CPC40120/CPC50220 Module 1 Assessment 2.1 Assessment Cover Sheet The Cover Sheet must be completed before you start your assessment. Student Surname Student Given Name Qualification CPCC40120/CPC50220 CertIV/Diploma of Building and Construction (Building) Module of Study Module 1 Assessment Name Module 1 Activity 2.1- Plans Trainer Name Student Statement Plagiarism is a form of cheating. It is taking and using someone else’s thoughts or writings and representing them as your own. Plagiarism is a serious act and may result in a participant’s exclusion from a Unit of Competency or a course. This in turn may require for students to pay to re-complete the module or course at a later date. The following list outlines some of the activities for which a participant can be accused of plagiarism: 1. Presenting any work by another individual as one’s own unintentionally 2. Handing in assessments markedly similar to or copied from another student 3. Presenting the work of another individual or group as their own work. 4. Handing up assessments without the adequate acknowledgement of sources used, including assessments taken totally or in part from the internet. Many of the workbook activities are ‘open book’ yet should still be conducted under test conditions without consultation with other students. If you are unsure of any assessment requirements you should check with your Trainer / Assessor. By submitting this assessment electronically you declare that all work for assessment tasks submitted for this assessment is your own with no part of any assessment being copied/plagiarised from another person’s work, except where authorised and listed / referenced. © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 1 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1 Scenario - Leary Avenue, East Bentleigh You will need to refer to this scenario for Activity 2.1 – Plans and Activity 2.2 – Variations and client communications. John and Joan Smith have engaged your services for the construction of their house, a two storey dwelling on Leary Avenue in East Bentleigh. The contract documents have been signed and the site plans have been produced externally by a surveyor. For this scenario, you will need to refer to the following documentation: PN33837 Leary Ave Plan Pack V2.0 PN33837 Leary Ave Project Documentation V2.0 Activity 2.1- Plans - Answer sheet V1.0 Prior to commencement of the project, you are required to review the project documentation and the plan pack in order to ensure that you understand the documents before starting the construction process. To complete the build, you are aware that you will need to contract different labourers to assist you with the various stages of construction. You are to work through the following tasks as part of the planning phase for this construction project. Part A Question Answer Job Number and Sheet (Drawing) Number where the item is detailed State the location of the site Lot 6 No 4 Leary Avenue Melbourne Job No:33837 Sheet No: 1.1 Identify the title block on 3 plans and confirm the version numbers are current, Site Plan Ground floor plan First floor plan Job No.33837 Identify which side of the building faces true north Front of the building Job No:33837 Sheet No: 1.1 Detail all the setbacks of the property 4500mm from front of building to North boundary 3000mm from back of building to south boundary 2000mm to the east side of building and 4000mm to the west Job No:33837 Sheet No: 1.1 HWS appears on 5 (five) plans. List the five plans Site Plan Ground Floor Plan Elevations 1 Plan Electrical Ground floor Plan Job No:33837 Sheet No:1.1 Sheet No: 2.1 Sheet No:3.1 © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 2 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1 Question Answer Job Number and Sheet (Drawing) Number where the item is detailed Slab Plan Articulation Layout Sheet No:4.1 Sheet No:5.1 Job No:50085 Sheet No:5 of 7 How many smoke detectors are planned? 3 2.1 Referencing the BCA Volume II, are the respective locations of smoke detectors appropriate? (state the reference page and clause of BCA) Yes. Part 3.7. 5 specifies different smoke alarm requirements for Class 1a and Class 1b buildings Job No:50085 Sheet No. 4.1,4.2 Where is the LPD (legal point of discharge) located? The Lpd is located on the North West corner of the garage running north Job No:50085 Sheet No:6 of 7 What is the fall of land along the west side of the property? How many downpipes are there (including spreaders)? 6 job no: 33837 sheet no : List the types of roof cladding being used Concrete roof tiles on main roof areas ‘klip lock zinc’ on garage Sheet . 3.2 List the roof pitches being used 22.5 degrees on main roof areas 2 degrees on garage job no:33837 sheet:3.2 Identify Sectional Detail Plan. Name three (3) items of information that would be shown on a section detail of a concrete footing and floor slab” detail of concrete footing and floor slab vapor barrier Backfill various sizes of reinforcement mesh job no :33837 sheet :9.3 What are the window areas for windows W16, W2 and W14? W16:1200mmHx850mmW W2:2057mmHx1810mmW W14:1029mmHx1810mmW Job No:33837 Sheet : 6.1 © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 3 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1 Question Answer Job Number and Sheet (Drawing) Number where the item is detailed What material is the frame for window W12 made from? Aluminium Job No:33837 Sheet : 6.1 What is the glass type for window W12? Safety glass Job No:33837 Sheet : 6.1 State the name or title of the detail for the damp proof course Section D Job No:33837 Sheet:9.3 What is the plasterboard thickness around the stairwell? 10mm Job No:33837 Sheet:9.3 What is the width of the A.J’s (articulation joints)? 15mm double story Job No:500856 Sheet 4 Name the 3 (three) external wall claddings Pre primed Shadowclad brickwork Rendered Brickwork job no : 33837 sheet no :3.2 What is the height of the boundary fence? 1.8m Job No:33837 Sheet No: 1.1 What are the sizes of the storm water pipes? 90mm 100mm under garage and future driveways Job No:33837 Sheet No: 1.1 What material is used for the storm water pipes? Heavy duty pvc Job No:33837 Sheet No: 1.1 What is the finish floor level of the house? FFL 42.635 Job No:33837 Sheet No: 1.1 What is the finish floor level of the garage? FFL 42.5 Job No:33837 Sheet No: 1.1 How many bored piers are included on the plan? 3 job no : 50085 sheet no: 1 There are 6 (six) bulk heads identified on the plan, where are they located? Bedroom1-wir Bedroom 1 ensuite Above kitchen job no: 33837 sheet numbers : 2.1 /2.2 © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 4 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1 Question Answer Job Number and Sheet (Drawing) Number where the item is detailed Fridge space Entry to theatre room Entry to family room There are 6 (six) bulk heads identified on the plan, what are their dimensions? smoke detectors,downlights and ducted heating points all use symbols to show their location job no: 33837 sheet numbers : 2.1 /2.2 Provide 3 examples of symbols and 3 examples of abbreviations from the drawings. Dp= downpipe FFL= finished floor level H’t = height job no :33837 sheet number:4.2 Identify 3 major spaces off the floor plan and provide dimensions rumpus room = 5590mmx5310mm main area of bedroom 1 =4200mmx4670mm Loungeroom = 4910x4200mm job no: 33837 sheet no: 2.1 / 2.2 © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 5 of 21
CPC40120/CPC50220 Module 1 Assessment 2.1 Part B © House of Learning Pty Ltd M1 – Activity 2.1 – Plans – Answer Sheet – V1.0| 08.07.2021 | Page 6 of 21