3- Estimate the Curve Number for all three AMC conditions for a basin with the following data: Soil group A Soil group B Soil group C Soil group D Total area (%) (%) (%) (%) (%) Land use Farm Seeded Pasture land (fair) 8 2 2 20 1 14 10 11 2 22 1 7 60 15 25

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 3RQ: What is the purpose of a soils report, and how can the information it contains assist the estimator?
icon
Related questions
Question
3- Estimate the Curve Number for all three AMC conditions for a basin with the following data:
Soil group A Soil group B Soil group C Soil group D
(%)
(%)
(%)
(%)
Land use
Farm
Seeded
Pasture land (fair)
8
2
2
20
1
14
10
11
2
22
1
7
Total area (%)
60
15
25
Transcribed Image Text:3- Estimate the Curve Number for all three AMC conditions for a basin with the following data: Soil group A Soil group B Soil group C Soil group D (%) (%) (%) (%) Land use Farm Seeded Pasture land (fair) 8 2 2 20 1 14 10 11 2 22 1 7 Total area (%) 60 15 25
Expert Solution
steps

Step by step

Solved in 5 steps with 10 images

Blurred answer
Knowledge Booster
Soil engineering for highway design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,