a steelworks foreman, 2 skilled steelmen, and a steelmen helper can finish 461 kg of rebar installation in a week. Calculate the unit labor cost per kg of rebar installation using the following data.
Question 11
Estimate the board feet of 30 pieces of lumber 2 X 6 inches and 10 feet long. 1) 200 2) 100 3) 300 4) 400 Saved
Determine the Average Cost if the total cost of the production is $150 and the total numbers of production unit is $100.
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Register number is 653 plz slove in 3 hours I am waiting it's my life riskarrow_forwardWhat is the hazard associated with a centrifuge, and how will you minimize the risk Want asaparrow_forward(From Fundamentals of construction estimating book 4th edition ) 8.) If the output is expected to be on the high end of the scale, what would be the labor price to install 210 lb asphalt shingles based in Figure 12.5 data?arrow_forward
- True or False? The total machinery area for a machine is determined by identifying the floor space for each machine, machine travel, maintenance and service area requirements.arrow_forwardA light manufacturing firm has set up a project for develop- ing a new machine for one of its production lines. The most likely estimated cost of the project itself is $1,000,000, but the most optimistic estimate is $900,000 while the pessimists predict a project cost of $1,200,000. The real problem is that even if the project costs are within those limits, if the project itself plus its implementation costs exceed $1,425,000, the project will not meet the firm’s NPV hurdle. There are four cost categories involved in adding the prospective new machine to the production line: (1) engineering labor cost, (2) nonengineering labor cost, (3) assorted material cost, and (4) production line downtime cost. The engineering labor requirement has been estimated to be 600 hours, plus or minus 15 percent at a cost of $80 per hour. The nonengineering labor requirement is esti- mated to be 1,500 hours, but could be as low as 1,200 hours or as high as 2,200 hours at a cost of $35 per hour. Assorted…arrow_forwardDetermine the following; J = ? x 106 mm4 P = ? N τmax = ? MPa τmin = ? MPa Please provide clear solution, 100% guarantee to vote it up. Thank you.arrow_forward
- What are the ways in which to store the tirfor machine?arrow_forwardPaint Y costs P1000 per gallon and can be applied at a rate of 125 ft² per hour. If the area to be painted is 100ft2 and the painter is paid P50 per hour, how much is labor cost per hour?arrow_forwardGiven the table below, calculate the total cost for all the items needed. What would be the total estimate with a 15 percent contingency? If a 10 percent reserve is added, what would be the total estimate? Items Cost/Unit Quantity Wheel $500 12 Bearing $25 400 Clamp $5 40 Nozzle $7 30 Nut $2 40 Caster $55 120arrow_forward
- A labor crew for placing concrete consists of one labor foreman at $27.69 per hour, one cement finisher at $29.30 per hour, 4 laborers at $24.45 per hour each, and one equipment operator at $34.3 per hour. Such a crew, called a C20 crew, can place 156 cubic yards of concrete per 8-hour day. Determine the cost of C20 crew per cubic yard of concrete. The cost of C20 crew per cubic yard of concrete is determined to be $arrow_forwardPrior to concrete pouring of a slab on grade, a polyethylene sheet it to be laid on the ground. The slab dimension is 30 meters wide and 50 meters length, how many linear meter of 12 feet wide PE sheet you’ll need for this activity? a. 400 l.m. b. 450 l.m. c. 500 l.m. d. 1673 l.m. What is total material of PE sheet, if the cost per 50 m. is Php 7,000? a. Php 56,000.00 b. Php 63,000.00 c. Php 70,000.00 d. Php 238,000.00arrow_forwardENGINEERING MECHANICS (UPVOTE WILL BE GIVEN. PLEASE WRITE THE COMPLETE SOLUTIONS LEGIBLY. NO LNG EXPLANATION. ANSWER IN 2 DECIMAL PLACES.) 9.29 As a round log passes through a sawmill, two slabs are cut off, resulting in the cross section shown. Calculate Ix of the cross section if h = R/2. What is the percentage reduction in Ix caused by the sawing operation?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License