Concept explainers
a)
To determine: The change in the items due to the change in the lead time of item G.
Introduction:
Net requirements plan:
The Net requirements plan is the plan which is established on the Gross requirements plan formed by deducting the stock on and the
b)
To determine: The implications of the production plan because of change in the lead time of item G.
Introduction:
Net requirements plan:
The Net requirements plan is the plan which is established on the Gross requirements plan formed by deducting the stock on and the Scheduled receipts. If the total requirement is below the safety stock levels, a planned order is made based on the given lot sizing technique.
c)
To determine: The options the
Want to see the full answer?
Check out a sample textbook solutionChapter 14 Solutions
EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
- Discuss how is CVP analysis used to calculate the break even point for multiple products?arrow_forwardThe Betterbilt Construction Company designs and builds residential mobile homes. Thecompany is ready to construct, in sequence, 16 new homes of 2,400 square feet each. Thesuccessful bid for the construction materials in the first home is $64,800, or $27 per square foot.The purchasing manager believes that several actions can be taken to reduce material costs by8% each time the number of homes constructed doubles. Based on this information,a. What is the estimated cumulative average material cost per square foot for the first fivehomes?b. What is the estimated material cost per square foot for the last (16th) home?arrow_forwardDraw a simple bill-of-materials (BOM) for a smart phone given the following requirements: (a) clearly label the end item and each component, (b) the BOM must contain no more than ten items, (c) the BOM must contain at least three levels (you may count the end-item level zero).arrow_forward
- An electric hand drill would take 15, 40, 10, 20, 50, and 30 units in the next 6 weeks. The marketing department has booked orders for the first, second, third, and fourth weeks for 20, 25, 10 and 20 units in all. Currently, there are 30 hand boxes in order. The strategy should be ordered in several 60 units. One week is lead period. Lead time. A. Develop the MPS hand drill log. b. A hand drill dealer puts an order for 15 units. What is the correct date of shipment for the whole order?arrow_forwardIn which product life cycle the scope, schedule, and cost are determined early, and changes to scope are carefully managed? 1) Iterative 2) Incremental 3) Predictive 4) Adaptivearrow_forwardGary’s Seasoning wants to increase its capacity by adding more blending and packagingmachines. Two vendors have presented proposals. Vendor A’s equipment costs $11,500 and the variable cost per unit is $2.00. Vendor B’s equipment costs $13,500 and the variable cost per unit is $1.75. Selling price for each seasoning packet for $4.00.a. What is the break-even point for each proposal?b. If the expected volume is 7,500 packages, which vendor should be chosen? (Show all calculations to earn full credit)arrow_forward
- Calculate the break-even for all three years for bagels and bagel sandwiches.arrow_forwardAdidas is an athletic company designs and manufacturesseveral athletic things. Football is one of the company'sproducts that sells for $40 per unit. Total fixed costs relatedto the manufacturing of the football are $150,000 per monthand variables costs involved in manufacturing are $ 15 perunit. 1- Compute the break- even point of the football in unitsand dollars?arrow_forwardEC 4 Q4 At the end of the year, but before an adjustment had been made to close Manufacturing Overhead Control, A-1 Frames had the following account balances: Raw Materials Inventory $ 126,870 Work in Process Inventory $ 147,660 Finished Goods Inventory $ 343,200 Cost of Goods Sold $ 1,959,640 At the beginning of the year, management had estimated that total manufacturing overhead would be $590,520 and had planned to apply overhead to jobs based on an estimated use 42,180 of machine hours. The actual number of machine hours used during the year was 49,600, and actual manufacturing overhead cost for the year was $722,500.arrow_forward
- coventry PLC had 27,000 units in production during May. Of these 27,000 units, 25,000 units were started during the month. By the end of May, 23,000 units were completed and transferred to finished goods. Cost associated with the beginning inventory was £125,000. Manufacturing costs totalling £850,000 were added during the period. coventry PLC uses the FIFO method and adds all direct materials at the beginning of the process. What is coventry PLC'S cost per unit for direct materials ?arrow_forward“means-ends analysis”. Provide an ORIGINAL example in which you state and illustrate the three steps involvedarrow_forwardWhat characteristics of a "good" requirements document (rather than the characteristics of a single demand) should be considered? List and describe four (4) characteristics of a "good" requirements document, as well as their relative relevance.arrow_forward