SMS
.docx
keyboard_arrow_up
School
Seneca College *
*We aren’t endorsed by this school
Course
315
Subject
Computer Science
Date
Jun 21, 2024
Type
docx
Pages
3
Uploaded by CoachFreedomWolverine30
SMS 416 Question 1
Assume that, for the same price
The power of the CPU will double every 18 months,
The power of disk will double every 12 months,
The power of the network connectivity will double every 9 months and
The power of the software will double every 6 months
Also assume that the computer power increase is measured by the product of the increase of these four factors. Calculate the growth of the computing power after 6 years.
Step 1: Converting months to years
CPU – Doubles every 18 months or every 1.5 years
Disk – Doubles every 12 months or every 1 years
Network Connectivity – Doubles every 9 months or every 0.75 years
Software – Doubles every 6 months or every 0.5 years
Step 2: Annual Growth Rate
CPU – 2^(1/1.5) = 1.587
Disk – 2^(1/1) = 2
Network Connectivity – 2^(1/0.75) = 2.520
Software – 2^(1/0.5) = 4
Step 3: Calculating the growth in 6 years (1 dollar initial value)
CPU – (1.587^6)*1 = 16
Disk – (2^6)*1= 64
Network Connectivity – (2.52^6)*1 = 256
Software – (4^6)*1 = 4096
Step 4: Combined Growth
16*64*256*4096 = 1,073,741,824
Question 2 Identify which type of data analytics each of the following applications belongs to. The four types of analytics are:
1.
Diagnostic analytics
2.
Descriptive Analytics
3.
Predictive Analytics
4.
Prescriptive Analytics
Application
Sales Forecasting – Predictive Analytics
Analyzing the reasons why the wars in the Middle East and Ukraine are happening concurrently – Diagnostic Analytics
Website traffic analysis and heat maps – Descriptive Analytics
Analyzing the actions to be taken to stop bad behavior of employees in a company – Prescriptive Analytics
Question 3
In the above diagram of a simple feed-forward neural network, assume that every node is implemented using a simple “perceptron” without any looping mechanisms (like the one we discussed in the class).
If the training of this network is to be done by solving a non-linear multi-
variate regression model with five inputs and four outputs, how many variables would need to be determined in the model to solve the regression problem (train the neural network)? Please show your calculations. 5*7 + 7*7 + 7*4 = 112
7+7+4 = 21
112+21 = 133
Question 4 Netflix – one sided network effects
, as more users joined the platform, the
company could buy more content
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Suppose two mobile phone companies sale their internet packages as 256KB connection
for Rs.1500 per month, 512KB connection for Rs. 1900 per month, 1MB connection for
Rs. 2800 per month and 4MB connection for Rs. 3800 per month.
The table below summarizes the number of connections both companies have sold per
month
512KB
1MB
4MB
256 KB
175
Company A
Company B
60
22
8.
250
180
65
23
What is total annual revenue of Company A?
What is total quarterly reveue of Company B?
arrow_forward
i need solution of Part 1 2 and 3
arrow_forward
The Pentium 4 Prescott processor, released in 2004, had a clock rate of 3.6 GHz and voltage of 1.25 V. Assume that, on average, it consumed 10 W of static power and 90 W of dynamic power.
If the total dissipated power is to be reduced by 10%, how much should the voltage be reduced to maintain the same leakage current? Note: power is defined as the product of voltage and current
arrow_forward
An assembly line with 30 activities is to be balanced. The total amount of time to complete all 30 activities is 60 minutes. The longest activity takes 2.4 minutes and the shortest takes .3 minutes. The line will operate for 480 minutes per day.
What are the maximum and minimum cycle times? (using the cycle time formula)
How much daily output will be achieved by each of those cycle times?
arrow_forward
An operating system uses the banker's algorithm for deadlock avoidance when managing the
allocation of three resource types X, Y and Z to three processes P0, P1 and P2. The table
given below presents the current system state. Here, the Allocation matrix shows the current
number of resources of each type allocated to each process and the Max matrix shows the
maximum number of resources of each type required by each process during its execution
Allocation
Маx
X
Y
X
Y
PO
1
8
3
P1
3
2
6
2
P2
1
3
3
3
There are 3 units of type X, 2 units of type Y and 2 units of type Z still available. The system is
currently in safe state. Consider the following independent requests for additional resources in
the current state-
REQ1: PO requests 0 units of X, 0 units of Y and 2 units of Z
REQ2: P1 requests 2 units of X, 0 units of Y and 0 units of Z
Write a program to check whether:
Only REQ1 can be permitted
Only REQ2 can be permitted
Both REQ1 and REQ2 can be permitted
Neither REQ1 nor REQ2 can be…
arrow_forward
4 Processes (P1,P2,P3,P4) arrived at time 0. The Duration of the processes are (6,8,4,2). All processes have a common X% wait time.The first process finishes at around 10.00.
