on the
plan, where are they
located?
Bedroom1-wir
Bedroom 1 ensuite
Above kitchen
job no: 33837
sheet numbers :
2.1 /2.2
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 4 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1
Question
Answer
Job Number and
Sheet (Drawing)
Number where
the item is
detailed
Fridge space
Entry to theatre room
Entry to family room
There are 6 (six) bulk
heads identified on the
plan, what are their
dimensions?
smoke detectors,downlights and ducted heating points all
use symbols to show their location
job no: 33837
sheet numbers :
2.1 /2.2
Provide 3 examples of
symbols and 3 examples
of abbreviations from
the drawings.
Dp= downpipe
FFL= finished floor level
H’t = height
job no :33837
sheet
number:4.2
Identify 3 major spaces
off the floor plan and
provide dimensions
rumpus room = 5590mmx5310mm
main area of bedroom 1 =4200mmx4670mm
Loungeroom = 4910x4200mm
job no: 33837
sheet no: 2.1 /
2.2
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 5 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1
Part B
© House of Learning Pty Ltd
M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 |
Page 6 of 21
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
What are the practical constraint?
arrow_forward
Quality Engineering question
A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain.
Please answer in your own words. please don't use handwriting. Thank you
arrow_forward
Write short notes on any two of the following:
PPRA
a)
b) DPR
arrow_forward
One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.
arrow_forward
ESSAY
Instruction: Answer the essay questions. Write your answers in a short bond paper (8.5
in. by 11 in.). Use the attached format in this module.
1. What are the different professional responsibilities of a Civil Engineer?
2. Why do we need to know the obligations and liabilities of both the Civil Engineer
and the Client?
3. When do the engineering services get suspended or terminated?
4. How should a dispute between the Civil Engineer and the Client be settled?
5. What are the typical services offered by Civil Engineers or civil engineering firms?
6. How is a Civil Engineer selected for a particular service or project?
7. What are the requirements for foreign civil engineers to practice their profession in
the Philippines?
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
2 / 2
100%
+
☑
ف
Copyright © Prof. S. Ahmad (2024), University at Buffalo EAS209 Instructor. Copyrighted course materials shall not be further disseminated
without instructor permission. This includes sharing content to commercial course material suppliers such as Course Hero, Chegg, etc.
Q.2) A 50 Kg crate is resting on top of a 40 Kg crate as shown in figure below. The
top crate is attached to a wall by a cord, and a rope attached to the bottom crate
passes around two fixed pegs. The coefficient of friction between the two crates
is 0.3; between the crate and the floor is 0.4; and between the rope and the pegs
is 0.25. Determine the minimum force Pmin needed to cause move the bottom
crate.
50 Kg
40 Kg
arrow_forward
The introduction section of a proposal includes:
Select one:
o a. Report organization
b. All points mentioned
c. Statement of the problem
d. The background
arrow_forward
Given ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences.
For strict compliance.
Thank you!
arrow_forward
One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineering
arrow_forward
Edit
1.
2.
9:22 St
Instructions: In preparation for our first completion exam, solve this problem set. Write your solution on
bond paper with a border line and a 1 inch margin on all sides. Follow the format of the sample problem set.
Use engineering lettering and include FBD with a complete and proper label. Our first exam will be held on
October 1, 2022, from 1:00p.m. to 4:00p.m. The exam will cover the same topic as our problem set.
STATICS OF RIGID BODIES
PROBLEM SET NO. 1
300 lb
K
Three chains act on the bracket such that they create a resultant force having a magnitude of 500 lb. If
two of the chains are subjected to known forces, as shown, determine the angle of the third chain
measured clockwise from the positive x axis, so that the magnitude of the force F in this chain is a
minimum. All forces lie in the x-y plane. What is the magnitude of F? Hint: First find the resultant of the
two known forces. Forces F acts in this direction.
200 lb
Determine the magnitude of the…
arrow_forward
Instruction:
On a separate short bond paper with 1-inch by 1-inch margin, copy and answer each
problem and box your final answer(s). All necessary solution must be included. Please
consider at least 3 decimal places for the accuracy of your answer. Everything must
be hand written and avoid too much erasures. The submission of this plate is one (1)
week after the week intended for the topic.
1. Determine the Degree of Freedom of the following Structure
3k
2k
C.
D. 12 ft
B
D
10 ft-
- 10 ft-- 10 ft-- 10 ft
Assume roller support at A and hinge at
point G.
arrow_forward
1- Provide a brief response for each of the below case studies
2-State the code of fundamental canons of ethics, rules of practice and professional obligation.
3-write a brief conclusion for each case
CASE 1
Engineer A is a recently hired software engineer recruited from college by HyTechCo, a global software company. As part of his first assignment, Engineer A’s supervisor, Engineer B, requests that he write software to provide security for e-mailed documents within HyTechCo. After completing the project, Engineer A learns on an IT industry news Web site about an individual with another company who had made similar software available to overseas clients and was being investigated by the government because of U.S. laws that require that such software not be sent overseas because of national security concerns. Engineer A learns that the software he developed for HyTechCo has been sent overseas by HyTechCo’s IT department for use by HyTechCo’s offices abroad. Engineer A informs Engineer…
arrow_forward
No plagiarism please. Answer in 4-5 sentence
How important is practicing occupational health and safety procedures in the workplace?
arrow_forward
pls answer ASAP
Why is safety management important? How will it affect the entire project construction? 10 points (Minimum of 100 words)
arrow_forward
Find and evaluate 2 (two) construction processes or technologies in your work or everyday life that have either a poor or a good design in relation to occupational safety and health or public safety and health. Present your findings considering the design aspects, the User Experience, changes you propose or the design aspects that promote good design, and other supporting information via a maximum 1-page report for each design. Pictures, checklists, and other supporting materials can be added as appendices and are unlimited.
