a)

Summary Introduction

To construct: A product structure.

Introduction:

Product structure:

The product structure is a visual representation of the components needed for a product assembly and the sequence at which they must be developed. It will clearly depict the parents and children components at each level.

b)

Summary Introduction

To construct: A time-phased product structure.

Introduction:

Time-phased product structure:

The time-phased product structure will represent the product and the associated components visually with the details of the time at when each component must begin production. It is done to ensure that all the components are developed on time.

c)

Summary Introduction

To develop: A net requirements plan.

Introduction:

Net requirements plan:

The net requirements plan is the plan which is established on the gross requirements plan formed by deducting the stock on and the scheduled receipts. If the total requirement is below the safety stock levels, a planned order is made based on the given lot sizing technique.

Blurred answer
Students have asked these similar questions
Electro Fans has just received an order for one thousand 20˝ fans due in week 7. Each fan consists of a housing assembly, two grills and a fan assembly. The housing assembly consists of a frame, two supports and a handle. The following table gives lead times, on-hand inventory, and scheduled receipts. Table 1.1:  Lead time and quantity on hand Item Lead Time Qty on hand Lot size# Scheduled receipt 20˝ Fan   Housing       Frame        Supports (2)        Handle   Grills (2)   Fan Assembly        1 1 2 1 1 2 3   80 90 - 50 400 200* 150   - - - 100 400 450 -               50 fan assembly  in week 2   * In week 3 it was found that 50% of the on hand inventory of the grills was damaged. # Items without any lot size given should be considered as lot-for-lot.   (i) Construct a product structure. (ii) Construct a time-phased product structure. (iii) Prepare a net requirement plan.
Problem 6 Part A:Available to promise in period 4 = 50Problem 6 Part B:PAB in period 7 = 35 In part A, the only thing that you need to do is to calculate the ATP in periods 1,4,5, and 7. In part B, remember that you are rolling through time. The part B solution spreadsheet starts with time period 2 and period 1 is now history. For the part B, you must capture all of the events that occurred during week 1. For example, I gave you that the beginning PAB is 45. If you had 20 in stock (from part A), you produced 50 as planned in period 1, and the actual demand for period 1 was 25, then the beginning PAB (your stock quantity) is 20+50-25=45. The forecast and MPS quantities will not change from part A to part B. After you accept each of the orders (simply add the new order quantities to the existing customer order quantities in the correct time bucket), you will then recalculate the PAB, and then recalculate the ATP.
The ATV Corporation makes three models of all-terrain vehicles: Model A, Model B, and Model C. Model A uses a 0.4-liter engine, Model B uses a 0.5-liter engine, and Model C uses a 0.6-liter engine. The aggregate production plan is the twelve-month plan that combines all three models together in total monthly production. The planning horizon is twelve months. The APP determines the size of the workforce, which is the constrained resource. Assume that the beginning inventory for January is 120 units (30 units each of Model A and Model B, and 60 units of Model C). The firm desires to have an ending inventory of 160 units at the end of the year. On average, one unit of ATV requires eight labor hours to produce, and a worker contributes 160 hours (8 hours × 5 days × 4 weeks) per month. The data has been collected in the Microsoft Excel Online file attached. Answer the question below: 1. What are the totals of the forecast demand (including inventory adjustment for December), production,…

Chapter 14 Solutions

Operations Management: Sustainability and Supply Chain Management, Student Value Edition (12th Edition)

Ch. 14 - Prob. 11DQCh. 14 - Identify five specific requirements of an...Ch. 14 - What are the typical benefits of ERP?Ch. 14 - What are the distinctions between MRP, DRP, and...Ch. 14 - As an approach to inventory management, how does...Ch. 14 - What are the disadvantages of ERP?Ch. 14 - Use the Web or other sources to: a. Find stories...Ch. 14 - Prob. 18DQCh. 14 - Use the Web or other sources to identify what an...Ch. 14 - You have developed the following simple product...Ch. 14 - You are expected to have the gift bags in Problem...Ch. 14 - Prob. 3PCh. 14 - Prob. 4PCh. 14 - The demand for subassembly S is 100 units in week...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Refer again to Problems 14.3 and 14.4. In addition...Ch. 14 - Refer again to Problems 14.3 and 14.5. In addition...Ch. 14 - a. Given the product structure and master...Ch. 14 - Prob. 11PCh. 14 - Based on the data in Figure 14.13, complete a net...Ch. 14 - Prob. 13PCh. 14 - A part structure, lead time (weeks), and on-hand...Ch. 14 - You are product planner for product A (in Problem...Ch. 14 - Prob. 16PCh. 14 - Prob. 17PCh. 14 - Data Table for Problems 14.17 through 14.20 14.17...Ch. 14 - Develop an EOQ solution and calculate total...Ch. 14 - Develop a POQ solution and calculate total...Ch. 14 - Using your answers for the lot sizes computed in...Ch. 14 - Prob. 26PCh. 14 - Grace Greenberg, production planner for Science...Ch. 14 - Karl Knapps, Inc., has received the following...Ch. 14 - Coleman Rich, Ltd., has received the following...Ch. 14 - Prob. 31PCh. 14 - Using the data for the coffee table in Problem...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.