Traffic and Highway Engineering - With Mindtap
Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
Question
Book Icon
Chapter 11, Problem 22P
To determine

The three potential problems with the given structure.

Blurred answer
Students have asked these similar questions
In a survey in the base year, the trip attraction, number of employees and shopping area in the zones are found as follows: Zone 1 2 3 4 5 6 7 8 9 10 Trip attraction (Trips/day) 34,000 33,000 37,000 9,000 19,000 20,000 50,000 22,000 21,000 5,000 Number of employees (persons) 2000 1500 3000 500 1000 1000 3200 1800 1600 200 Shopping area (m²) 250,000 350,000 150,000 80,000 160,000 180,000 350,000 60,000 100,000 50,000 Prepare a excel worksheet to calculate the generation model by regression analysis.
The present trip ends and travel time matrix between the zones are shown in Tables 6.75 and 6.76, respectively. Travel impendance factor between the zones may be assumed to be e-ti. The socio-economic adjustment factors between the zones may be assumed to one. Calculate the trip interchanges between the zones by using the gravity model. TABLE 6.75 Zones Trips produced Trips attracted 1 2 3 2500 3300 3200 TABLE 6.76 1 2 3 1-15 20 2 15 10 3 20 10 I 3000 4000 2000
4. The present trip ends and travel time matrix between the zones are shown in Tables 6.75 and 6.76, respectively. Travel impendance factor between the zones may be assumed to be e-tij, The socio-economic adjustment factors between the zones may be assumed to one. Calculate the trip interchanges between the zones by using the gravity model. TABLE 6.75 Zones Trips produced Trips attracted 1 2500 3000 2 3300 4000 3 3200 2000 TABLE 6.76 1 2 3 1 15 20 2 15 10 3 20 10
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning