An electrical engineer supervises the production of three types of electrical components. Three kinds of material-metal, plastic, and rubber-are required for production. The amounts needed to produce each component are
Component | Metal, g/component |
Plastic, g/component |
Rubber, g/component |
1 | 15 | 0.30 | 1.0 |
2 | 17 | 0.40 | .2 |
3 | 19 | 0.55 | 1.5 |
If totals of 3.89, 0.095, and 0.282 kg of metal, plastic, and rubber, respectively, are available each day, how many components can be produced per day?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
ENGINEERING ECONOMICS
On January 1, Orange Crates had assets of P30,000 and owner’s equity of P20,000. During the year, the company had cash revenue or income of P10,000, cash expenses of P8,000, paid 3,000 to its creditors, and its owner withdrew P1,000.
What are the assets, liabilities, and owner’s equity at the end of the year?
Do a Feasibility Analysis according to the following sections: Each section must
be thoroughly investigated with calculations to indicate the feasibility where
possible.
2.1.Economic Aspects of Renewable energy source evaluation
2.2.Basic concepts
2.3.Basic Methods for natural resource evaluation
2.4.Basic economic Problems
2.5.Cost-benefit analysis
2.6.Economic impact Analysis
MECHANICAL ENGINEERING
UPVOTE WILL BE GIVEN. PLEASE WRITE THE COMPLETE SOLUTIONS LEGIBLY. SHOW THE STEP-BY-STEP PROCESS WITH SHORT COMMENT/EXPLANATION. ANSWER IN 4 DECIMAL PLACES.
Two gaseous streams containing the same fluid enters a mixing chamber and leaves as a single stream. For the first gas the entrance conditions are A1=500 cm², v1=230 m/s, p1=1.60 kg/m³. For the second gas the entrance conditions are A2= 300 cm³, m2=8.84 kg/s, v2=0.502 m³/kg. The exit stream conditions is v3=130 m/s and v3=0.437 m3/kg.
Determine the following:
(a) the total mass flow leaving the chamber (kg/sec)
(b) the velocity of the gas at 2. (m/sec)
Chapter 12 Solutions
NUMERICAL METH. F/ENGR.(LL)--W/ACCESS
Ch. 12 - Chemical/Bio Engineering
12.1 Perform the same...Ch. 12 - Chemical/Bio Engineering If the input to reactor 3...Ch. 12 - Chemical/Bio Engineering Because the system shown...Ch. 12 - Chemical/Bio Engineering
12.4 Recompute the...Ch. 12 - Chemical/Bio Engineering Solve the same system as...Ch. 12 - Chemical/Bio Engineering
12.6 Figure P12.6 shows...Ch. 12 - Chemical/Bio Engineering
12.7 Employing the same...Ch. 12 - Chemical/Bio Engineering The Lower Colorado River...Ch. 12 - Chemical/Bio Engineering A stage extraction...Ch. 12 - Chemical/Bio Engineering
12.10 An irreversible,...
Ch. 12 - Chemical/Bio Engineering
12.11 A peristaltic pump...Ch. 12 - Chemical/Bio Engineering
12.12 Figure P12.12...Ch. 12 - Civil/Environmental Engineering A civil engineer...Ch. 12 - Civil/Environmental Engineering Perform the same...Ch. 12 - Civil/Environmental Engineering
12.15 Perform the...Ch. 12 - Civil/Environmental Engineering Calculate the...Ch. 12 - Civil/Environmental Engineering In the example for...Ch. 12 - Civil/Environmental Engineering Employing the same...Ch. 12 - Civil/Environmental Engineering Solve for the...Ch. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Civil/Environmental Engineering
12.22 A truss is...Ch. 12 - Electrical Engineering
12.23 Perform the same...Ch. 12 - Electrical Engineering Perform the same...Ch. 12 - Electrical Engineering
12.25 Solve the circuit in...Ch. 12 - Electrical Engineering
12.26 An electrical...Ch. 12 - Electrical Engineering
12.27 Determine the...Ch. 12 - Electrical Engineering Determine the currents for...Ch. 12 - Electrical Engineering The following system of...Ch. 12 - Electrical Engineering
12.30 The following system...Ch. 12 - Mechanical/Aerospace Engineering Perform the same...Ch. 12 - Mechanical/Aerospace Engineering
12.32 Perform the...Ch. 12 - Mechanical/Aerospace Engineering
12.33 Idealized...Ch. 12 - Mechanical/Aerospace Engineering Three blocks are...Ch. 12 - Mechanical/Aerospace Engineering Perform a...Ch. 12 - Mechanical/Aerospace Engineering Perform the same...Ch. 12 - Mechanical/Aerospace Engineering
12.37 Consider...Ch. 12 - Mechanical/Aerospace Engineering The steady-state...Ch. 12 - Mechanical/Aerospace Engineering
12.40 A rod on a...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.Similar questions
- 1.22 In order to prevent frostbite to skiers on chair lifts, the weather report at most ski areas gives both an air temperature and the wind-chill temperature. The air temperature is measured with a thermometer that is not affected by the wind. However, the rate of heat loss from the skier increases with wind velocity, and the wind-chill temperature is the temperature that would result in the same rate of heat loss in still air as occurs at the measured air temperature with the existing wind. Suppose that the inner temperature of a 3-mm-thick layer of skin with a thermal conductivity of 0.35 W/m K is and the air temperature is . Under calm ambient conditions the heat transfer coefficient at the outer skin surface is about (see Table 1.4), but in a 40-mph wind it increases to . (a) If frostbite occurs when the skin temperature drops to about , do you advise the skier to wear a face mask? (b) What is the skin temperature drop due to the wind?arrow_forwardA company produces three products, A, B, and C. The sales volume for A is at least 50% of the total sales of all three products. However, the company cannot sell more than 80 units of A per day. The three products use one raw material, of which the maximum daily availability is 240 lb. The usage rates of the raw material are 2 lb per unit of A, 4 lb per unit of B, and 3 lb per unit of C.The unit prices for A, B, and C are $20, $50, and $35, respectively. a) Determine the optimal product mix for the company. b) Determine the dual price of the raw material resource and its allowable range. If available raw material is increased by 120 lb, determine the optimal solution and the change in total revenue using the dual price. c).Use the dual price to determine the effect of changing the maximum demand for product A by +10 units.arrow_forwardMULTIPLE CHOICE 1.) Liquid movement due to surface forces = a. liquid diffusion b. vapor diffusion c. capillary flow d. hydrodynamic flow 2.) Vapor movement due to temperature difference a. hydrodynamic flow b. thermal diffusion c. liquid diffusion d. capillary flowarrow_forward
- The data provided by a company for the year 2020 – 2021 to carry out Break Even Analysis and provide them the results, complete analysis and suggestions. The data is as follows:Building rent 20000 R.O Every month instalments 30000 R.OThe estimated sales are 750000.0 R.OMaterial Cost / unit 15.0 R.OProduction cost / unit 8.0 R. OTransportation & other Costs / unit (Approx) 4.00 R. O Maintenance cost / unit 1.5 R. O Salary of the employees / unit 0.8 R.OMarketing and advertisement cost / unit 0.7 R. OEach unit is sold at price 35.0 R. O Construct the B.E.P chart on a graph sheet and indicate, B.E.P, M.o.S and also indicate the new B.E.P & M.o.S after the improvement measures has been taken (With different colours). Show the calculations for the following parameters separately before and after the measures taken.1. Determine the B.E.P2. Determine the profit 3. Margin of safety.Also write your decisions taken to improve the profits of the company and to reduce the B.E.P.arrow_forwardAccording to the Theory of Constraints, all the money invested in a system in purchasing things that it intends to sell is inventory Select one: True Falsearrow_forwardNew York Building Corporation uses the critical path method to monitor construction jobs. The company is currently 2 weeks behind schedule on Job #181, which is subject to a P10,500 per week completion penalty. Path A-B-C-F-G-H-I has a normal completion time of 20 weeks, and critical path A-D-E-F-G-H-I has a normal completion time of 22 weeks. The following activities can be crashed. Activities Cost to Crash 1 Week Cost to Crash 2 Weeks BC P 8,000 P15,000 DE 10,000 19,600 EF 8,800 19,500 REQUIRED: 1. New York Building desires to reduce the normal completion time Job #181 and, at the same time, report the highest possible income…arrow_forward
- Engineering Economy A company has determined the price and the monthly demand of its products are related by the equation D = √775 - p, where p is the price per unit in dollar and D, is the monthly demand. The associated fixed costs are $2,125 per month and the variable costs are $100/ unit. Use this information to answer the following: a)What is the optimal number of units that should be produced and sold each month? b) What is the maximum profit? c)Determine the value of D that represents the break-even point?arrow_forwardA generous benefactor donates $500,000 to a state university. The donation is to be used to fund student scholarships. Determine the dollar amount of scholarships that can be awarded each year under each of the following conditions. The state university earns 4% per year on its investments. Solve, a. The donation is a quasi-endowment designed to last 20 years. b.The donation is a quasi-endowment designed to last 30 years. c. The donation is a quasi-endowment designed to last 50 years. d. The donation is an endowment designed to last forever.arrow_forwardThe mean weight of five complete computer stations is 167.2 pounds. The weights of four of the computer stations are 158.4 pounds, 162.8 pounds, 165.0 pounds, and 178.2 pounds respectively. What is the weight of the fifth computer station?arrow_forward
- Combustion engineering A coal sample gave the following analysis by weight, Carbon 68.95 per cent, Hydrogen 9.16 per cent, Oxygen 2.17 per cent, the remainder being incombustible. For 97% excess air , determine actual weight of air required per kg of coal. Round your answer to two decimal places.arrow_forwardWhich of the following does not correctly represent a dependent and independent relationship? a. Independent variable:Time of day Dependent variable: Outside temperature b. Independent variable:Number of gallons of gas in a car’s tank Dependent variable: Number of miles a car can be c. Independent variable:Number of coins put into a gumball machine Dependent variable: Number of gumballs d. Independent variable: Pace of a runner in a race Dependent variable: Time it takes to complete the racearrow_forwardEstimate the effort, time, production and the number of personnel necessary for the development of a Communications system that has a size of 30,000 LDC. In this project there are factors that influence the development and ensure the proper functioning of the system. These are: Complexity of development, staff qualification and advanced knowledge of the language in which it will be developed. Each factor in the order described has a weighted value of 1.15, 0.7 and 0.91 respectively. It is important to mention that the monthly payment per person working in the development is $2,200.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Principles of Heat Transfer (Activate Learning wi...Mechanical EngineeringISBN:9781305387102Author:Kreith, Frank; Manglik, Raj M.Publisher:Cengage LearningRefrigeration and Air Conditioning Technology (Mi...Mechanical EngineeringISBN:9781305578296Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill JohnsonPublisher:Cengage Learning
Principles of Heat Transfer (Activate Learning wi...
Mechanical Engineering
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Cengage Learning
Refrigeration and Air Conditioning Technology (Mi...
Mechanical Engineering
ISBN:9781305578296
Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Publisher:Cengage Learning
Matrix Factorization - Numberphile; Author: Numberphile;https://www.youtube.com/watch?v=wTUSz-HSaBg;License: Standard YouTube License, CC-BY