Inventory Control at Wheeled Coach Video Case
Controlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and
In a crowded ambulance industry in which it is the only giant, its 45 competitors don’t have the
Accurate bills of material (BOM) are a requirement if products are going to be built on time. Additionally, because of the custom nature of each vehicle, most orders are won only after a bidding process. Accurate BOMs are critical to cost estimation and the resulting bid. For these reasons, Collins was emphatic that Wheeled Coach maintain outstanding inventory control. The Global Company Profile featuring Wheeled Coach (which opens Chapter 14) provides further details about the ambulance inventory control and production process.
Discussion Questions *
* You may wish to view the video that accompanies this case before answering these questions.
- 1. Explain how Wheeled Coach implements ABC analysis.
- 2. If you were to take over as inventory control manager at Wheeled Coach, what additional policies and techniques would you initiate to ensure accurate inventory records?
- 3. How would you go about implementing these suggestions?
Want to see the full answer?
Check out a sample textbook solutionChapter 12 Solutions
Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
- Instruction: Answer what is being required. You may compute them manually or use the Excel QM.Pencil number 2 at the campus book-store are sold at a fairly steady rate of $60 per week. It cost the bookstore $12 to initiate an order to its supplier and holding costs are $0.005 per pencil per year.Determine◦ How much is the Annual holding cost?◦ How much is the Annual ordering cost? ◦ What is the total annual inventory cost?If the order lead time is 4 months, determine the reorder point.Please Illustrate the inventory profile graphically.What additional cost would the book-store incur if it orders in batches of 1000?arrow_forwardInventory Management Basic EOQ The Knight Company operates 365 days a year and uses 210 liners each day. Using a Continuous Inventory System, Knight orders 10,950 liners at a time. The orders are timed so that the new liners arrive just as inventory runs out (i.e. inventory level = 0). If = $1100, what is the total ordering cost for all orders in a year (Annual Ordering Cost)? Assume the delivery truck is unloaded instantly when it arrives. What is the maximum inventory level? What is the average inventory level? Hint: the company pulls liners from inventory at a constant rate.arrow_forwardGive 3 examples of inventory risk.arrow_forward
- Question 3Every company or organisation placed inventory as an important aspect for their businesses. Discuss the need to manage inventory in the monetary context. answer guidelines Discuss the need to manage inventory in monetary/financial aspects, below are some points. • Inventory has value tagged to it and must be account for. • Inventory is counted among a company’s current assets because it can be sold within a year. • Inventory also shows up on the income statement in the form of cost of goods sold (cost that are incurred to make the product including direct labor, direct materials and overheads). • Higher inventory carried means need to incur higher carrying costarrow_forwardRicky Orange’s annual demand is 12,500 units. Ordering cost is $100 per order. Holding cost is estimated at 20% of product cost which is $50 per unit. What is the number of orders per year using EOQ to compute the best quantity to order?arrow_forwardControlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only…arrow_forward
- Controlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only…arrow_forwardControlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only…arrow_forwardControlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only…arrow_forward
- Controlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only…arrow_forwardControlling inventory is one of Wheeled Coach’s toughest problems. Operating according to a strategy of mass customization and responsiveness, management knows that success is dependent on tight inventory control. Anything else results in an inability to deliver promptly, chaos on the assembly line, and a huge inventory investment. Wheeled Coach finds that almost 50% of the cost of every ambulance it manufactures is purchased materials. A large proportion of that 50% is in chassis (purchased from Ford), aluminum (from Reynolds Metal), and plywood used for flooring and cabinetry construction (from local suppliers). Wheeled Coach tracks these A inventory items quite carefully, maintaining tight security/control and ordering carefully so as to maximize quantity discounts while minimizing on-hand stock. Because of long lead times and scheduling needs at Reynolds, aluminum must actually be ordered as much as 8 months in advance. In a crowded ambulance industry in which it is the only giant,…arrow_forwardEconomic Order QuantityA pipe manufacturer requires a chemical for making plastic at the rate of 6000gallons per year. The cost of keeping the chemical storage is $10 per gallon peryear. Ordering costs are $200 per order. The chemical is bought at $45 pergallon.What is the EOQ and the Annual Total Cost?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.