OPERATIONS MANAGEMENT (LL W/ CONNECT)
14th Edition
ISBN: 9781266539787
Author: Stevenson
Publisher: MCG
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
thumb_up100%
Chapter 10, Problem 1P
a)
Summary Introduction
To determine: The percentage of parts that will not meet the specifications.
Introduction: Deviations from a standard is inevitable in a production process for which tolerance limits are fixed but products that exceed the tolerance limits are removed and corrected, which is known as the control process.
b)
Summary Introduction
To determine: The values within which 95.44 percent of sample mean of the process will fall, when the process is in control and sample is n=16.
Introduction: Deviations from a standard is inevitable in a production process for which tolerance limits are fixed but products that exceed the tolerance limits are removed and corrected, which is known as the control process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Specifications for a part for a 3-D printer state that the part should weigh between 24 and25 ounces. The process that produces the parts has a mean of 24.5 ounces and a standard deviation of .2 ounce. The distribution of output is normal.
What percentage of parts will not meet the weight specs?
Within what values will 95.44 percent of the sample means of this process fall if samples of
n = 16 are taken and the process is in control (random)?
Using the control limits from part b, would the following sample means be in control? 24.52,
24.53, 24.44, 24.51, 24.41, 24.39
An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approxi- mately normal with a mean of 1.0 liter and a standard deviation of .01 liter. Output is monitored using means of samples of 25 observations.
Determine upper and lower control limits that will include roughly 97 percent of the sample means when the process is in control.
Given the following sample means—1.005,…
At Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length
is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49
inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?
A can filling process at a beverage manufacturing factory is assumed to be in control with limits of 84 ±3 had sample
averages for the x-bar chart of the following:87.1,87, 87.2, 89, 90, 88.5, 89.5, and 88. Which of the following statement
?below are correct
Not enough information to determine
.a O
None is correct b O
Process mean is in-control
.c O
Process mean is out-of-control .d O
أخل اختياري
4) E ENG
acer
Chapter 10 Solutions
OPERATIONS MANAGEMENT (LL W/ CONNECT)
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? = x= 155.56 mm (round your response to two decimal places). b) What is the value of R? R 4.48 mm (round your response to two decimal places). c) What are the UCL; and LCL; using 3-sigma? Day 1 2 3 4 5 Upper Control Limit (UCL) = 156.94 mm (round your response to two decimal places). Lower Control Limit (LCL-) = 154.18 mm (round your response to two decimal places). d) What are the UCLR and LCLR using 3-sigma? Upper Control Limit (UCL) = 7.96 mm (round your response to two decimal places). Mean x (mm) 154.9 153.2 155.6 155.5 158.6 Range R (mm) 4.0 4.8 3.9 5.0 4.7 Lower Control Limit (LCL) = 1.00 mm (round your response to two decimal places). e) If the true diameter mean should be 155 mm and you want…arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forwardControl charts for X-bar and S are maintained for the fill volume of protein shake drink. The specifications are 330 + 10 mL. After 40 samples of size n=7 are analyzed, we find that: 40 40 = 13,200 Si = 296 i=1 i=D1 Find the best estimate of the process standard deviation. 7.498 7.400 7.570 2.737 7.713 8.032arrow_forward
- Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? x= 156.76 mm (round your response to two decimal places). b) What is the value of R? Day 1 2 3 4 5 Mean x (mm) 158.9 155.2 155.6 157.5 156.6 R = 4.40 mm (round your response to two decimal places). c) What are the UCL and LCL using 3-sigma? Upper Control Limit (UCL) = mm (round your response to two decimal places). Range R (mm) 4.2 4.4 4.3 4.8 4.3 Çarrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? = x= 156.76 mm (round your response to two decimal places). b) What is the value of R? R= mm (round your response to two decimal places). Day 1 2 3 4 5 Mean x (mm) 158.9 155.2 155.6 157.5 156.6 Range R (mm) 4.2 4.4 4.3 4.8 4.3arrow_forwardRosters Chicken advertises " lite" chicken with 30% fewer calories than standard chicken. When the process for "lite" chicken breast production is in control, the average chicken breast contains 420 calories, and the standard deviation in caloric content of the chicken breast population is 25 calories. Rosters wants to design an x-chart to monitor the caloric content of chicken breasts, where 25 chicken breasts would be chosen at random to form each sample.a) What are the lower and upper control limits for th.is chart if these limits are chosen to be four standard deviations from the target?b) What a re the limits with three standard deviations from the target?arrow_forward