NOTE: I NEED PICTURES AND REFERENCES TO THESE ANSWERS
arrow_forward
from book Construction Contracts Keith Collier 3rd
q1) a. Explain the statement: Documents for construction contracts are not always the same as contract documents.
b. In the light of your explanation, list all the classes of documents for contracts, identifying the contract documents.
q2) Explain the proper purpose and procedure for a “letter of intent” issued by an owner, and who should draft or give advice concerning it.
please don't slove as handwriting
arrow_forward
Answer Problem 2. Follow the same instructions above.
arrow_forward
What are the five types of information that you should determine prior to attending a meeting?
arrow_forward
List at least 4 skills/knowledge of Home Maintenance/Construction
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
1- Produce a design proposal, using computer-aided drawing tools, utilising alternative construction methods.
2- Present a design proposal that utilises alternative methods of construction.
3- Evaluate the effectiveness of using computer-aided drawing software and BIM.
4- Justify the use of a chosen alternative construction method.
arrow_forward
The three basic stages of construction planning are:
(A) Preconstruction planning, post-construction planning, and legal review
(B) Pre-conceptual planning, preconstruction planning, and construction planning
(C) Pre-conceptual planning, conceptual planning, and post-conceptual planning
(D) Pre-construction planning, construction planning, and planning review
OD
O No answer text provided.
O No answer text provided.
O No answer text provided.
Question 2
arrow_forward
Kindly please check my grammar and also my sentence outline.
Good afternoon.....
Announcement to all Youth, Altar Servers and all YIFI officers that this coming November 07(Sunday) @ 8:40 am. We will have our emergency meeting. Please cooperate because there are important agenda to be discuss. Also please bring your outline report and also to all who want to attend the said meeting please bring ballpen and paper for note taking..Thank you....
arrow_forward
Answer remaining part of the question
arrow_forward
Please explain the photo attached
Topic: STANDARD OF PROFESSIONAL PRACTICE (SPP) ON CONSTRUCTION MANAGEMENT SERVICES
arrow_forward
Can a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- What are the practical constraint?arrow_forwardQuality Engineering question A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain. Please answer in your own words. please don't use handwriting. Thank youarrow_forwardWrite short notes on any two of the following: PPRA a) b) DPRarrow_forward
- One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.arrow_forwardESSAY Instruction: Answer the essay questions. Write your answers in a short bond paper (8.5 in. by 11 in.). Use the attached format in this module. 1. What are the different professional responsibilities of a Civil Engineer? 2. Why do we need to know the obligations and liabilities of both the Civil Engineer and the Client? 3. When do the engineering services get suspended or terminated? 4. How should a dispute between the Civil Engineer and the Client be settled? 5. What are the typical services offered by Civil Engineers or civil engineering firms? 6. How is a Civil Engineer selected for a particular service or project? 7. What are the requirements for foreign civil engineers to practice their profession in the Philippines?arrow_forwardOSHA Subject ( give sample answer ) 5 linesarrow_forward
- 2 / 2 100% + ☑ ف Copyright © Prof. S. Ahmad (2024), University at Buffalo EAS209 Instructor. Copyrighted course materials shall not be further disseminated without instructor permission. This includes sharing content to commercial course material suppliers such as Course Hero, Chegg, etc. Q.2) A 50 Kg crate is resting on top of a 40 Kg crate as shown in figure below. The top crate is attached to a wall by a cord, and a rope attached to the bottom crate passes around two fixed pegs. The coefficient of friction between the two crates is 0.3; between the crate and the floor is 0.4; and between the rope and the pegs is 0.25. Determine the minimum force Pmin needed to cause move the bottom crate. 50 Kg 40 Kgarrow_forwardThe introduction section of a proposal includes: Select one: o a. Report organization b. All points mentioned c. Statement of the problem d. The backgroundarrow_forwardGiven ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences. For strict compliance. Thank you!arrow_forward
- One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineeringarrow_forwardEdit 1. 2. 9:22 St Instructions: In preparation for our first completion exam, solve this problem set. Write your solution on bond paper with a border line and a 1 inch margin on all sides. Follow the format of the sample problem set. Use engineering lettering and include FBD with a complete and proper label. Our first exam will be held on October 1, 2022, from 1:00p.m. to 4:00p.m. The exam will cover the same topic as our problem set. STATICS OF RIGID BODIES PROBLEM SET NO. 1 300 lb K Three chains act on the bracket such that they create a resultant force having a magnitude of 500 lb. If two of the chains are subjected to known forces, as shown, determine the angle of the third chain measured clockwise from the positive x axis, so that the magnitude of the force F in this chain is a minimum. All forces lie in the x-y plane. What is the magnitude of F? Hint: First find the resultant of the two known forces. Forces F acts in this direction. 200 lb Determine the magnitude of the…arrow_forwardInstruction: On a separate short bond paper with 1-inch by 1-inch margin, copy and answer each problem and box your final answer(s). All necessary solution must be included. Please consider at least 3 decimal places for the accuracy of your answer. Everything must be hand written and avoid too much erasures. The submission of this plate is one (1) week after the week intended for the topic. 1. Determine the Degree of Freedom of the following Structure 3k 2k C. D. 12 ft B D 10 ft- - 10 ft-- 10 ft-- 10 ft Assume roller support at A and hinge at point G.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning