Castro Valley Canines
Semi-Pro Baseball Team
Request for Proposal PP1
New Field Facility Project
2661 Renton Way
Castro Valley, CA. 94546
1-866-589-3878
Higgins, Lauren
Lhiggins5620@gmail.com
PM598 – Jan. 2013
TABLE OF CONTENTS
1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 3 1.3. Schedule of Bid Period Activities 4 1.4. Location of Work 5 1.5. Pre-Bid Meeting 5 1.6. Owner Contact for Questions 5 1.7. Pre-Award Surveys 5 1.8. Sealed Bid Requirements 5 1.9. Basis for Bid Evaluation 6 1.10. Ethical Standards 6 1.11. Responsibility for Surety Bonds 6 1.12. Proposal Format 6 1.13. List of Bidders 6 1.14. Letter of Acknowledgment 6
2.
…show more content…
Location of Work
The location of the land is at:
2001 Center St
Castro Valley, CA. 94546
Please see the schedule for work above for site visit date.
All equipment may be stored on this site.
1.5. Pre-Bid Meeting The Following information is TBD
Pre-bid meetings can be held after the RFP’s are issued and prior to the bid due date. Pre-bid meetings may be referred to with other titles in RFP’s such as a pre-proposal conference in government RFP’s. If an owner intends to have a pre-bid meeting, the Instructions provide the location, date, and time of the meeting. The Instructions may also describe the purpose of the meeting and how answers to questions from bidders will be handled. The answers to the questions from bidders are normally handled in a formal manner since they are a supplement to the information provided in the RFP.
1.6. Owner Contact for Questions
It is important that an owner designate one individual to act as the contact person for questions from bidders during the bid period. This organizational approach assures that questions are handled in a consistent manner and that all bidders receive the same answers to questions. The answers to individual questions from bidders during the bid period that are not responded to at a pre-bid meeting are also important supplemental information to the original RFP. The procurement group representative assigned to a contract is often the designated contact person for an owner. The Instructions specify
I achieve this within my role by ensuring residents and their families are informed, kept up to date and by providing clear choices. I will act as an advocate on behalf of the young people in my care, to ensure they are represented and heard.
2. Working according to the agreed ways means following the organisation’s policy and procedures in relation to pressure areas. It also means following the individual care plans and respecting the instructions in place. For example making sure a resident is turned every two hours, applying Cavilon cream on areas; fill in turning charts, prompt fluid intake. Under the duty of care a care assistant must always be aware of and raise concerns regarding possible pressure areas. Always record information in care plans accurately and in confidentiality.
Within this bid include materials that will be used during this project. Provide a list and description of similar project experience on baseball fields, turf, club house, parking lots and landscape, drainage/utility designs for the general contractor that demonstrates the qualifications for this project.
Looking at the outcomes, which are the result of the support plan, these include inputs, outputs and outcomes. In simplified terms, these items look like:
* Nursing care providers are not covered by this legislation and must make their own arrangements for the disposal of unwanted medicine through a licensed waste management company.
Understand own responsibilities, and responsibilities of others, relting to health and safety in the work setting.
IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download
-3 x 1.66 pts. = minus 5 pts. = 45 pts. out of 50 pts. = 90%
You are planning an outing with a group of individuals. Some of the individuals need assistance with using the toilet, eating and drinking, and with their medication.
A medium-sized firm Clean fabrics Inc in United States has increased the company’s revenues strategically about $350 million dollars per year. The company struggles to meet the objectives of expanding the company along with the cost control. The vision of the company is to provide the right choice to the clients and supplying the support services for the cruise ship industry in the different parts of the world operating in the areas of hotel and travel. The services are supplied to major hotel chains and cruises including linen services in the south east area of United States. Comparatively, the cruise ship industry provides the company with an
1. Ernestine Friedl says that the position of women is higher the more they are involved in (l) primary subsistence (as owners or controllers, NOT merely as laborers) and (2) the PUBLIC distribution of the product of subsistence. Use this argument to account for the position of women in Kung society. Make sure you use both part (l) and part (2) of Friedl’s argument. (Don’t worry that Friedl’s argument is simplistic; she is not trying to say that women’s role in subsistence is the ONLY factor that affects their position in society.)
1. (TCO B) Identify four categories of measures that might constitute a Balanced Scorecard of performance measures and provide an example of each. Also explain how a Balanced Scorecard could assist your organization. This answer must be in your own words—significant cut and paste from the text or other sources is not acceptable. (Points : 30)
1. You recently retired from government contracting work and established a consulting company (fully consistent with government ethics laws and rules, of course) with the primary focus of advising potential government contractors and subcontractors. Mr. Johnny Jones, of The Johnny Jones Flooring and Construction Company has approached you with a question. Jones and his company are potential subcontractors (they, obviously, specialize in flooring) on a federal construction contract worth a little over two million dollars ($ 2,000,000.00) recently awarded to the Jimmy Smith Construction Company (Jimmy Smith, the prime contractor). Neither Johnny nor his company have ever been part of a government contract
Pg 1 of 14 PM598 – Go Green Consulting’s RFP 2010 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS............................................................................................................3 1.1. General Description of Work..............................................................................................................3 1.2. What Must Be Included with Bid
3. Request for Proposal (RFP) is a solicitation made, often through a bidding process, by an agency or company interested in procurement of a commodity, service or valuable asset, to potential suppliers to submit business proposals. The RFP process brings structure to the procurement decision and is meant to allow the risks and