SW 2020: ESS. OF TAX (LL) W/ ACCESS
23rd Edition
ISBN: 9780357251959
Author: Nellen
Publisher: CENGAGE L
expand_more
expand_more
format_list_bulleted
Question
error_outline
This textbook solution is under construction.
Students have asked these similar questions
The city of Columbia is considering extending the runways of its municipal airport so that commercial jets can use the facility. The land necessary for the runway extension is currently a farmland that can be purchased for $350,000. Construction costs for the runway extension are projected to be $600,000, and the additional annual maintenance costs for the extension are estimated to be $22,500. If the runways are extended, a small terminal will be constructed at a cost of $250,000. The annual operating and maintenance costs for the terminal are estimated at $75,000. Finally, the projected increase in flights will require the addition of two air traffic controllers at an annual cost of $100,000. Annual benefits of the runway extension have been estimated as follows (shown): Apply the B–C ratio method with a study period of 20 years and a MARR of 10% per year to determine whether the runways at Columbia Municipal Airport should be extended.
The council members of a small town have decided that the earth levee that protects the town from flooding should be rebuilt and strengthened. The town engineer estimates that the cost of the work at the end of the first year will be $68,000. He estimates that in subsequent years the annual repair costs will decline by $7000, making the second-year cost $61,000; the third-year $54,000, and so forth. The council members want to know what the equivalent present cost is for the first 5 years of repair work if interest is 6%.
On January 2, 2011, Blink Corporation was granted 5,000 acres of land in a village, located near the slums outside city limits, by a local government authority. The condition attached to this grant was that Blink Corporation should clean up this land and lay roads by employing laborers from the village in which the land is located. The government has fix the minimum wage payable to the workers. The entire operation will take three years and is estimated to cost P100,000,000. This amount will be spent in this way, P20,000,000 each in the first, P30,000,000 in the second years and P50,000,000 in the third year. The fair value of the land is currently P120,000,000.
What portion of the grant is recognized for the year ended December 31, 2012?
Knowledge Booster
Similar questions
- Alexander Industries is considering purchasing an insurance policy for its new office building in St. Louis, Missouri. The policy has an annual cost of $10,000. If Alexander Industries doesn’t purchase the insurance and minor fire damage occurs, a cost of $100,000 is anticipated; the cost if major or total destruction occurs is $200,000. The costs, including the state-of-nature probabilities, are as follows: Using the expected value approach, what decision do you recommend? What lottery would you use to assess utilities? (Note: Because the data are costs, the best payoff is $0.) Assume that you found the following indifference probabilities for the lottery defined in part (b). What decision would you recommend? Do you favor using expected value or expected utility for this decision problem? Why?arrow_forwardThe city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown (DT) and southwest (SW) of the metropolitan area. The city already owns enough land at the DT site; however, the land for a parking garage will cost $1 million, and construction costs will be $10 million for the parking garage, infrastructure relocation, and drainage. The SW site is 30 km from downtown, but the land will be donated by a developer who knows that an arena at this site will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of $700,000 per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $400,000 per year. All other costs and revenues are expected to be the same…arrow_forwardThe City of Prattville donated some land with a few old manufacturing buildings on it to the Laurel Corporation that was only worth $50,000. The Laurel Corporation owns the television show, Home Renovations that builds beautiful condominiums from old manufacturing buildings and then sells them to young wealthy accountants. They film in Prattville for two months investing 2 million dollars in the complex. What basis does Laurel Corporation have in the condominium complex?arrow_forward
- Washington County’s Board of Representatives is considering the construction of a longer runway at the county airport. Currently, the airport can handle only private aircraft and small commuter jets. A new, long runway would enable the airport to handle the midsize jets used on many domestic flights. Data pertinent to the board’s decision appear below. Cost of acquiring additional land for runway $ 70,000 Cost of runway construction 200,000 Cost of extending perimeter fence 29,840 Cost of runway lights 39,600 Annual cost of maintaining new runway 28,000 Annual incremental revenue from landing fees 40,000 In addition to the preceding data, two other facts are relevant to the decision. First, a longer runway will require a new snowplow, which will cost $100,000. The old snowplow could be sold now for $10,000. The new, larger plow will cost $12,000 more in annual operating costs. Second, the County Board of Representatives believes that the…arrow_forwardThe state is considering three proposals for increasing the capacity of the main drainage canal in an agricultural region. Proposal A requires dredging the canal. The state is planning to purchase the dredging equipment and accessories for $650,000. The equipment is expected to have a 10-year life with a $17,000 salvage value. The annual operating costs are estimated to total $50,000. To control weeds in the canal itself and along the banks, environmentally safe herbicides will be sprayed during the irrigation season. The yearly cost of the weed control program is expected to be $120,000.Proposal B is to line the canal walls with concrete at an initial cost of $4 million. The lining is assumed to be permanent, but minor maintenance willbe required every year at a cost of $5000. In addition, lining repairs will have to be made every 5 years at a cost of $30,000.Proposal C is to construct a new pipeline along a different route. Estimatesare: an initial cost of $6 million, annual…arrow_forwardJack and Jill’s Place is a nonprofit nursery school run by the parents of the enrolled children. Since the school is out of town, it has a well rather than a city water supply. Lately, the well has become unreliable, and the school has had to bring in bottled drinking water. The school’s governing board is considering drilling a new well (at the top of the hill, naturally). The board estimates that a new well would cost $7,374 and save the school $1,200 annually for 10 years. The school’s hurdle rate is 8 percent.Required:Compute the internal rate of return on the new well. Should the governing board approve the new well Questions? Internal Rate of Return: __________ Approve? Yes or Noarrow_forward
- A project is being considered by the Tennessee Department of Transportation to replace an aging bridge across the Cumberland River on a state highway. The existing two-lane bridge is expensive to maintain and creates a traffic bottleneck because the state highway is four lanes wide on either side of the bridge. The new bridge can be constructed at a cost of $300,000, and estimated annual maintenance costs are $10,000. The existing bridge has annual maintenance costs of $18,500. The annual benefit of the new four-lane bridge to motorists, due to the removal ofthe traffic bottleneck, has been estimated to be $25,000. Conduct a B–C analysis, using aMARR of 8% and a study period of 25 years, to determine whether the new bridge should be constructed.arrow_forwardA real estate investor has the opportunity to purchase land currently zoned as residential. If the county board approves a request to rezone the property as commercial within the next year, the investor will be able to lease the land to a large discount firm that wants to open a new store on the property. However, if the zoning change is not approved, the investor will have to sell the property at a loss. Profits (in thousands of dollars) are shown in the following payoff table: State of Nature Rezoning Approved Rezoning Not Approved Decision Alternative s1 s2 Purchase, d1 600 -200 Do not purchase, d2 0 0 (a) If the probability that the rezoning will be approved is 0.5, what decision is recommended? Recommended Decision: What is the expected profit? Enter your answer in dollars. For example, an answer of $200 thousands should be entered as 200,000. $arrow_forwardThe city council is considering a proposal about purchasing a new landfill site. Both the current landfill and new landfill would be usable for the next 10 years. The purchase price is $279,000 and the preparatory work will cost $77,800. It is estimated that the new landfill will cost $51,000 less per year to operate than the current landfill. Assume a hurdle rate of 8%. Ignore tax impacts. Required: Calculate the net present value of the new landfill. Should the city council approve the project on financial grounds? Calculate the internal rate of return for the new landfill. Should the city council approve the project on financial grounds?arrow_forward
- Aerotron Electronics is considering the purchase of a water filtration system to assist in circuit board manufacturing. The system costs $40,000. It has an expected life of 7 years at which time its salvage value will be $7,500. Operating and maintenance expenses are estimated to be $2,000 per year. If the filtration system is not purchased, Aerotron Electronics will have to pay Bay City $12,000 per year for water purification. If the system is purchased, no water purification from Bay City will be needed. Aerotron Electronics must borrow half of the purchase price, but they cannot start repaying the loan for 2 years. The bank has agreed to three equal annual payments, with the first payment due at end of year 2. The loan interest rate is 8% compounded annually. Aerotron Electronics’ MARR is 10% compounded annually. Solve, a. What is the internal rate of return of this investment? b. What is the decision rule for judging the attractiveness of investments based on internal rate of…arrow_forwardAerotron Electronics is considering the purchase of a water filtration system to assist in circuit board manufacturing. The system costs $40,000. It has an expected life of 7 years at which time its salvage value will be $7,500. Operating and maintenance expenses are estimated to be $2,000 per year. If the filtration system is not purchased, Aerotron Electronics will have to pay Bay City $12,000 per year for water purification. If the system is purchased, no water purification from Bay City will be needed. Aerotron Electronics must borrow half of the purchase price, but it cannot start repaying the loan for 2 years. The bank has agreed to three equal annual payments, with the first payment due at the end of year 2. The loan interest rate is 8% compounded annually. Aerotron Electronics’ MARR is 10% compounded annually. Solve, a. What is the annual worth of this investment? b. What is the decision rule for judging the attractiveness of investments based on annual worth? c. Should…arrow_forwardThe Drug-Free Center, a growing nonprofit, is currently considering the construction of a new wing to extend its treatment building. After consulting with a law firm that specializes in municipal bonds, the nonprofit has decided to issue a tax-exempt municipal bond, taking advantage of the potential lower financing costs. The initial consideration of the bond issue is $50 million, and the bond issuance cost is estimated to be $1 million, including all professional services of the bond counsel and financial adviser, in addition to the underwriting firm. The full term of the bond issue is twenty years, in consideration of the economic life of the facility before the major renovation is needed. The interest rate is 6 percent, based on the market rate for tax-exempt municipal bonds for similar projects at the time. The city authority has agreed to issue the bond based on a signed inducement. You are the nonprofit's financial manager and are asked to create a bond structure and payment…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Individual Income TaxesAccountingISBN:9780357109731Author:HoffmanPublisher:CENGAGE LEARNING - CONSIGNMENTPrinciples of Accounting Volume 1AccountingISBN:9781947172685Author:OpenStaxPublisher:OpenStax College
Individual Income Taxes
Accounting
ISBN:9780357109731
Author:Hoffman
Publisher:CENGAGE LEARNING - CONSIGNMENT
Principles of Accounting Volume 1
Accounting
ISBN:9781947172685
Author:OpenStax
Publisher:OpenStax College