What is the common wait percentage for the processes (X).
IVO Wait Time
80%
30%
60%
Processes
CPU Utilization
1
0.2
0.70
0.4
2
0.35
0.90
0.55
0.5
0.95
0.70
4
0.7
0.98
0.80
Select one:
O a. Less than 30%
O b. 30%
O c. 60% v
O d. More than 80%
O e. 80%
O f. None of the mentioned
arrow_forward
A personnel director wishes to compare the effectiveness of two methods of train-
ing industrial employees to perform a certain assembly operation. Employees are to
be divided into two equal groups: the first receiving training method 1 and the sec-
ond training method 2. Each will perform the assembly operation, and the length of
assembly time will be recorded. It is expected that the assembly times for both groups
will have a range of approximately 8 minutes. For the estimate of the
difference in mean times to assemble to be correct to within minute with a
probability equal to .95, how many workers must be included in each training group?
16c3d
JPG Fi
DO
arrow_forward
How do I answer this, please?
Acme Parts runs a small factory and employs workers who are paid one of three hourly rates depending on their shift: first shift, $17 per hour; second shift, $18.50 per hour; third shift, $22 per hour. Each factory worker might work any number of hours per week; any hours greater than 40 are paid at one and one-half times the usual rate. In addition, second- and third-shift workers can elect to participate in the retirement plan for which 3% of the worker’s gross pay is deducted from the paychecks.
Write a program that prompts the user for hours worked, shift, and, if the shift is 2 or 3, whether the worker elects the retirement (1 for yes, 2 for no). Display:
Hours worked
Shift
Hourly pay rate
Regular pay
Overtime pay
Total of regular and overtime pay
Retirement deduction, if any
Net pay.
arrow_forward
q5
arrow_forward
Maps
Remaining Time: 58 minutes, 28 seconds.
Question Completion Status:
QUESTION 11
Rs
120 2
Vs
20 V
RL
The source in Figure 2 has an internal resistance of 120 Ohm. Determine the load power for each of the following values of the variable load
resistance
(a) 00
O a. 330 mW
O b.0 mW
O c. 450 mW
O d. 500 mW
arrow_forward
Question 15
Match the laser printing process step number with related term:
Sweeping blade
1
2
3₂2
4
5
6
7
Cleaning
Fusing roller cleaner
Primary
charging roller
Fusing
assemb
Fusing
Charging
Stade charge c
Exposing
Developing
Developing cylinder
Transfer
charging roller
Processing
Transferring
✓ [Choose ]
Negative static charge
laser
positive static charge
PCL
magnet
hot
leftover toner
[Choose]
[Choose]
[Choose]
[Choose ]
arrow_forward
A computer manufacturing company is trying to decide whether to purchase specialized assembly equipment todayor to wait 6 years from now, when the equipment will be first needed.If you were to purchase the equipment today it would cost: $704,0006 years from now the equipment would cost: $1,000,962The bank is paying 6.00% interest per year, compounded monthly.Should you buy the equipment now or wait 6 years to buy the equipment?
arrow_forward
An operating system uses the banker's algorithm for deadlock avoidance when managing the
allocation of three resource types X, Y and Z to three processes P0, P1 and P2. The table given
below presents the current system state. Here, the Allocation matrix shows the current number of
resources of each type allocated to each process and the Max matrix shows the maximum number
of resources of each type required by each process during its execution
Allocation
Маx
Y
Y
PO
8
4
3
P1
3
2
6
2
P2
2
1
3
3
3
There are 3 units of type X, 2 units of type Y and 2 units of type Z still available. The system is
currently in safe state. Consider the following independent requests for additional resources in
the current state-
REQ1: P0 requests 0 units of X, 0 units of Y and 2 units of Z
REQ2: P1 requests 2 units of X, 0 units of Y and 0 units of Z
Write a program to check whether:
A. Only REQ1 can be permitted
B. Only REQ2 can be permitted
C. Both REQ1 and REQ2 can be permitted
D. Neither REQ1 nor REQ2 can…
arrow_forward
The I.T. department of a medium-sized consulting firm requires an inventory system.This system would allow them to individually track every piece of computer.equipment used by the company. This includes computers, monitors, printers, etc.This is especially important given that the company has several offices locatedacross world.