- Webster Chemical Company produces mastics and caulking for the construction industry. The product is blended in large mixers and then pumped into tubes and capped. Management is concerned about whether the filling process for tubes of caulking is in statistical control. The process should be centered on 8 ounces per tube. Several samples of eight tubes were taken, each tube was weighed, and the weights in Table were obtained. Ounces of Caulking Per Tube Tube Number Sample 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7.98 8.33 7.89 8.24 7.87 8.13 8.34 8.22 7.77 8.18 8.13 8.14 8.02 8.08 7.91 7.83 7.92 8.11 7.94 8.51 8.04 8.05 7.99 8.13 8.44 8.41 8.00 7.90 8.10 8.14 7.68 8.28 7.89 8.16 7.81 8.12 7.81 8.09 7.93 7.97 8.14 8.13 8.11 8.16 8.09 8.07 7.88 8.14 a. Assume that only six samples are sufficient and develop the control charts for the mean and the range.b. Plot the observations on the control chart and comment on your findings.arrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of X? x= mm (round your response to two decimal places). Day 1 2 3 4 5 Mean x (mm) 158.9 155.2 155.6 157.5 156.6 Range R (mm) 4.2 4.4 4.3 4.8 4.3arrow_forward1. Boxes of Honey-Nut Oatmeal are produced to contain 14.0 ounces, with a standard deviation of 0.10 ounce. For a sample size of 64, the 3-sigma x chart control limits are: Upper Control Limit (UCLx) = 14.0414.04 ounces (round your response to two decimal places). Lower Control Limit (LCLx) =?ounces (round your response to two decimal places). 2. The overall average on a process you are attempting to monitor is 55.0 units. The process population standard deviation is 1.84. Sample size is given to be 16. a) Determine the 3-sigma x-chart control limits. Upper Control Limit (UCLx)=56.3856.38 units (round your response to two decimal places). Lower Control Limit (LCLx)=? units (round your response to two decimal places). 3. Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. Thirty-five samples of size 7 each were taken from a fertilizer-bag-filling machine at Panos Kouvelis Lifelong Lawn Ltd.…arrow_forward
- Using samples of 200 credit card statements, an auditor found the following: Sample 1 2 3 4 Number with errors 4 2 5 9 a. Determine the fraction defective in each sample. b. If the true fraction defective for this process is unknown, what is your estimate of it? c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size? d. What control limits would give an alpha risk of .03 for this process? Page 457 e. What alpha risk would control limits of .047 and .003 provide? f. Using control limits of .047 and .003, is the process in control? g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What are the values of the mean and standard deviation of the sampling distribution? h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control? Can you show me the steps and formulas using excelarrow_forwardAnswer the given question with a proper explanation and step-by-step solution. Johnson & Johnson manufactures needles that are subjected to a bend test. They use statistical process control (SPC) and the results (measured in grams) are plotted on a chart. If the process average is 26,1 and the average range is 5; what will the control limits be if the sample size n=8? The factor for calculation of control limits is 0,373 for sample size n=8. Which statement(s) is/are true? a The process is "out of control". b The process is "in control". c The upper control limit equals 27,965. d The upper control limit equals 24,235. e The lower control limit equals 27,965. 1. a 2. b, c 3. a, c 4. b, c, d 5. a, d, earrow_forwardA can filling process at a beverage manufacturing factory is assumed to be in control with limits of 89 ± 4 had sample averages for the x-bar chart of the following: 87.1,87,87.2, 89, 90, 88.5, 89.5, and 88. Which of the following statement below are correct? O a. None is correct O b. Process mean is out-of-control Not enough information to determine O d. Process mean is NOT out-of-control NEXT PAGE PAGEarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.