Calculate the total operation time for this construction activity if the volume of soil to be removed is 8 cu.m. (considered 33% for bulking of materials.) The speed of dumptruck is 30 kph and travel distance (round trip) from the source to disposal area vice-versa is 6 km. The bucket size of excavator is 0.50 cu.m at 0.50 min loading time, tipping time is 4 mins.
a. 15.18 minutes
b. 22.02 minutes
c. 25.32 minutes
d. 30.00 minutes
A contractor is to excavate an area of 350′ × 150′ to a depth of 9′ and haul it by dump truck to a site where it is to be used for fill. The soil will then be fully compacted. If the swell factor is 25 percent and the shrinkage factor is 18 percent. Estimate the total bare cost for the job (excavation only) using a 2½ CY front-end loader, track mounted. Consider average nation price. Use the crew below.
Describe two (2) expected impacts to the physical environment for each stage of a quarry operation e.g. (Development, (Production/Operation) & Decommissioning).
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- underwhat condition would you preferborrowing new materials from a borrow pit for highwayembankmentarrow_forward1. for a project your company is a Haul away 350 bank cubic yards of sand. If the sand has a swell of 12% how many loose cubic yards of sand will need to be hard how many truckloads are required a Holden sent off so that each truck and haul 12 loose cubic yards? 2. if 750 compacted cubic yards of in-place oil is required for a project how many loads of import will be required. The important material has a swell of 30% in a 15% shrinkage factor the trucks can haul 10 loose cubic yards.arrow_forwardA surcharge of 100 kPa is applied over a large area above the soil profile shown in the figure below. Assume that the drainage length remains unchanged during the consolidation process. Calculate the time required in months to reach a consolidation ratio of 70% at Point A after applying the surchargarrow_forward
- A Highway contractor has four locations A, B, C, and D on a road contract which crushed stone is to be delivered. The stone, which is all of the same quality is to be supplied from three quarries 1, 2, and 3. The table below shows the relative transportation cost per cubic meter of transporting stone from each quarry to each site. However, the contractor discovered a technical problem in the third quarry, which results in a temporary shutdown of the facility. Based on this new condition, the contractor must deliver the crushed stone from the first and the second quarries only. Any shortage in the required crushed stone has to be covered from an external source. a) What is the optimal allocation of the crushed stone from each quarry to each location under the new circumstances? b) What is the transportation cost corresponding to the solution obtained in part a? c) Which of the four sites are affected by the shortage that results from the shutdown of the third quarry?arrow_forwardA project to move packed earth requires you to decide whether to usea dozer/scraper operation or excavator/truck operation. Determinethe most economical operation based on the dozer/scraper operationestimated at $1.25/cy. All equipment carries a rated heaped capacity, hasa fill factor of 100%, and works 45-min hours. Excavator costs $95/hr(including operator), cycle time is 0.28 min, and bucket heaped capacityis 5.0 cy. Truck costs $150/hr.(including operator), dump time is 0.5 min(maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks areavailable for the project.Hauling equipment operates in one directionfrom A to B to C and finally to D. Section Load Length (ft) Speed (mph) A full 3000 9B full 2500 17C empty 3000 36D empty 3000 16arrow_forwardAssuming that each load is a full-capacity load, howmany truckloads are required to construct the fill?arrow_forward
- An excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations?arrow_forwardCalculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390. b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.arrow_forwardGiven the following information, determine the cost of excavation, the number of loads required toremove the material and how many days it will take to complete the job.o 5225m3 of material is to be excavatedo Equipment cost is $280/houro Operator cost is $55/houro Equipment can remove 55m3/houro Assume 20% swell in soil when excavated for removal off siteo Trucks can carry 10m3o Work 10hr daysarrow_forward
- A hydraulic excavator was able to load a truck in 2 minutes and additional 30 seconds for the positioning of the truck. The hauling time, dumping time, and return time of the truck is about 25mins. What is the equipment utilization of the excavator if there are only eight trucks available during the loading operations? complete solutionarrow_forwardWhat is the aim of Jar test? And how can we choose the best coagulants?arrow_forwardYou're the project manager/engineer designing an Agitated Cement Slurry Storage Basin to be built on a mine site. 11. Specify arrangement and assembly requirements. 12. Advise stakeholders of selection and make any required adjustmentsarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,