The system should keep track of the following characteristics of equipment:
• Its type (such as Computer, Monitor, Printer)
• Its serial number (such as N3JEKW357EA)
Its model number
Information about its purchase (such as date, store, warranty expiration)Who is currently assigned to this piece of equipment
Its location (such as Montreal Office, Toronto Office).• Every piece of Computer equipment has uniquely identifies with special
barcode sticker (a piece of equipment can only be assigned to one employee
at a time.)The system also keeps track of employees. The record has been followinginformation:
Name of the employee, gender. Title, department, supervisor.…
arrow_forward
The I.T. department of a medium-sized consulting firm requires an inventory system.This system would allow them to individually track every piece of computer.equipment used by the company. This includes computers, monitors, printers, etc.This is especially important given that the company has several offices locatedacross world.
The system should keep track of the following characteristics of equipment:
• Its type (such as Computer, Monitor, Printer)
• Its serial number (such as N3JEKW357EA)
Its model number
Information about its purchase (such as date, store, warranty expiration)Who is currently assigned to this piece of equipment
Its location (such as Montreal Office, Toronto Office).• Every piece of Computer equipment has uniquely identifies with special
barcode sticker (a piece of equipment can only be assigned to one employee
at a time.)The system also keeps track of employees. The record has been followinginformation:
Name of the employee, gender. Title, department, supervisor.…
arrow_forward
An operating system uses the banker's algorithm for deadlock avoidance when managing the
allocation of three resource types X, Y and Z to three processes P0O, P1 and P2. The table given
below presents the current system state. Here, the Allocation matrix shows the current number of
resources of each type allocated to each process and the Max matrix shows the maximum
number of resources of each type required by each process during its execution
Allocation
Max
Y
X
Y
PO
8
4
3
P1
3
6
P2
2
1
1
3
3
3
There are 3 units of type X, 2 units of type Y and 2 units of type Z still available. The system is
currently in safe state. Consider the following independent requests for additional resources in
the current state-
REQ1: PO requests 0 units of X, 0 units of Y and 2 units of Z
REQ2: P1 requests 2 units of X, 0 units of Y and 0 units of Z
Write a program to check whether:
A. Only REQ1 can be permitted
B. Only REQ2 can be permitted
C. Both REQ1 and REQ2 can be permitted
D. Neither REQ1 nor REQ2…
arrow_forward
An operating system uses the banker’s algorithm for deadlock avoidance when managing the allocation of three resource types X, Y and Z to three processes P0, P1 and P2. The table given below presents the current system state. Here, the Allocation matrix shows the current number of resources of each type allocated to each process and the Max matrix shows the maximum number of resources of each type required by each process during its execution
There are 3 units of type X, 2 units of type Y and 2 units of type Z still available. The system is currently in safe state. Consider the following independent requests for additional resources in the current state-
REQ1: P0 requests 0 units of X, 0 units of Y and 2 units of Z
REQ2: P1 requests 2 units of X, 0 units of Y and 0 units of Z
Write a program to check whether:
Only REQ1 can be permitted
Only REQ2 can be permitted
Both REQ1 and REQ2 can be permitted
Neither REQ1 nor REQ2 can be permitted
arrow_forward
he pulp and paper factory is one of the longest industrial sectors in the world. Thus, international paper company wants to increase their output. Based on its product, the thickness of 500 sheet of papers is 2.027558055 inch. Without decreasing its quality according to scientific experiments they had done, they decided to use rounding off formula from 9 decimal places to 6 decimal places based on thickness of the paper. Discuss the above study in view of absolute and relative errors. If you are quality control manager of the factory, what is your BEST action towards production line with above decision. Justify your answer
arrow_forward
This is the question. I am unsure how to begin on -
Acme Parts runs a small factory and employs workers who are paid one of three hourly rates depending on their shift: first shift, $17 per hour; second shift, $18.50 per hour; third shift, $22 per hour. Each factory worker might work any number of hours per week; any hours greater than 40 are paid at one and one-half times the usual rate. In addition, second- and third-shift workers can elect to participate in the retirement plan for which 3% of the worker’s gross pay is deducted from the paychecks.
Write a program that prompts the user for hours worked, shift, and, if the shift is 2 or 3, whether the worker elects the retirement (1 for yes, 2 for no). Display:
Hours worked
Shift
Hourly pay rate
Regular pay
Overtime pay
Total of regular and overtime pay
Retirement deduction, if any
Net pay.
This is the way the code starts -
import java.util.*;
public class AcmePay {
public static void main(String[] args) throws Exception {…
arrow_forward
Question 1: pertains to the Cherokee School District scenario below. The school board for the Cherokee School District has made the decision to purchase 1370additional Macintosh computers for computer laboratories in all its schools. Based on the past experience, the school board has directed that these computers should be purchased from some combination of three companies Mc Comp, EduElectronics, and Macwin. In all three cases, the companies charge a discounted variable cost per computer and a fixed delivery and installation costs for these large sales to school districts. The table below shows these charges as well as the capacity (the maximum number of computers that can be sold from the limited inventory) for each of the companies.CapacityFixed cost variable costMcComp710 $45,000 $750 EduElectronics690$35,000$780
Macwin1000$50,000 $700
The school board wants to know the optimal plan for meeting its computer needs.
1.Identify the type of integer programming framework (Total Integer,…
arrow_forward
Please follow the instruction
arrow_forward
The table below shows the arrival times and service (or burst) times of Processes A, B, C, D, E, F, and G.
PROCESS
ARRIVAL TIMES
SERVICE (or BURST) TIMES
A
0
5
B
4
8
C
7
4
D
9
5
E
12
7
F
14
9
G
17
5
Use First Come First Served algorithm to determine:
(i). the finish times of each of the processes
(ii). the turnaround times of each of the processes
(iii). the normalized turnaround times of each of the processes
(iv). the mean turnaround time of all the processes
(v). the mean normalized turnaround time of all the processes.
arrow_forward
Subject: Engineering of Materials
Class: Second (Morning)
Ministry of Higher Education and
Scientific Research
Southern Technical University
Time: An hour and a half
Engineering Technical College/Basrah
Date: 6/2/2022
Dep. Of Thermal Mechanical Eng.
First semester exam (2020-2021)
120
Q1:A/ Answer the questions for the figure below:
1-Re-arrange the curves (A,B and C) from the
maximum to minimum according to (Young's
modulus, Tensile Strength and Ductility).
2- What does represent the area under curve A?
derive the mathematical relation of it.
3- How can find the modulus of elasticity of curve C.
4- Discuss the effect of temperature on (stiffness
ductility, Toughness and point of fracture).
5- Determine the true stress at fracture if the
engineering fracture strength of 460 MPa, (d. = 12.8
mm, d 10.7mm)
Q2:A/ chose lor 2
1- Show that the Atomic packing factor for FCC is 0.74.
2- Determine Quantum numbers for each electron when n= 2
B/1- Within a cubic unit cell, sketch the following:…
arrow_forward
Assuming that there are 5 processes (P1, P2, P3, P4 and P5) which are processed by a CPU.The processes need 3 resources (A, B and C). The following information shows the current resources allocated to each process and also the maximum resources they required in order to complete their processes. Given that the available resources are 4, 2, 2 respectively.
Processes Allocated Resources Maximum Resources Required A B C A B C
P1 2 1 2 5 3 2P2 3 2 3 6 5 4P3 1 3 4 6 6 6P4 7 8 8 10 18 16P5 6 7 5…
arrow_forward
Question 34
Frontline Agricultural Processing Systems uses several ingredients to make wheat
crackers. After several years of operations and testing, their scientists found high
protein and carbohydrates in two of their ingredients, barley and corn. While an
ounce of barley costs $0.25, an ounce of corn costs $0.46. While an ounce of barley
provides 9 mg of protein and 1 mg of carbohydrates, an ounce of corn provides 7 mg
of protein and 5 mg of carbohydrates. Recently, demand for wheat crackers has
increased. To lower the overall cost of producing wheat crackers, Frontline
Agricultural Processing Systems will want to know how many ounces of barley and
corn to include in each box of wheat crackers to meet the minimum requirements of
160 milligrams of protein and 40 milligrams of carbohydrates.
If the carbohydrate requirement is reduced by 2 milligrams, how much reduction
would the optimal cost change by? Round to 2 decimal places.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Operations Research : Applications and Algorithms
Computer Science
ISBN:9780534380588
Author:Wayne L. Winston
Publisher:Brooks Cole
Related Questions
- Suppose two mobile phone companies sale their internet packages as 256KB connection for Rs.1500 per month, 512KB connection for Rs. 1900 per month, 1MB connection for Rs. 2800 per month and 4MB connection for Rs. 3800 per month. The table below summarizes the number of connections both companies have sold per month 512KB 1MB 4MB 256 KB 175 Company A Company B 60 22 8. 250 180 65 23 What is total annual revenue of Company A? What is total quarterly reveue of Company B?arrow_forwardi need solution of Part 1 2 and 3arrow_forwardThe Pentium 4 Prescott processor, released in 2004, had a clock rate of 3.6 GHz and voltage of 1.25 V. Assume that, on average, it consumed 10 W of static power and 90 W of dynamic power. If the total dissipated power is to be reduced by 10%, how much should the voltage be reduced to maintain the same leakage current? Note: power is defined as the product of voltage and currentarrow_forward
- An assembly line with 30 activities is to be balanced. The total amount of time to complete all 30 activities is 60 minutes. The longest activity takes 2.4 minutes and the shortest takes .3 minutes. The line will operate for 480 minutes per day. What are the maximum and minimum cycle times? (using the cycle time formula) How much daily output will be achieved by each of those cycle times?arrow_forwardAn operating system uses the banker's algorithm for deadlock avoidance when managing the allocation of three resource types X, Y and Z to three processes P0, P1 and P2. The table given below presents the current system state. Here, the Allocation matrix shows the current number of resources of each type allocated to each process and the Max matrix shows the maximum number of resources of each type required by each process during its execution Allocation Маx X Y X Y PO 1 8 3 P1 3 2 6 2 P2 1 3 3 3 There are 3 units of type X, 2 units of type Y and 2 units of type Z still available. The system is currently in safe state. Consider the following independent requests for additional resources in the current state- REQ1: PO requests 0 units of X, 0 units of Y and 2 units of Z REQ2: P1 requests 2 units of X, 0 units of Y and 0 units of Z Write a program to check whether: Only REQ1 can be permitted Only REQ2 can be permitted Both REQ1 and REQ2 can be permitted Neither REQ1 nor REQ2 can be…arrow_forward4 Processes (P1,P2,P3,P4) arrived at time 0. The Duration of the processes are (6,8,4,2). All processes have a common X% wait time.The first process finishes at around 10.00. What is the common wait percentage for the processes (X). IVO Wait Time 80% 30% 60% Processes CPU Utilization 1 0.2 0.70 0.4 2 0.35 0.90 0.55 0.5 0.95 0.70 4 0.7 0.98 0.80 Select one: O a. Less than 30% O b. 30% O c. 60% v O d. More than 80% O e. 80% O f. None of the mentionedarrow_forward
- A personnel director wishes to compare the effectiveness of two methods of train- ing industrial employees to perform a certain assembly operation. Employees are to be divided into two equal groups: the first receiving training method 1 and the sec- ond training method 2. Each will perform the assembly operation, and the length of assembly time will be recorded. It is expected that the assembly times for both groups will have a range of approximately 8 minutes. For the estimate of the difference in mean times to assemble to be correct to within minute with a probability equal to .95, how many workers must be included in each training group? 16c3d JPG Fi DOarrow_forwardHow do I answer this, please? Acme Parts runs a small factory and employs workers who are paid one of three hourly rates depending on their shift: first shift, $17 per hour; second shift, $18.50 per hour; third shift, $22 per hour. Each factory worker might work any number of hours per week; any hours greater than 40 are paid at one and one-half times the usual rate. In addition, second- and third-shift workers can elect to participate in the retirement plan for which 3% of the worker’s gross pay is deducted from the paychecks. Write a program that prompts the user for hours worked, shift, and, if the shift is 2 or 3, whether the worker elects the retirement (1 for yes, 2 for no). Display: Hours worked Shift Hourly pay rate Regular pay Overtime pay Total of regular and overtime pay Retirement deduction, if any Net pay.arrow_forwardq5arrow_forward
- Maps Remaining Time: 58 minutes, 28 seconds. Question Completion Status: QUESTION 11 Rs 120 2 Vs 20 V RL The source in Figure 2 has an internal resistance of 120 Ohm. Determine the load power for each of the following values of the variable load resistance (a) 00 O a. 330 mW O b.0 mW O c. 450 mW O d. 500 mWarrow_forwardQuestion 15 Match the laser printing process step number with related term: Sweeping blade 1 2 3₂2 4 5 6 7 Cleaning Fusing roller cleaner Primary charging roller Fusing assemb Fusing Charging Stade charge c Exposing Developing Developing cylinder Transfer charging roller Processing Transferring ✓ [Choose ] Negative static charge laser positive static charge PCL magnet hot leftover toner [Choose] [Choose] [Choose] [Choose ]arrow_forwardA computer manufacturing company is trying to decide whether to purchase specialized assembly equipment todayor to wait 6 years from now, when the equipment will be first needed.If you were to purchase the equipment today it would cost: $704,0006 years from now the equipment would cost: $1,000,962The bank is paying 6.00% interest per year, compounded monthly.Should you buy the equipment now or wait 6 years to buy the equipment?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Operations Research : Applications and AlgorithmsComputer ScienceISBN:9780534380588Author:Wayne L. WinstonPublisher:Brooks Cole
Operations Research : Applications and Algorithms
Computer Science
ISBN:9780534380588
Author:Wayne L. Winston
Publisher:Brooks Cole