DAT 475 Applied Data Analysis
Project One Case Study
January 28, 2024
Preliminary Analysis Report
Problem Statement
A manufacturing company in Tijuana, Mexico produces electronic boards that go through a welding process in the Manual Finish area of the production line. Within this process the electronic boards have Thru-Holes components placed on the boards. The assembly of the electronic boards and Thru-Holes components is then welded in a wave soldering machine. The welded assembly is then quality checked by an employee who checks that the assembly does not have any welding defects. After quality check, the assembly is sent to other areas of the production for additional components to be installed.
Recently there has been an increase in demand for products produced by the company. There has also been an uptick in the defects in the welding process of the electronic boards and Thru-Holes components. These defects include the solder bridge, missing components, damaged components, lifted components, insufficient solder, and excessive solder. This increase
in defects has led to a rise in the number of assembly and electronic test problems after the electronic boards have gone through their final assembly stage (SNHU, 2023). The company is now going to comply with the requirements established by the IPC-A-
610E standard for electronic components and the products will need to be fixed before their final release. However, an assessment concluded that fixing the defects after they have gone through final assembly is cost prohibitive, time consuming, and requires staffing with specific skills. The standard IPC-A-610E criteria is not focused on processes to perform assembly operations or allow the change, modification, or repair of the final product.
In reviewing these elements, the company has requested a project to improve manufacturing defects with two outcomes. First, they would like a 20% reduction in defects generated during the welding process in three double production lines (SNHU, 2023). Second, a 20% increase in the capacity of the three double production lines where the boards are processed, while not increasing the percentage of defects (SNHU, 2023). By decreasing the manufacturing defects and expanding the capacity of the production line the company will reduce costs and improve quality of their products. This will allow the company to meet the greater demand for their products.
Cause(s) of the Identified Organizational Problem
The company provided defect data sets for three of their models as well as the entire facility. The data will be analyzed utilizing Pareto charts that I have created. I will use the 80/20 rule. This will allow us to determine what areas are causing the most defects. The company can then focus on the concerns where the defects fall below the 80% defect percentage. The Pareto charts help to determine what the most significant defects are. The most significant causes of defects are shown in Figures 1 thru 4 below.
Model 595407-XXX-00
The Model 595407-XXX-00 issues that had 80% of defects were solder bridge, missing component, lifted component, damaged component, excessive solder, reversed component, and solder void. Component broken, pin hole, and long terminals all had zero defects. All results
are shown in Figure 1 below.
Figure 1-Defects for Model 595407-XXX-00
Model 595481-00X-00
The Model 595481-00X-00 issues that had 80% of defects were solder bridge, lifted component, wrong component, pin damaged, missing component, excessive solder, and reversed component. Component misalignment, pin holes, and long terminals all had zero defects. All results are shown in Figure 2 below.
Figure 2-Defects for Model 595481-00X-00
Model 595310-001-00
The Model 595310-001-00 issues that had 80% of defects were excessive solder, solder bridge, damaged component, and pin damaged. The issues with zero defects were billboarding, trace open, component broken, and long terminals. All results are seen in Figure 3 below.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
A Team of Engineers asked for an internal combustion engine to use it in a designed car. Your role is to describe the operation sequence of different types of available engines, explain their mechanical efficiency, and deliver a detailed technical report to show your approach in solving and discussing the following tasks and issues.
You must follow the following steps to help the team:
STEP 1
Describe the operational sequence of four-stroke spark ignition and four-stroke compression ignition engines with the aid of sketches by constructing simple sketch representing the operation and plotting the P-V diagrams for each process during the cycle to show the following:
The input and output heat and net output work
The expansion and compression strokes
The air-fuel mixture intake and exhaust gasses
The spark plug when it is in the active mode
The complete cycle of ideal Otto and Diesel cycles that shows the input and output heat and net output work.
STEP 2
Explain the mechanical…
arrow_forward
Case Study – The New Engineer
Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job.
Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them.
As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke.
In talking with the workers, Jeff learns of some of…
arrow_forward
Case Study – The New Engineer
Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job.
Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them.
As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke.
In talking with the workers, Jeff learns of some of…
arrow_forward
00
T
R
%24
Bb R
V qa
du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826
* Question Completion Status:
Attach File
Browse Local Files
Browse Content Collection
QUESTION 2
A company needs to choose one supplier for a particular type of silicon wafer used'in the production of
semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer,
independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not
consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept
an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000
wafers. Assume a 20% annual interest rate for holding cost calculations.
a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the
optimal order quantity?
b. If the replenishment lead time for wafers…
arrow_forward
9. A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered?
I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky.
II. The personnel at many levels sent false reports forward on cost incurred and progress made.
III. The contractor lacked adequate technical skills to deal with technology that was still evolving.
IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program.
Group of answer choices
II and III only
I only
None of the choices
I,…
arrow_forward
P Flag question
The following method conduct a brainstorming session to understand the likelihood of future events and impact they may have on
project
Select one:
Delphi Technique
O b. Time series models
O C. Causal models
O d. Market Research
arrow_forward
Kasapreku Distilleries Ghana Ltd, a liquor Production Company located in Ghana had a major contract to supply alcoholic beverage to a neighboring country within one week deadline. In the course of production, there was a major breakdown which led to a long downtime resulting in missing out on the deadline. Kasapreku had lost a great deal of money due to the company’s inability to seriously inculcate safety and maintenance engineering in their system.
(a) Discuss the importance of safety in an engineering maintenance from Kasapreku’s case scenario
arrow_forward
Please answer quickly
arrow_forward
Kasapreku Distilleries Ghana Ltd, a liquor Production Company located in Ghana had a major contract to supply alcoholic beverages to a neighboring country within a one-week deadline. In the course of production, there was a major breakdown which led to a long downtime resulting in missing out on the deadline. Kasapreku had lost a great deal of money due to the company’s inability to seriously inculcate safety and maintenance engineering in their system.
(a) Discuss the importance of safety in engineering maintenance from Kasapreku’s case scenario.
(b) Discuss the importance of safety in engineering maintenance.
arrow_forward
The worker shown below is using a 10-lb pneumatic nut runner to tighten nuts within a tractor cab compartment. What are health and safety problems likely to result from her job? Evaluate the job and the
workstation identifying poor work design features. Please come up with at least five poor design features.
(Please refer to the format of the answers in the class example solution)
No.
1
2
3
4
園
5
Problem
Ergonomics Improvement
Design Principle
arrow_forward
Department of Mechanical Engineering
PRINCIPLES OF COMPUTER AIDED ENGINEERING – MENG303
Please solve the problem by keupord
10.Consider the Material Selection Design Problem for the FRAME of a Human Powered Road
Vehicle. Define the selection criteria, assign weights (importance), and evaluate the
following alternatives based on COST, WEIGHT, STRENGTH, AVAILABILITY,
MANUFACTURABILITY, ASSEMBLY, TEST & MAINTENANCE, ENVIRONMENT
& SUSTAINABILITY, SAFETY & RELIABILITY:
a.Steel
b.Aluminum
c. Titanium
arrow_forward
no hurry .............
a very good handwriting with every step to be mentioned to understand the answer easily
step to follow
given
requirement
solution
result
if not followed the above steps , ready for consequences
i want the solution with a very good handwriting
arrow_forward
LESSON: AUTODESK AUTOCAD
Choose from the choices:
arrow_forward
Please answer the 4th question
arrow_forward
Problem 2:
Review the below link, and choose 3 practical examples to solve structural/performance-based issues using
finite element product. Discuss what you understand from these examples. Use your own words.
https://www.hitechfea.com/fea-projects.html
hitech
Since
Your Partner in Digital Excellence 1992
SERVICES ✓ PROJECTS ✓
» FEA Projects
CLIENTS
FEA shortens the Design
Cycle for Thermal Radiation
Detector System for Power
Plant
BLOG
ABOUT US CONTACT US
Finite Element Analysis - FEA Projects / Case Studies
Please review few of the FEA projects, FEA case studies and FEA work samples that represent the FEA
solutions HiTech FEA engineers have provided to our global clientele from different industries.
Simulation using ANSYS
Professional NLS helps to
reduce Product Development
Cycle
Effective Static Structural
Services conducting
Structural Seismic Analysis of
RTO System Base
arrow_forward
Which one is the correct answer for this question please ?
arrow_forward
5 Look at the flow chart showing the steps of the design process. Then read the list of
steps for designing a thermos. These steps are not in order. Write the letter of each
step in the appropriate box of the flow chart.
The Design Process
Find a problem
Keep records
Plan and build
a prototype
Keep records
Test and
improve
Keep records
Communicate
the solution
arrow_forward
I may have the answer but I'm not sure
arrow_forward
Please assist with answering the following question?
arrow_forward
n/mod/quiz/attempt.php?attempt3D2656018cmid%3D36642
NCT e-Learning Portal
Courses Reports
e-Services -
Academic Departments -
ETC - CIMS -
on 17
In the classification of manufacturing process, pressing is an example of
et
ered
O secondary machining process
ed out of
O primary shaping process
ag question
O surface finishing process
O joining process
stion 18
Gold chains and rings are not possible to made with hand forging operation.
yet
vered
Select one:
ked out of
O True
O False
lag question
estion 19
Identify the drilling operation in which the flat bottom drill bit is used to enlarge the existing hole.
E yet
wered
O Type here to search
5米
ts
23
$
6
8.
V.
E
R
Y
行
24
47
arrow_forward
I need answers to questions 10, 11, and 12 pertaining to the print provided.
Note: A tutor keeps putting 1 question into 3 parts and wasted so many of my questions. Never had a issue before until now, please allow a different tutor to answer because I was told I am allowed 3 of these questions.
arrow_forward
Question 8
Which of these is an important design consideration in engineering design?
Select one:
O A. Weight
B.
Shape
O C. Corrosion
OD. Friction
E. All of the above
arrow_forward
Quality Engineering question
Describe ideal design process and explain briefly. What are design inputs?
Consider the table when answering. Please answer in your own words.
arrow_forward
b) After leaving CBU you are running
company dealing in material design,
manufacturing
customer has asked your company
to test a few samples which you
suspect to be mild steel. You have
therefore asked your subordinates,
technicians, to carry out these tests.
Results are as shown in Fig.1. For
you to write a report, which is critical
if your company has to be paid,
explain the following to your
customer:
and testing.
A
Curve Y
Curve X
Stres
Fig.1: Stress-strain ourves
1) Material properties labelled A, B, C and D
2) How do you detemine the material's Young's modulus?
3) What's the difference between Curve X and Curve Y?
4) What measurements would you take if you are to determine Poisson's ratio
Stress
arrow_forward
Industrial engineering question please solve fast
arrow_forward
Explain why Factor of Safety are important in Engineering field of study, especially in engineering design. Thank you:!
arrow_forward
The design process
Identify the problem
Do research
Develop possible solutions
Choose one solution
Design and construct a prototype.
Test the prototype
Communicate results
Evaluate and redesign.
8. How would an engineer use the design process to build a car that uses less gas?
arrow_forward
How Do We Approach an Engineering Design Problem?
arrow_forward
Chapter 14, question 5:Using the information in Problem 14.5, construct a net material requirements plan using the following on-hand inventory.
ITEM
ON-HAND INVENTORY
ITEM
ON-HAND INVENTORY
S
20
W
30
T
20
X
25
U
40
Y
240
V
30
Z
40
Note: Fill out the following table to answer this question:
Group of answer choices
Item Z has an order release of 320 units in week 3.
Item Z has an order release of 320 units in week 1.
Item Z has an order release of 320 units in week 2.
Item Z has an order release of 60 units in week 3.
Item Z has an order release of 300 units in week 2.
Chapter 14, question 7:Refer again to Problems 14.5 and 14.7. In addition to 100 units of S, there is also a demand for 20 units of U, which is a component of S. The 20 units of U are needed for maintenance purposes. These units are needed in week 6. Modify the net material requirements plan to reflect this change.
Group of answer choices
Item Z has an order release of 300 units in…
arrow_forward
Dont use Ai okk just solve clean handwriting or make same template for answer can understand good. Only 100% sure answers experts solve it All okk . If u will answer wrong I will dislike okkk
Note. D e f g h solve okkk
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
Related Questions
- A Team of Engineers asked for an internal combustion engine to use it in a designed car. Your role is to describe the operation sequence of different types of available engines, explain their mechanical efficiency, and deliver a detailed technical report to show your approach in solving and discussing the following tasks and issues. You must follow the following steps to help the team: STEP 1 Describe the operational sequence of four-stroke spark ignition and four-stroke compression ignition engines with the aid of sketches by constructing simple sketch representing the operation and plotting the P-V diagrams for each process during the cycle to show the following: The input and output heat and net output work The expansion and compression strokes The air-fuel mixture intake and exhaust gasses The spark plug when it is in the active mode The complete cycle of ideal Otto and Diesel cycles that shows the input and output heat and net output work. STEP 2 Explain the mechanical…arrow_forwardCase Study – The New Engineer Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job. Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them. As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke. In talking with the workers, Jeff learns of some of…arrow_forwardCase Study – The New Engineer Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job. Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them. As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke. In talking with the workers, Jeff learns of some of…arrow_forward
- 00 T R %24 Bb R V qa du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826 * Question Completion Status: Attach File Browse Local Files Browse Content Collection QUESTION 2 A company needs to choose one supplier for a particular type of silicon wafer used'in the production of semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer, independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000 wafers. Assume a 20% annual interest rate for holding cost calculations. a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the optimal order quantity? b. If the replenishment lead time for wafers…arrow_forward9. A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered? I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky. II. The personnel at many levels sent false reports forward on cost incurred and progress made. III. The contractor lacked adequate technical skills to deal with technology that was still evolving. IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program. Group of answer choices II and III only I only None of the choices I,…arrow_forwardP Flag question The following method conduct a brainstorming session to understand the likelihood of future events and impact they may have on project Select one: Delphi Technique O b. Time series models O C. Causal models O d. Market Researcharrow_forward
- Kasapreku Distilleries Ghana Ltd, a liquor Production Company located in Ghana had a major contract to supply alcoholic beverage to a neighboring country within one week deadline. In the course of production, there was a major breakdown which led to a long downtime resulting in missing out on the deadline. Kasapreku had lost a great deal of money due to the company’s inability to seriously inculcate safety and maintenance engineering in their system. (a) Discuss the importance of safety in an engineering maintenance from Kasapreku’s case scenarioarrow_forwardPlease answer quicklyarrow_forwardKasapreku Distilleries Ghana Ltd, a liquor Production Company located in Ghana had a major contract to supply alcoholic beverages to a neighboring country within a one-week deadline. In the course of production, there was a major breakdown which led to a long downtime resulting in missing out on the deadline. Kasapreku had lost a great deal of money due to the company’s inability to seriously inculcate safety and maintenance engineering in their system. (a) Discuss the importance of safety in engineering maintenance from Kasapreku’s case scenario. (b) Discuss the importance of safety in engineering maintenance.arrow_forward
- The worker shown below is using a 10-lb pneumatic nut runner to tighten nuts within a tractor cab compartment. What are health and safety problems likely to result from her job? Evaluate the job and the workstation identifying poor work design features. Please come up with at least five poor design features. (Please refer to the format of the answers in the class example solution) No. 1 2 3 4 園 5 Problem Ergonomics Improvement Design Principlearrow_forwardDepartment of Mechanical Engineering PRINCIPLES OF COMPUTER AIDED ENGINEERING – MENG303 Please solve the problem by keupord 10.Consider the Material Selection Design Problem for the FRAME of a Human Powered Road Vehicle. Define the selection criteria, assign weights (importance), and evaluate the following alternatives based on COST, WEIGHT, STRENGTH, AVAILABILITY, MANUFACTURABILITY, ASSEMBLY, TEST & MAINTENANCE, ENVIRONMENT & SUSTAINABILITY, SAFETY & RELIABILITY: a.Steel b.Aluminum c. Titaniumarrow_forwardno hurry ............. a very good handwriting with every step to be mentioned to understand the answer easily step to follow given requirement solution result if not followed the above steps , ready for consequences i want the solution with a very good handwritingarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Automotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage Learning
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning