Topic 4 Quick Check - Introduction to Purchasing — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750142772682753/
1/4
Points: 15
Submission Score
15 / 15 (100.00%)
Submit Time
Feb 23 at 20:06
Grade Time
Feb 23 at 20:06
Graded on Feb 23 at 19:46
Submission #1:
Graded on Feb 23 at 19:55
Submission #2:
Graded on Feb 23 at 20:06
Submission #3:
1
25%
60%
40%
55%
1 / 1 (100.0%)
2
Source
Plan
Make
Deliver
1 / 1 (100.0%)
3/6/24, 12:28 PM
Topic 4 Quick Check - Introduction to Purchasing — OPS/330T: Strategic Operations and Logistics - 2023
https://app.myeducator.com/course/activity.lti/1773c/3117750142772682753/
2/4
3
Critical
Easy
Obvious
Non-critical
2 / 2 (100.0%)
4
There are unique, value-added suppliers
You spend enough money to generate supplier competition for your business
You want to have a minimum number of suppliers possible in order to increase
loyalty
There is high risk
2 / 2 (100.0%)
5
Is not a purchasing responsibility
Is also called Procure-2-Pay
Is a highly manual process
May build in extended payment terms that the supplier loves
1 / 1 (100.0%)
6
Inviting suppliers to share their ideas for improving mature products
Inviting supplier bids very early so you can determine whether products will be
viable
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Schedule of Loads and Basic Calculation
— Create a tabulated load schedule of your home.
arrow_forward
Part 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet.
1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.
arrow_forward
The system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____
a. ±0.25
b. ±1
c. ±0
d. ±0.5
arrow_forward
Give the title proposal about renewable energy atleast 5 title Bachelor electrical engineering
arrow_forward
For the following activities, draw the network diagram and by using forward
and backward pass, determine:-
1. Project duration.
2. Critical path.
Preceding
Duration
Activity
(day)
3
Act.
A
- --
A
4
C
A
2
B
E
C
1
F
C
2
D,E
F,G
G
4
H.
3
arrow_forward
Which level(s) of measurement is(are) considered qualitative? *
Ratio and Interval
Interval and Nominal
Ordinal and Nominal
Ratio and Ordinal
arrow_forward
pdf - OneDrive
pdf - OneDrive
A pdf - OneDrive
rive
personal/a_ghali_bau_edu_lb/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fa_ghali_bau_edu_lb%2FDocuments%2FFa
1 Gmail
ch24 - OneDrive
Print Download O Copy to Version history
13- Find the Thevenin and Norton equivalent circuits between ab.
2 A
a
18 V
ЗА
10 V
14- Find Vo by superposition theorem.
of 6
2 62°F Clea
prt sc
144
40
&
arrow_forward
: A) Select the best answer from multiple choices:
1. The system ete-5 is:
a. Linear, time invariant, casual.
b. Non-linear, time invariant, non-casual.
c. Non-linear, time varying, casual.
d. Not all the above.
2. Noise can be reduced through:
a. Increasing So.
b. Increasing Si.
c. Both (a) and (b).
d. Note all the above.
arrow_forward
Question 5 & 6
arrow_forward
A Learner - Course Overview
ents.adobe.com/public/newlearner/newlearner_d31ba933.html?i_qp_user_id=10743758&accountid=84369#/course/1899185/overview?cert_id=undefined&lp... A
5/00:35
Question 5 of 10
How much cubic inch space is required inside a box for 4 #6 XHHN current carrying conductors?
OA. 8 cubic inches.
B. 10 cubic inches
OC. 20 cubic inches
OD. 12 cubic inches
O 81 20
Clear
K
▶
Multiple Choice
Submit
88°F Partly sunny
arrow_forward
Note:-
• Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism.
• Answer completely.
• You will get up vote for sure.
arrow_forward
I want a solution in less than 30 minutes
Often, the network is referred as an infinite bus when a change in input mechanical power or in field excitation to the unit does not cause an appreciable change in
a.
system frequency or terminal voltage
b.
Total production cost
c.
system frequency and terminal voltage
d.
system frequency alone
arrow_forward
i need the answer quickly
arrow_forward
What is the UPS
arrow_forward
I need the answer as soon as possible
arrow_forward
The following problems refer to grounding requirements. Give the source of yourresponses.
1. If they are present, what items are required to be bonded together to form a groundingelectrode system?
arrow_forward
What is the meaning of the acronym, XLPE?
O A. CROSS-LINED POLYETHYL EQUIPMENT
O B. CROSS-LINKED POLYETHYLENE
O C. EXTRA LOW POLYESTER EQUIPMENT
O D. EXTREMELY LINED POLYMER EXTRUSION
arrow_forward
a) Write down and prove DeMorgan's theorem. b) Remove the following complements using DeMorgan's theorems. ______________________ _________________ _____________ P+ Q + (C+D.E'). (F+G)
arrow_forward
TOPIC: Power Systems, Power Plants & IlluminationINSTRUCTIONS:- Answer in this format: Given, Illustration, Required Conversion, Solution, Final Answer.- Step-by-step solution, do not skip even simple calculations to avoid confusion.- If answered in written form, make sure it is readable.PROBLEM:A 55000-kW thermal plant of National Power Corporation delivers an annual output of 238000000 kw-hr with a peak load of 44 MW. What is the capacity factor?
49.4%
42.4%
48.2%
44.6%
arrow_forward
Fill-in the table below with the correct parameters
The given is seen at table 1.
Questions on table 2, fill in the boxes with the correct answer.
Note: look at the units on the right
arrow_forward
y Bry / Twitter
b My Questions | bartleby
->
A twitter.com/messages/797991866-1421308988897959938/media/1440915325025861636
出 ☆
G Google
O So Lit | Podcast on...
O Dos and Don'ts Can...
F 100 Canada Facts T.
P Free Cool PowerPoi.
PO Facts about Canada.
G we deliver inside ou..
O Canada Country Pr.
E Reading list
Question 1
25 Points
Show and Submit your complete solution "Using the application of Kirchhoff's Law ONLY" to the problem in the figure below:
Home
X
Maximum of 25 Points be given only if you have submitted the complete solution using the required theorem:
E Explore
A Notifications
Gra
RA = 0.202
R =0.252
R = 0.302
M Messages
R = 0.82
Profile
I EA = 24V
Es = 24V
Ec = 24V
(- More
Tweet
Calculate the Power dissipated at the Load resistor.
(A) 461 Watts
B) 62.375 Watts
C) 593 Watts
coursehero onhand
@verdgshp
D) 433 Watts
OayJAvUG (1).jpg_small
OayJAvUG.jpg_small
Show all
V Verified
V Verified
1:46 pm
23/09/2021
O Upload Docum.. Account Settin.
O Bry / Twitter - .
N
O Spotify
a…
arrow_forward
Give information regarding the Heading Indicator. >History
>Development and Timeline>Application
>How it works>Regulations
arrow_forward
TOPIC: Power Systems, Power Plants & IlluminationINSTRUCTIONS:- Answer in this format: Given, Illustration, Required Conversion, Solution, Final Answer.- Step-by-step solution, do not skip even simple calculations to avoid confusion.- If answered in written form, make sure it is readable.PROBLEM:A coal-fired Power Plant with a 3000 kW rated capacity costs $15000 per kW installed. Annual operating cost is $12M, annual maintenance cost is $8M, annual depreciation is $15M, interest on investment per year is 8%, and cost of coal is $800 per ton. If one pound of coal is needed to generate 1 kWhr, find the total annual cost to operate the plant. The plant capacity factor is 50%.
$46.45M
$43.38M
$40.28M
$42.32M
arrow_forward
Refer to the National Electrical Code® or the working drawings when necessary. Where applicable, responses should be written in complete sentences.
For problems 1 and 2, six luminaires, similar to Style E used in the Commercial Building, are to be installed in a room that is 12 ft x 18 ft (~3.7 m x ~5.5 m) with a 9 ft
(2.8 m) floor-to-ceiling height. The spacing ratio for the luminaire is 1:0.
1. The maximum distance that the luminaires can be separated and achieve uniform illuminance is
ft (
m).
For problems 2-5, two luminaires, 8 ft (2.5 m) and 4 ft (1.2 m) in length with dimensions as shown in Figure 15-7, are to be installed in tandem (end to end). The
end of the long luminaire is to be 2 ft (600 mm) from the wall.
