MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
5th Edition
ISBN: 9781305577398
Author: Nicholas J. Garber; Lester A. Hoel
Publisher: Cengage Learning US
bartleby

Concept explainers

Question
Book Icon
Chapter 13, Problem 21P
To determine

The scores for each alternative and recommendation of a preferred alternative for development.

Blurred answer
Students have asked these similar questions
The Department of Traffic is considering three improvement plans for a heavily traveled intersection within the city. The intersection improvement is expected to achieve three goals: improve travel speeds, increase safety, and reduce operating expenses for motorists. The annual dollar value of savings compared with existing conditions for each criterion as well as additional construction and maintenancecosts is shown in the table below. If the economic life of the road is considered to be 60 years and the discount rate is 3.5%, which alternative should be selected? Solve the problem using the four methods for economic analysis.
12) List and define the 4 steps of the "4-step travel demand model" used in transportation planning.
For this exercise, you are to design a roadway that is to carry 100,000 people a day (excluding truck occupants) – 50,000 in design direction. The vehicles that carry these people include; (1) personal vehicles (average occupancy of 1.2 people per car) 2-2 kip single axles, and (2) buses with 2-22 kip single axles (assume they are filled with an average of 40 passengers). There are also trucks on the roadway and all trucks have 1-40 kip triple axle, 1-32 kip tandem axle, and 1-8 kip single axle. You know that the soil CBR is 6, the initial PSI is 4.5 and the TSI is 2.5. Other values to be used:  All drainage coefficients = 1.0  Reliability = 90%  Overall standard deviation of traffic = 0.50  Concrete Modulus of Elasticity = 5.5 million lb/in2  Concrete Modulus of Rupture = 750 lb/in2  PCC load transfer coefficient = 3.0 Design a rigid and flexible pavement, to last 15 years, for a four-lane road (four lanes in design direction) with 400 trucks per day in the design direction, and…
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning