a)
To determine: Theminutes per day of actual room cleaning can be done by each housekeeper
Introduction: Work sampling is the technique, which helps to estimate the percentage of time that was spent by the worker on different kind of tasks assigned to him. Random observations help to record the performance of the worker on various activities.
b)
To determine: Minutes of room cleaning that the hotel requires for the present day
Introduction: Work sampling is the technique, which helps to estimate the percentage of time that was spent by the worker on different kind of tasks assigned to him. Random observations help to record the performance of the worker on various activities.
c)
To determine: Number of housekeepers required to clean the hotel for the present day
Introduction: Work sampling is the technique, which helps to estimate the percentage of time that was spent by the worker on different kind of tasks assigned to him. Random observations help to record the performance of the worker on various activities.
d)
To determine: Number of housekeepers required to clean the hotel if all the guests check out.
Introduction: Work sampling is the technique, which helps to estimate the percentage of time that was spent by the worker on different kind of tasks assigned to him. Random observations help to record the performance of the worker on various activities.
Want to see the full answer?
Check out a sample textbook solutionChapter 10 Solutions
Operations Management: Sustainability And Supply Chain Management Custom Edition For Temple University, Version 3
- QUESTION 5a. A Chef bakes and decorates cakes in a two-stage process. The cakes are baked and once cooledthey are then decorated based on the clients’ requirements. The Chef received seven orders forfully decorated cakes and has documented the orders with respective processing times for bakingand decorating, as shown in Table 7 that follows:.Table 7. Cake Job Orders received by the Chef with the respective processing times for Baking andDecoratingCake Job Order Baking Processing Time Decorating Processing TimeA 2 1B 8 5C 4 6D 9 7E 7 8F 9 6G 3 5 (i) Using Johnson’s Rule, determine the optimum sequence for processing the cake joborders through the baking and decorating stages.arrow_forwardhow could you break up the task list by each of the five floorsarrow_forwardQUESTION 1: Differentiate between a project and a program and highlight two major characteristics of a PROJECTarrow_forward
- What are the differences among job enrichment, job enlargement, job rotation, job specialization, and employee empowerment?arrow_forwardQUESTION 1You have completed your final semester in your Diploma II year and have joined a company in Muscat to do yourOn-the-Job training (OJT). You are working there in a software department. One Thursday morning the managercalls you to his office and gives you difficult task and asks you to complete it before leaving for the weekend. Thetime given is not enough and the work is also difficult. You do not have enough work experience or knowledge tocomplete the work. If you complete the work quickly the quality of the work may be poor. You feel frightened aboutyour manager and you are in a dilemma as to what you should do Questions:a.Identify the ethical problems in this situation. b.Find a solution to this problem. c.Explain the use of Business Ethics in solving these problems. Can ethics solve all our real life problems? Explainwith examples.arrow_forwardQUESTION TWO As an operations management intern at a Limpopo-based company, HGK Holdings, your role is to assist the operationsanalyst with reconfiguring a brownfield project at HGK’s industrial estate in the Limpopo province, code-named LPCHP1. The reconfiguration involves the installation of an advanced biomass unit which generates electrical andthermal energy by burning wood pellets produced as a by-product of the wood processing industry in the province.The process is commonly called cogeneration or CHP (combined heat and power) and it is expected to save cost andincrease operational efficiency at HGK Holdings. The electrical and thermal energy generated is expected to be utilisedin the operations of HGK Holdings. REQUIRED:Answer each of the following questions: 2.1. With the aid of an appropriately labelled Input-Transformation-Output diagram, comprehensively discuss thetransformation process underpinning the operations of LP-CHP1. In your discussion, highlight the transformedand…arrow_forward
- QUESTION 15 are a type of standing plan that are designed to give explicit instructions on how to complete a recurring task. A. Guidelines B. Rules C. Policies D. Proceduresarrow_forwardQuestion No. 2Mehmal Khan owns and operates a small retail store selling the outdoor clothing of an American manufacturer to a predominately college-student market. Lately, a large department store outside of town has started selling similar, but lower-priced clothing manufactured in China, Thailand, and Bangladesh.Mehmal believes she is starting to lose business to this store. Assume you are part of a student team assigned to do a management class project for Mehmal. Her question for the team is: “How can I best deal with my strategic management challenges in this situation?” How will you reply?arrow_forwardQuestion:-M Full explain this question and text typing work only.arrow_forward
- Need help with question 3 show workinarrow_forwardQuestion 1 Activity Activity Description Immediate Predecessors Estimated Duration A Excavate — 2 weeks B Lay the foundation A 4 weeks C Put up the rough wall B 10 weeks D Put up the roof C 6 weeks E Install the exterior plumbing C 4 weeks F Install the interior plumbing E 5 weeks G Put up the exterior siding D 7 weeks H Do the exterior painting E, G 9 weeks I Do the electrical work C 7 weeks J Put up the wallboard F, I 8 weeks K Install the flooring J 4 weeks L Do the interior painting J 5 weeks M Install the exterior fixtures H 2 weeks N Install the interior fixtures K, L 6 weeks Using the PERT method, draw the network map. Calculate the earliest start, earliest finish, latest start, latest finish, and slack times for each activity. Display results in a table format. Calculate the critical path.…arrow_forward1) Job design specifies the tasks that constitute a job for an individual or a group. Briefly describe the five components of job design?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.