2. The center of the outlet box should be roughed in at
ft (
m) from the wall.
3. The first support should be installed at
the wall.
ft (
m) from
4. The second support should be installed at
from the wall.
ft (
m)
5. The final support should be installed at
the wall.
ft…
arrow_forward
Draw a class diagram to capture the following situation: “Every student is enrolled in a course. Each student may be enrolled in a set of units. Some units are core units for one or more courses and some units are elective units for one or more courses."
arrow_forward
The maximum electrical trade size of intermediate conduit is
a.) 150 mm b.) 125 mm c.) 200 mm d.) 100 mm
arrow_forward
Explain the theme “ Igniting the Power and Wit in the New Normal”
arrow_forward
If there is an entire row of zero in the Routh table, the system may be marginally stable.
TRUE OR FALSE
arrow_forward
I need a correct answer not a wrong answer please do it
Question: Write the necessity of power supply and briefly describe different types of SMPS and UPS
arrow_forward
22. Determine the standard deviation of the height of trees in meters with the data values 5, 4, 8, 9, 9, 14, 6, and 12. (Round off your answer in 2 decimal places and without unit)
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C...
Mechanical Engineering
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Cengage Learning
Related Questions
- Schedule of Loads and Basic Calculation — Create a tabulated load schedule of your home.arrow_forwardPart 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. 1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.arrow_forwardThe system having ±0.5% of F.S.D if the full scale deflection is 50 units, then accuracy is _____ a. ±0.25 b. ±1 c. ±0 d. ±0.5arrow_forward
- Give the title proposal about renewable energy atleast 5 title Bachelor electrical engineeringarrow_forwardFor the following activities, draw the network diagram and by using forward and backward pass, determine:- 1. Project duration. 2. Critical path. Preceding Duration Activity (day) 3 Act. A - -- A 4 C A 2 B E C 1 F C 2 D,E F,G G 4 H. 3arrow_forwardWhich level(s) of measurement is(are) considered qualitative? * Ratio and Interval Interval and Nominal Ordinal and Nominal Ratio and Ordinalarrow_forward
- pdf - OneDrive pdf - OneDrive A pdf - OneDrive rive personal/a_ghali_bau_edu_lb/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fa_ghali_bau_edu_lb%2FDocuments%2FFa 1 Gmail ch24 - OneDrive Print Download O Copy to Version history 13- Find the Thevenin and Norton equivalent circuits between ab. 2 A a 18 V ЗА 10 V 14- Find Vo by superposition theorem. of 6 2 62°F Clea prt sc 144 40 &arrow_forward: A) Select the best answer from multiple choices: 1. The system ete-5 is: a. Linear, time invariant, casual. b. Non-linear, time invariant, non-casual. c. Non-linear, time varying, casual. d. Not all the above. 2. Noise can be reduced through: a. Increasing So. b. Increasing Si. c. Both (a) and (b). d. Note all the above.arrow_forwardQuestion 5 & 6arrow_forward
- A Learner - Course Overview ents.adobe.com/public/newlearner/newlearner_d31ba933.html?i_qp_user_id=10743758&accountid=84369#/course/1899185/overview?cert_id=undefined&lp... A 5/00:35 Question 5 of 10 How much cubic inch space is required inside a box for 4 #6 XHHN current carrying conductors? OA. 8 cubic inches. B. 10 cubic inches OC. 20 cubic inches OD. 12 cubic inches O 81 20 Clear K ▶ Multiple Choice Submit 88°F Partly sunnyarrow_forwardNote:- • Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. • Answer completely. • You will get up vote for sure.arrow_forwardI want a solution in less than 30 minutes Often, the network is referred as an infinite bus when a change in input mechanical power or in field excitation to the unit does not cause an appreciable change in a. system frequency or terminal voltage b. Total production cost c. system frequency and terminal voltage d. system frequency alonearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Electricity for Refrigeration, Heating, and Air C...Mechanical EngineeringISBN:9781337399128Author:Russell E. SmithPublisher:Cengage Learning
Electricity for Refrigeration, Heating, and Air C...
Mechanical Engineering
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Cengage Learning