How would the theory of constraints be used to improve output for the operations in the following problems?
- a. Problem 2.
- b. Problem 3.
- c. Problem 6.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Which of the following tasks would typically represent an operations management activity at Hard Rock Cafe?
A. receiving a shipment of incoming food ingredients
B. preparing an employee schedule
C. designing an efficient layout
D.all of the above
A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).a) Which operation is the bottleneck?b) What is the bottleneck time?c) What is the throughput time of the overall system?d) If the firm operates 8 hours per day, 20 days per month, whatis the monthly capacity of the manufacturing process?
Alocal toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01 201 2.13, 2.0, 2.61, 2.71 , and 2.95 minutes for A,B,C,D,E,F, and respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task Adoes not need any predecessorsB requires task A to completed. To start task C and task Deach require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed. Finally, task G can start only once task Fis completed.Given we apply the most remaining tasks rule for balancing the assembly line with ties broken according to longest task time firstthe tasks that will be assigned to the SECOND workstation are
Chapter 12 Solutions
Gen Combo Looseleaf Operations Management In Supply Chain; Connect Access Card
Ch. 12 - What types of scheduling decisions are management...Ch. 12 - Specify the kinds of objectives that might be...Ch. 12 - Prob. 3DQCh. 12 - How is the scheduling of patients in a doctor's...Ch. 12 - Describe the differences between Gantt charting,...Ch. 12 - Why are m n ma chine-scheduling algorithms not...Ch. 12 - What is the purpose of a planning and control...Ch. 12 - Prob. 8DQCh. 12 - Prob. 9DQCh. 12 - What scheduling rule should be applied to...
Ch. 12 - Prob. 11DQCh. 12 - Students must complete two activities to register...Ch. 12 - Prob. 2PCh. 12 - Sequence the jobs shown below by using a Gantt...Ch. 12 - In problem 3, assume there are two machines of...Ch. 12 - In problem 2, assume there are two machines of...Ch. 12 - The Security Life Insurance Company processes all...Ch. 12 - At the University Hospital, five blood samples...Ch. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Using the Gantt charts developed in the following...Ch. 12 - How would the theory of constraints be used to...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Three departments- milling (M), drilling (D), andsawing (S)- are assigned to three work areas in Victor Berardis'smachine shop in Kent, Ohio. The number of workpieces movedper day and the distances between the centers of the work areas,in feet, follow. Pieces Moved between Work Areas Each Day lt costs $2 to move I workpiece I foot.What is the cost?arrow_forwardIllinois Furniture, Inc., produces all types of officefurniture. The "Executive Secretary" is a chair that has beendesigned using ergonomics to provide comfort during long workhours. The chair sells for $130. There are 480 minutes availableduring the day, and the average daily demand has been 50 chairs.There are eight tasks: a) Draw a precedence diagram of this operation. •b) What is the cycle time for this operation?c) What is the theoretical minimum number of workstations?d) Assign tasks to workstations.e) What is the idle time per cycle?f) How much total idle time is present in an 8-hour shift?g) What is the efficiency of the assembly line, given your answer in (d)?arrow_forward14. A production line is to be designed to assemble a product. The assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete , and one of which requires 0.7 minutes to complete. If this production line has three workstations and a cycle time of 1.5 minutes , what is its efficiency ?arrow_forward
- Given the following task, times, and sequence, develop a balanced line capable of operating with a I 0-minute cycle time at Dave Visser's company. a) Draw the precedence diagram.b) Assign tasks to the minimum feasible number of workstations according to the greatest time remaining (ranked positional weight) decision rule.c) What is the efficiency of the process?arrow_forwardAlocal toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performied. The daily demand is 150 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires taskA to be completed. To start task Cand task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed. Finally, task G can start only once taskFis completed.What is the minimum number of workstations needed?arrow_forwardUse excel to show formulas 1. A company is designing a product layout for a new product. They plan to use this production line 16 hours a day in order to meet forecasted demand of 1200 units per day. For output to equal forecasted demand, what should be the actual cycle time for this production?arrow_forward
- For each of the problems listed, indicate precisely what or who would correspondto jobs and who or what would correspond to machines. In each case discuss whatobjectives might be appropriate and special priorities that might exist.b. Unloading cargo from ships at portarrow_forwardFor each of the problems listed, indicate precisely what or who would correspondto jobs and who or what would correspond to machines. In each case discuss whatobjectives might be appropriate and special priorities that might exist.d. Transferring long-distance phone calls from one city to anotherarrow_forwardA dress-making operation is being designed as an assemblyline. Table 10-22 shows the tasks that need to be performed, theirtask times, and preceding tasks. If the goal is to produce 30 dressesper hour, answer the questions that follow the table. (a) Compute the cycle time.(b) Which task is the bottleneck?(c) What is the maximum output for this line?(d) Compute the theoretical minimum number of stations.(e) Assign work elements to stations, using the longest tasktime rule.(f) Compute the effi ciency and balance delay of yourassignment.arrow_forward
- Sue Helms Appliances wants to establish an assem-bly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks,task times, and immediate predecessors for producing one MicroPopcorn Popper are as follows:TASK TIME (min) IMMEDIATEPREDECESSORSA 10 —B 12 AC 8 A, BD 6 B, CE 6 CF 6 D, Ea) What is the theoretical minimum for the smallest number ofworkstations that Helms can achieve in this assembly line?b) Graph the assembly line, and assign workers to workstations.Can you assign them with the theoretical minimum?c) What is the efficiency of your assignment?arrow_forwardEddys Pizza is currently redesigning its order-processing and pizza-making procedures for itsoperations which usually start at 5pm and close at 2am. For Eddys to meet customers’ speedydelivery requirement, six elements must be completed as summarised in the table below.WorkElementDescription Precedence Time (Mins)1 Receive customer order - 32 Shape dough 1 23 Prepare toppings 1 34 Assemble Pizza 2, 3 45 Bake pizza 4 46 Select complementary drink - 17 Deliver pizza 5, 6 4i. Draw the precedence diagram for the pizza making process.ii. If the demand for pizza is 90 pieces during the operating time, calculate the desired cycletime iii. Balance the line and calculate its efficiencyarrow_forwardMary Ann Clark is an artist and is employed by Fenway Racing. Fenway Racing manufactures custom race cars to exact specifications of drivers. Mary Ann's job is to hand paint logos and other custom artwork on each car. Below is her daily time sheet for March 7, 20X6: b.) How much of Mary Ann's time (after making the correction) is attributable to direct labor and how much to overhead? How is the direct labor cost assigned to individual jobs, and how is the overhead cost allocated?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY