Concept explainers
Courtney Kamauf schedules production of a popular Rustic Coffee Table at Kamauf Enterprises, Inc. The table requires a top, four legs
Want to see the full answer?
Check out a sample textbook solutionChapter 14 Solutions
Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+)
- Consider the following information. PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 100 Q = 60, LT= 3 weeks, Safety Stock = 5 1 70 70 PART X Gross Requirements Scheduled Receipts Projected On-Hand Inventory 100 Planned Order Releases 1 70 70 100 2 0 > X WEEK 3 40 Compute the planned order releases and projected on-hand inventory for component part X. Round your answers to the nearest whole number. If your answer is zero, enter "0". 2 0 4 0 100 WEEK 3 40 5 160 60 4 0 40 0 X 5 160 Check My Work -60 0arrow_forwardHeather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 10. Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering. Item Lead Time On-Hand Inventory Components Stepper 2 10 A(2), B(2), C(1) A 1 10 D(1), F(2) B 2 20 E(1), F(3) C 3 10 D(2), E(3) D 2 15 E 2 5 F 2 20 c) Develop a net material requirements plan for F (enter your responses as whole numbers). Week Lead Time Item 3 4 5 6 7 8 9 10 (weeks) F Gross req enter your response here enter your response here 2 On hand enter your response here enter your response here Net req enter your response here enter your response here Order…arrow_forwardHeather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 8. Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering. Item Lead Time On-Hand Inventory Components Stepper 2 20 A(2), B(2), C(2) A 1 10 D(1), F(2) B 2 20 E(2), F(3) C 2 10 D(2), E(1) D 1 15 E 2 5 F 2 20 c) Develop a net material requirements plan for F (enter your responses as whole numbers). Week Lead Time Item 1 2 3 4 5 6 7 8 (weeks) F Gross req 2 On hand Net req enter your response here enter your response here Order receipt enter your response here enter your…arrow_forward
- Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level 0 kits. Complete the MRP records, using the following information: • Production plans for complete kits are as follows: Start assembling 4,500 kits in week 2 Start assembling 1,000 kits in weeks 3, 4, and 5 Start assembling 8,000 kits in week 6 • The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements. • All scheduled receipts, lead times, and beginning inventory levels are shown. Click the icon to view the MRP records. Construct the material requirements plan for item System unit (enter your responses as whole numbers). System unit: Lead Time = 1 week; Minimum order quantity = 3,500 Week 1 2 3 Gross requirements 4,500 1,000…arrow_forwardDemand for portable music players for joggers has caused Nancy Industries (Nancy) to grow almost 50 percent over the past year. The number of joggers continues to expand, so Nancy expects demand for music player to also expand, because, as yet, no safety laws have been passed to prevent joggers from wearing them. Demands for the players for last year was as follows : Month Demand (units) Jan 4200 Feb 4300 Mar 4000 Apr 4400 May 5000 Jun 4700 Jul 5300 Aug 4900 Sep 5400 Oct 5700 Nov 6300 Dec 6000 Question : From the choice of simple moving average, weighted moving average, exponential smoothing, and linear regression analysis, which forecasting technique would you consider the most accurate to Nancy Industries? Why?arrow_forward14.26. Calculate the available-to-promise row in the following matrix: Period On Hand = 100 1 2 3 4 5 6 Forecast 50 100 50 100 50 100 Customer Orders 50 125 75 175 45 15 Master Production 200 200 Schedule Available-to-Promisearrow_forward
- Explain how is ordering in small lot sizes essential for just in time implementation and what benefi are epected to be achieved ?arrow_forwardRefer to Figure 11.23 and Solved Problem 1. If inventory consists of two units of B, one unit of F. and three units of G, how many units of G. E. and D must be purchased to produce five units of product A? Figure 11.23 for Product A D(1) LT-3 B(3) LT-2 EG LT-6 FIT) CO) LT-1 GALA LT=3 D(1) LT-3 LT-Lead timearrow_forwardDiscuss why order-point systems aren’t compatible with MRParrow_forward
- Discount-Mart (see Problem 16.8), as part of its newLean program, has signed a long-term contract with SpecialtyLighting and will place orders electronically for its halogen lamps.Ordering costs will drop to $.50 per order, but Discount-Mart alsoreassessed its carrying costs and raised them to $20 per lamp.a) What is the new economic order quantity?b) How many orders will now be placed?c) What is the total annual cost of managing the inventory withthis policy?arrow_forward14 Uncommitted inventory that is physically on-hand is called ______. a ready-to-buy b ready-to-sell c made-to-stock d available-to-promise 15 Which system calculates materials, subassemblies, and components required for end item production? a production planner b master production schedule c capacity requirements planning d materials requirements planning 16 What is the process that identifies which parent item has generated requirements for a component called? a where-used analysis b splitting c pegging d nettingarrow_forwardComplete the master production schedule based on the following information On-hand Inventory - 160 schedule production whenever projected on-hand inventory drops below - 30 MPS lot size - 300 Week 1 2 3 4 5 6 7 8Forecast 120 100 130 110 140 140 170 180 Customer Orders 110 100 75 50 32 11 5 0Projected On-Hand Inventory 160MPSAvailable-to-Promisearrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.